Managing Director's AGM Presentation
Released
Released
Announcement PDF
Andromeda
The Great White
Mineral Company
Annual General Meeting –
Managing Director’s Report
22 November 2023
ASX:ADN
andromet.com.au
Level 10, 431 King William Street, Adelaide, South Australia 5000
+61 8 7089 9800
Authorised for release by the Board of Andromeda Metals Ltd
Disclaimer and Qualifications
No warranty
No investment or financial product advice
The information contained in this presentation does not constitute investment advice or financial product
advice (nor taxation or legal advice) and is not intended to be used as the basis for making an investment
decision or as a recommendation to acquire securities in Andromeda.
While care has been taken in preparing the information in this presentation, no representation or warranty, express or
implied, is made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and
conclusions contained in this presentation. The information in this presentation has been obtained from or based on
sources believed by Andromeda to be reliable. This includes references to test results and reports completed by external
parties.
The information contained in this presentation should not be relied upon as a recommendation or forecast
by Andromeda (including as to the performance of Andromeda or its share price). Readers should obtain
their own professional advice and carry out their own independent investigations and assessment of the
information in this presentation (including any assumptions) before acting.
An investment in Andromeda is subject to investment and other known and unknown risks, some of which
are beyond the control of Andromeda including loss of income and principal invested.
This presentation has been prepared without taking into account any particular person’s objectives, financial
situation or needs; does not purport to identify the nature of specific market or other risks associated with any
investment in the Company and does not constitute any legal, taxation, investment or accounting advice.
An investment in Andromeda's securities is subject to investment and other known and unknown risks, some
of which are beyond the control of Andromeda including loss of income and principal invested. Any
investment decision should be based only on a person's own due diligence, inquiry, assessment and
professional advice.
Forward-looking statements
This presentation contains or may contain certain forward-looking statements and comments about future
events, that are based on Andromeda's beliefs, assumptions and expectations and on information currently
available to management as at the date of this presentation. Often, but not always, forward-looking
statements can generally be identified by the use of forward-looking words such as "may", "will", "expect",
"plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated
production and production potential, financial forecasts, product quality estimates of future Mineral
Resources and Ore Reserves.
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which
could cause actual values, results or performance achievements to differ materially from those expressed or
implied in this presentation.
Where Andromeda expresses or implies an expectation or belief as to future events or results, such
expectation or belief is expressed in good faith and on a reasonable basis. No representation or warranty,
express or implied, is made by Andromeda that the matters stated in this presentation will in fact be
achieved or prove to be correct. Except as required by law, Andromeda undertakes no obligation to
provide any additional or updated information or update any forward-looking statements whether on a
result of new information, future events, results or otherwise.
Readers are cautioned against placing undue reliance on forward-looking statements. These forwardlooking statements are not guarantees of future performance and involve known and unknown risks,
uncertainties, assumptions and other important factors, many of which are beyond the control of
Andromeda, the directors, and management of Andromeda. These factors include, but are not limited to
difficulties in forecasting expected production quantities, the potential that any of Andromeda’s projects
may experience technical, geological, metallurgical and mechanical problems, changes in market prices
and other risks not anticipated by Andromeda, changes in exchange rate assumptions, changes in product
pricing assumptions, major changes in mine plans and/or resources, changes in equipment life or capability,
emergence of previously underestimated technical challenges, increased costs, and demand for
production inputs.
Information in this presentation which is attributed to, or derived from, a third-party source has not been independently
checked or verified by Andromeda. No representation or warranty is made as to the accuracy, completeness or reliability
of such information.
To the maximum extent permitted by law, neither Andromeda nor its related corporations, Directors, officers, employees,
advisers or agents, nor any other person, accepts any liability, including, without limitation, any liability arising from the use
of this presentation or its contents or otherwise arising in connection with them, nor guarantees or makes
any representations or warranties, express or implied, as to or takes responsibility for, the currency, accuracy, reliability,
completeness or fairness of this presentation nor the information, opinions and conclusions contained in this presentation.
Currency
Unless otherwise stated, all cashflows in this presentation are in Australian dollars, are undiscounted and are in real terms
(not subject to inflation/escalation factors).
Assumptions and Notes for Financial Information on 2023 DFS this presentation:
Further details on the 2023 DFS and the assumptions and notes for the 2023 DFS can be found in the Company’s ASX
Announcement ‘2023 Definitive Feasibility Study Results’ released on 24 August 2023.
Third party data from consultants and government agencies
Andromeda has relied on information provided by specialist consultants and government agencies in preparing this
presentation. Andromeda has reviewed all information to the best of its ability but does not take responsibility for its
accuracy or completeness, or reliability of such information.
