Ceramic Tile Conference Presentation
Released
Released
Announcement PDF
22 February 2024
Andromeda Metals Limited ASX: ADN
ASX Announcement
10/431 King William Street
Adelaide, SA 5000
Tel:+61 8 7089 9800
admin@andromet.com.au
ABN
75 061 503 375
ICerS Raw Materials for Ceramic Tile Conference Presentation
Andromeda Metals Limited (ASX: ADN) (Andromeda, the Company) is pleased to advise that CEO and
Managing Director, Bob Katsiouleris has been invited to present at the ICerS Raw Materials for Ceramic Tile
Conference in Sassuolo, near Bologna, Italy.
The conference will take place later today (Italian time) and is focused on the ceramics supply chain,
critical raw materials, global mineral resources, and technological aspects in the formulation of mixtures.
Conference attendees include a broad cross-section involved in the manufacture of ceramic tiles,
including those involved in technical, operations and procurement.
The presentation, which is attached to this announcement, includes the following information not
previously published, on tests conducted by the Institute of Ceramic Technology:
•
Additional results from tests previously conducted on Great White CRM™ and Great White
KCM™90,1,2 , and
•
Preliminary value in use results extending the zircon-replacement potential of Great White CRM™
to between 10-18% reduction in zircon1.
Additionally, included are initial characterisation results produced by SACMI, a Tier 1 technology supplier
for the manufacture of porcelain tiles and slabs.
Bob Katsiouleris, Andromeda’s CEO and Managing Director, said: “I am pleased to have been asked to
present at this important conference for the ceramics industry. It represents a unique opportunity to
showcase the extraordinary results from tests on kaolin from The Great White Project to many key global
buyers and users of kaolin for ceramics.
“The opportunity to present at the conference highlights the heightened interest by the industry to the
emerging potential offered by our high-quality kaolin products. This comes at a time of increasing scarcity
in global kaolin markets, driven by ongoing geopolitical supply disruptions and the depletion of traditional
high-quality sources of supply.”
This announcement has been approved for release by the Board of Directors of Andromeda Metals Limited.
For more information about the Company and its projects, please visit our website,
www.andromet.com.au or contact:
Manager, Investor Relations & Corporate Affairs
Patrick Sinclair
T: 08 7089 9819
M: 0403 708 431
E: Patrick.Sinclair@andromet.com.au
1
2
Refer to ADN ASX dated 16 November 2023 titled Investor Update – presentation.
Refer to ADN ASX dated 28 August 2023 titled 2023 DFS investor presentation and webcast.
Andromeda
The Great White
Mineral Company
A new high-quality kaolin source
for ceramics
ICerS Congress – Raw Materials Day
22 February 2024
ASX:ADN
andromet.com.au
Level 10, 431 King William Street, Adelaide, South Australia 5000
+61 8 7089 9800
Authorised for release by the CEO and Managing Director of
Andromeda Metals Ltd
Disclaimer and Qualifications
No warranty
No investment or financial product advice
The information contained in this presentation does not constitute investment advice or financial product
advice (nor taxation or legal advice) and is not intended to be used as the basis for making an investment
decision or as a recommendation to acquire securities in Andromeda.
While care has been taken in preparing the information in this presentation, no representation or warranty, express or
implied, is made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and
conclusions contained in this presentation. The information in this presentation has been obtained from or based on
sources believed by Andromeda to be reliable. This includes references to test results and reports completed by external
parties.
The information contained in this presentation should not be relied upon as a recommendation or forecast
by Andromeda (including as to the performance of Andromeda or its share price). Readers should obtain
their own professional advice and carry out their own independent investigations and assessment of the
information in this presentation (including any assumptions) before acting.
An investment in Andromeda is subject to investment and other known and unknown risks, some of which
are beyond the control of Andromeda including loss of income and principal invested.
This presentation has been prepared without taking into account any particular person’s objectives, financial
situation or needs; does not purport to identify the nature of specific market or other risks associated with any
investment in the Company and does not constitute any legal, taxation, investment or accounting advice.