Competent Person's Statements
The data in this presentation that relates to Mineral Resource estimates for The Great White Deposit and the Chairlift
Deposit is based on information evaluated by Mr Eric Whittaker who is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM). Mr Whittaker is the Chief Geologist of Andromeda Metals Limited and has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Whittaker has over 30 years of experience in the
mining industry. Mr Whittaker consents to the information in the form and context in which it appears. Mr Whittaker is
entitled to participate in Andromeda’s employee incentive plan.
The data in this presentation that relates to Mineral Reserve estimates for The Great White Deposit is based on information
evaluated by Mr John Millbank who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr
Millbank is the Director of Proactive Mining Solutions Pty Ltd, an independent mining consultancy, and has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is
undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Millbank consents to the information
contained in this presentation being used in the form and context in which it appears. Mr Millbank, or any of the entities he
directly controls, has no financial interests in Andromeda Metals Ltd or any of its subsidiaries.
Photographs, images, diagrams, charts and maps
Photographs, images, diagrams, charts and maps used in this presentation are illustrative only and may not be drawn to
scale.
Unless otherwise stated, all data contained in the charts, graphs and tables is based on information available at the date
of this presentation.
Key driver of the
2023 DFS is the
Commercial
Strategy review
Identified a product portfolio
that balances a rigorous
segmented market to mine
approach with a disciplined
and optimised mine to market
response.
3
2023 DFS delivers a 65% NPV increase to $1.01Billion
Average annual EBITDA increased by 59% to $130 million
The 2023 DFS follows a comprehensive commercial strategy review and approach to developing the
world-class, high quality halloysite-kaolin of The Great White Deposit.
Improvement in Net Present Value (NPV) compared to the 2022 DFS is driven by:
Capitalising on Core and
Complementary products
Enhanced product mix and
partner portfolio
Established high value-in-use of
Andromeda products in key
market segments
Responsive to macro- and
microenvironment trends
Strengthened global prices
driven by geopolitical risk
and global and regional
supply shortages
Focused on enhancing
value
Safe and sustainable
development
Supports an accelerated sales
profile and reduced costs across
the Life of Mine (LOM)
Adopting a low-impact approach
to processing and mining
Improved weighted average
product margin by 34% to
$450/tonne of product
Plan to improve Scope 1 and
Scope 2 emissions, to meet or
exceed global industry
benchmarks
Further details on the 2023 DFS and the assumptions and notes for the 2023 DFS can be found in the Company’s ASX Announcement ‘2023 Definitive Feasibility Study Results’ released on 24 August 2023.
The 2023 DFS financial model methodology has been verified by an independent financial consultant.
4
Established above market high value in use in the global
high quality kaolin market
Independent testing confirms Great White CRMTM as a market leading product
Value-in-use test work conducted by ITC
• Great White CRM™ and Great
White KCM™90 world class
brightness, colour and aluminium to
iron ratio was confirmed
independently by ITC and
IberoClays.10
• Globally, Andromeda estimates an
identified contestable market for
high quality ceramic tiles of
340–500 ktpa.11
Reducing impurity index
Increasing quality
Increasing alumina content
10 Testwork was carried out by IberoClays and the Instituto de Tecnologia Ceramica in 2023.
11 Work commissioned by Andromeda, “overview of the Ceramic tile market’ (Galesk Consultancy S.L.U , 2023).
5
Technical Marketing of Great White CRM™
Test results confirm superior performance in key market segments
CERAMIC TILE BODY
• Validated for use in blends where Great White
CRMTM lends superior chromatic coordinate
properties compared to the interval values of
standard kaolins in the market
CERAMIC GLAZE
ZIRCON-REPLACEMENT POTENTIAL
• Great White CRMTM (and Great White KCMTM 90)
tested in glaze applications as showing
considerably higher mechanical strength
compared to standard
• Premium slabs and porcelain tiles in super and
ultra-white use micronized zircon
• High mechanical strength can reduce glaze
defects during the manufacturing process
• Value in use work supports a 10-15% reduction
in zircon by using Great White CRMTM
6
Technical Marketing of Great White CRM™
Next Steps
• Additional Institute of Ceramic Technology (ITC) study commissioned to independently
validate zircon replacement potential. Results expected by end of December 2023
• Further leveraging ITC partner and sponsor relationships through their pioneering
university –business cooperation system:
• Final validation with industrial scale tile production, conducted in cooperation with
an ITC sponsor and Tier 1 multinational
• Facilitating and fast-tracking additional future sales through leading ceramics
businesses in Europe
7
Positioned to be the industrial mineral of choice in the
global ceramics market
Great White CRM™
properties and applications1
Top 3 Iron/Alumina ratio
(Fe2O3/Al2O3) of global kaolin
samples
High brightness is retained in
high temperatures, with very
good colour evolution, which is
valued in high quality
porcelainware and ceramic tiles
High dry mechanical strength is
highly valued in large format
porcelain tiles
Zircon-replacement potential in
super and ultra-white premium
slabs and porcelain tiles
Strongly positioned to offer exceptional value in use in:
Porcelain tableware; large format porcelain ceramic tiles and glazes;
and super and ultra-white premium porcelain tiles and slabs
8
1 As determined by testing conducted on Great White CRM™ by Instituto de Tecnología Cerámica (ITC), located at the University of Castellón in Spain, and IberoClays.
Outcomes from September meetings in Europe
Discussions centred on CERSAIE Ceramics Conference in Bologna, Italy
Discussions progressed
based on LOI received
from Iberoclays –
discussions targeting
15,000-20,000 tpa during
the first 3 years of
production.
South-East Asia –
qualifications with
multinationals that have
operations in the region
Qualifications with Italian super-white
porcelain tile manufacturers
Qualified as a supplier to Tier 1
technology supplier for manufacture
of porcelain tiles and slabs
HoA signed with
Opaque Ceramics for
discussions on sale and
distribution of Great
White CRM™ and new
zircon-kaolin product
development
9
TRAXYS – Non-binding Heads of Agreement Signed
Leading Global Industrial Minerals Trading Company
Global industrial minerals presence and reach
• Recently announced US$1.57 billion multi-bank revolving credit facility
t = tonnes
tpa = tonnes per annum
wmt p.a. = wet metric tonnes per annum
10
TRAXYS – Non-binding Heads of Agreement Signed
Comprehensive strategic relationship
HEADS OF AGREEMENT – Key terms for discussions:
• Targeting a term of 5 years, with first shipment Q1 2025
• Option for 60 or 90-days pre-shipments advances,
during the first 24 months of production
• Direct sales of Great White CRM™
• Targeting 20,000 – 30,000 wmt p.a. for the first Stage
• Potential geographies of Turkey, Middle East,
Scandinavian countries, and Latin America (LATAM)
• Direct sales of Great White HRM™
• Targeting 10,000 – 15,000 wmt p.a. for the first Stage
• Potential geographies of Europe, Middle East and
Africa (EMEA), India and the Persian Gulf region
• End-user validation and homologation and certification
for each market to be completed
t = tonnes
tpa = tonnes per annum
wmt p.a. = wet metric tonnes per annum
Potential equity and debt arrangements:
• Participation in pre-FID funding raises
• Contribution towards funding requirements following
FID, including potentially as a cornerstone equity
investment or via the provision of working capital
facilities
Andromeda CEO has extensive past experience with Traxys
Leadership team, across a portfolio of metals and minerals:
•
•
•
•
Zircon
Concentrates
Aluminum
Titanium Oxide (Ti02)
11
Global Markets - India
Favourable freight rates and free trade1 agreement make India an attractive market
Key Target
Markets
• Second largest ceramics market in the world2
• Ceramic tile production in 2024 forecast to be 3.3
billion square metres, with CAGR of 9-10%
• India’s growth is supported by it being the world’s
most populous country, having recently surpassed
China
• Average economic growth rate of 5.5% p.a. over the
past decade
• India has overtaken the United Kingdom to become
the world's fifth largest economy
1 Australia-India Economic Cooperation and Trade Agreement (ECTA): https://www.dfat.gov.au/trade/agreements/in-force/australia-india-ecta
2 India, Ceramics Tile Market, MECS, Edition Year 2022-23
12
India – Heads of Agreement signed with Opaque Ceramics
Discussions on distribution of Great White CRMTM and new product development
Sale and Distribution of Great White CRM™
• 5,000-10,000 wmt p.a. of Great White CRM™
New Product Development
• New product development, utilising an additional
5,000-10,000 wmt p.a. of Great White kaolin
• For direct sales and distribution into the ceramic
tile, ceramic glaze, porcelain tableware and
sanitaryware markets in India
• Focus on expanding or enhancing Opaque’s
existing range of Opaque zircon-based products
• Potential to target other markets, including
Bangladesh, Sri Lanka, Middle East, Saudi Arabia
and Oman
• Leveraging unique qualities of Great White kaolin,
including high-brightness and its zircon
replacement potential.