An investment in Andromeda's securities is subject to investment and other known and unknown risks, some
of which are beyond the control of Andromeda including loss of income and principal invested. Any
investment decision should be based only on a person's own due diligence, inquiry, assessment and
professional advice.
Forward-looking statements
This presentation contains or may contain certain forward-looking statements and comments about future
events, that are based on Andromeda's beliefs, assumptions and expectations and on information currently
available to management as at the date of this presentation. Often, but not always, forward-looking
statements can generally be identified by the use of forward-looking words such as "may", "will", "expect",
"plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated
production and production potential, financial forecasts, product quality estimates of future Mineral
Resources and Ore Reserves.
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which
could cause actual values, results or performance achievements to differ materially from those expressed or
implied in this presentation.
Where Andromeda expresses or implies an expectation or belief as to future events or results, such
expectation or belief is expressed in good faith and on a reasonable basis. No representation or warranty,
express or implied, is made by Andromeda that the matters stated in this presentation will in fact be
achieved or prove to be correct. Except as required by law, Andromeda undertakes no obligation to
provide any additional or updated information or update any forward-looking statements whether on a
result of new information, future events, results or otherwise.
Readers are cautioned against placing undue reliance on forward-looking statements. These forwardlooking statements are not guarantees of future performance and involve known and unknown risks,
uncertainties, assumptions and other important factors, many of which are beyond the control of
Andromeda, the directors, and management of Andromeda. These factors include, but are not limited to
difficulties in forecasting expected production quantities, the potential that any of Andromeda’s projects
may experience technical, geological, metallurgical and mechanical problems, changes in market prices
and other risks not anticipated by Andromeda, changes in exchange rate assumptions, changes in product
pricing assumptions, major changes in mine plans and/or resources, changes in equipment life or capability,
emergence of previously underestimated technical challenges, increased costs, and demand for
production inputs.
Information in this presentation which is attributed to, or derived from, a third-party source has not been independently
checked or verified by Andromeda. No representation or warranty is made as to the accuracy, completeness or reliability
of such information.
To the maximum extent permitted by law, neither Andromeda nor its related corporations, Directors, officers, employees,
advisers or agents, nor any other person, accepts any liability, including, without limitation, any liability arising from the use
of this presentation or its contents or otherwise arising in connection with them, nor guarantees or makes
any representations or warranties, express or implied, as to or takes responsibility for, the currency, accuracy, reliability,
completeness or fairness of this presentation nor the information, opinions and conclusions contained in this presentation.
Currency
Unless otherwise stated, all cashflows in this presentation are in Australian dollars, are undiscounted and are in real terms
(not subject to inflation/escalation factors).
Assumptions and Notes for Financial Information on 2023 DFS this presentation:
Further details on the 2023 DFS and the assumptions and notes for the 2023 DFS can be found in the Company’s ASX
Announcement ‘2023 Definitive Feasibility Study Results’ released on 24 August 2023, with no material changes to the
assumptions underpinning the financial information.
Third party data from consultants and government agencies
Andromeda has relied on information provided by specialist consultants and government agencies in preparing this
presentation. Andromeda has reviewed all information to the best of its ability but does not take responsibility for its
accuracy or completeness, or reliability of such information.
Competent Person's Statements
The data in this presentation that relates to Mineral Resource estimates for The Great White Deposit and the Chairlift
Deposit is based on information evaluated by Mr Eric Whittaker who is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM). Mr Whittaker is the Chief Geologist of Andromeda Metals Limited and has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Whittaker has over 30 years of experience in the
mining industry. Mr Whittaker consents to the information in the form and context in which it appears. Mr Whittaker is
entitled to participate in Andromeda’s employee incentive plan.
The data in this presentation that relates to Mineral Reserve estimates for The Great White Deposit is based on information
evaluated by Mr John Millbank who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr
Millbank is the Director of Proactive Mining Solutions Pty Ltd, an independent mining consultancy, and has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is
undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Millbank consents to the information
contained in this presentation being used in the form and context in which it appears. Mr Millbank, or any of the entities he
directly controls, has no financial interests in Andromeda Metals Ltd or any of its subsidiaries.
Photographs, images, diagrams, charts and maps
Photographs, images, diagrams, charts and maps used in this presentation are illustrative only and may not be drawn to
scale.