Opaque’s existing range of zircon-based products used to opacify (whiten) ceramics:
13
Great White HRM™ commercialisation
Strategic Alliance Agreement signed with Hallett Group
STRATEGIC ALLIANCE – Intent to commercialise Great White HRM™
•
Develop the market in Australia for Great White HRM™
•
Commercialise use of Great White HRM™ in various applications, including
reduced cement concrete, reduced fines concrete, improved
performance shotcrete, backfill and other building products
Hallett Group’s Green Cement Transformation Project – with location of The Great White Project
HALLET GROUP
•
Established in 1978, it has grown to become the largest integrated supplier
of building and construction materials in South Australia
•
A supplementary cementitious materials (SCM) company with a range of
products focused on lowering the carbon footprint of concrete
•
Potential to assist Hallett Group in:
•
Expanding market share in the markets for low carbon concrete,
shotcrete and fines reduction concrete
•
Replacing some of the 300,000 tonnes of cement Hallett Group
currently imports each year
•
Hallett Group’s $125 million Green Cement Transformation Project
centred in Port Augusta
•
Formulations for the concrete supply industry, such as for the
upcoming $15 billion River Torrens to Darlington Project (T2D) major
roadworks project undertaken by the South Australian Government
14
Commercial Position
Good progress towards a high-quality, sustainable, growing revenue line
CUSTOMER
Market / Region
Year 1
Year 2
Year 3
Plantan Yamada
Japan
5
10
10
Foshan Gaoming
China
15
15
30
Australia/NZ
5
5
5
Mediterranean
India
Various
15
7
20
20
15
30
20
15
30
67
95
110
IMCD
Iberoclays
Opaque Ceramics
Traxys
Hallett Group
Australia
TOTAL VOLUME TO BE CONTRACTED (tonnes)
t = tonnes
tpa = tonnes per annum
wmt p.a. = wet metric tonnes per annum
Binding Offtake
Agreement
Term Sheet
Agreement
Advanced
Opportunity
New
Opportunity
15
Update on other projects
Divestment of non-core assets and tenements
Drummond Epithermal Gold Project
• Sale to Trigg Minerals Limited – COMPLETED
• 29.5 million shares (valued at $295,000) allotted, as consideration
and reimbursement of expenses and
• Upfront payment of $27,000 in cash and a cash refund of $7,500
in respect of the environmental bonds, received
Wudinna Gold Project
• Agreement executed for sale of remaining 25% interest in
relevant tenements to Cobra Resources Limited
Camel Lake Project
• Remote location and access issues has led to a decision being made to
allow the exploration rights of tenement to expire
Chairlift Kaolin Deposit Mineral Resource Estimate1
• Inaugural combined Inferred Resource of 53.5 million tonnes (Mt):
• 27.0 Mt of Bright White, low titanium kaolinised granite (Chairlift CRM)
• 26.5 Mt of rheology modifier kaolin (Chairlift HRM)
• Consideration of $500,000 in cash and $1,000,000 in shares of
Cobra
Carbon Capture & Conversion Project
• Andromeda retains ownership of Project intellectual property (IP)
and business opportunity
• Strategic Review, conducted as part of revised Commercial
Strategy, determined it as an Adjacent opportunity
• Carbon Capture Pilot Plant – a decision has been made to
recycle the contained steel
• Progressing discussions with potential suitable industry partners to
determine most appropriate path forward
1. Refer to ASX Announcement 16 November 2023 'Chairlift Kaolin Deposit Mineral Resource Estimate'
16
Next Steps – H1 2024
Traxys
Progress discussions towards binding agreements for offtake commitments and
financing arrangements, including potential cornerstone equity investment
.
Environmental
Bond
Lodgement of Environmental Bond and payment into Native Vegetation Fund are to
be paid in order to access resource in support of producing samples for marketing
purposes
Opaque
Ceramics
Progress discussions towards binding offtake agreement for Great White CRM™ and
development and customer testing of new zircon-kaolin product
Hallett Group
HRM commercialisation aligned with market opportunities in South Australia and
Hallett Group portfolio of projects – concrete, shotcrete, low-fines cement
Stage 1A+
Cost/benefit analysis of potential expansion from 50ktpa to 100ktpa (Stage 1A+),
based on market demand, including the inclusion of India market, potentially
supporting a higher level of debt
Financing
Working towards binding offtakes agreements to lock in revenue that optimises the
debt and equity funding mix
17
Why “now”?
Forces making “now” the right time for developing The Great White Project
Unique, high quality,
large resources
•
•
Defined, very high value in use
Clear view on target segments
TGWP set for development
• Construction ready
• Required permits in place
• Progressing funding discussions
Global depletion of highquality kaolin deposits
• Porcelain tableware market
Geopolitical forces impacting
access to existing supply
• Requiring new formulations for
ceramic tiles with high value minerals
18
Andromeda
The Great White
Mineral Company
For more information about the Company, please
visit our website, www.andromet.com.au or contact:
Patrick Sinclair
Manager, Investor Relations & Corporate Affairs
T: 08 7089 9819
M: 0403 708 431
E: Patrick.Sinclair@andromet.com.au
Share your feedback
Discover