Unless otherwise stated, all data contained in the charts, graphs and tables is based on information available at the date
of this presentation.
Great White Deposit
A new, large development-ready source of high-quality kaolin
The Great White Deposit’s 15.1 Mt JORC reserve1 delineated by
core and complementary products aligned to market demand
GREAT WHITE DEPOSIT KAOLIN ORE RESERVE
• 15.1Mt of JORC Reserves1
Reserve Category
Mt
Yield
Halloysite
Proved
Probable
5.2
10
45
46
15.1 2
46
Total
Fe2O3
14
10
Brightness
(%)
84
83
11
84
0.5
0.5
0.5
(Concrete)
(Tableware)
(Tiles)
2023 DFS starter pit
1 Refer ADN ASX dated 6 April 2022 titled Great White Kaolin Project - Definitive Feasibility Study, with no material changes to the underlying assumptions.
2 Table subject to rounding errors.
3
Andromeda Kaolin Products
Developed for premium ceramic market segments
Concentrate Product
Great White KCM 90
A semi-refined
high-quality kaolin
for direct use,
further refinement
or upgrade of
resources
• Highly consistent premium grade
• Halloysite optimised
• Suitable as feed for HPA
Ceramic Product
Great White CRM T
A fully refined
product for the
high-end
ceramic tile and
porcelain slab
market
• World class grade – high alumina and
low iron, very high Al/Fe ratio
• High whiteness and translucency
• Good green and fired strength
Ceramic Product
Great White CRM P
A fully refined
product for the
high-end
porcelain
tableware
market
• World class grade – low TiO2
• High whiteness and translucency
• Good green and fired strength
4
Independent Technical Validation
International benchmarking by Spain’s Institute of Ceramic Technology (ITC)
• Work commissioned at ITC1 has confirmed Great White
CRM is a world-class product grade – benchmarked
against a suite of globally traded kaolins.
Chemical composition (wt%) of Andromeda’s products,
compared to the industry standard interval for kaolins
Reducing impurity index
Increasing quality
Increasing alumina content
1 Feasibility of use of kaolin samples in ceramic products, Institute of Ceramic Technology , November 2023.
5
Independent Technical Validation
Excellent firing performance of Andromeda’s products
Pressing and firing behaviour of Andromeda’s products,
compared to the industry standard interval for kaolins1
6
1 Feasibility of use of kaolin samples in ceramic products, Institute of Ceramic Technology , November 2023.
Independent Technical Validation
Strong performance when included in glaze formulations
• Results of testing of Andromeda’s products1, compared to
the industry standard kaolin reference values
Cohesion and adherence of glaze layer showing significantly
higher mechanical strength compared to industry reference
kaolin
Viscosity values
Chromatic coordinates and gloss of glazed pieces fired at 1100ºC
7
1 Feasibility of use of kaolin samples in ceramic products, Institute of Ceramic Technology , November 2023.
Independent Technical Validation
International benchmarking by Spain’s Institute of Ceramic Technology (ITC)1
“The three samples have common characteristics for their use in glazes. This is from their low
proportion of chromophorous oxides, adequate suspending capacity and for the performance
of the glazes prepared with these kaolins, including high adhesion and cohesion before firing
and high gloss after firing. Specifically, the thigh adhesion and cohesion may imply an
increase in percentage of first quality tiles due to the decrease in the effects associated with
the lack of mechanical strength of the glaze layer before firing.
“The samples are adequate for porcelain tableware bodies because of their low proportion of
chromophorous oxides and high alumina content and therefore high whiteness.
“In porcelain tile bodies, the performance of the samples support their application in bodies
with high whiteness (unglazed porcelain tiles and slabs), due to their low proportion of
chromophorous oxides and high alumina content and therefore high whiteness. Their use
could support a reduction in the percentage of required opacifiers (aspect to be confirmed).”
Institute of Ceramic Technology
8
1 Feasibility of use of kaolin samples in ceramic products, Institute of Ceramic Technology , November 2023.
Great White CRM
use in super and ultra white slabs
High-brightness supports reductions in use of high-priced zircon as opacifier
ZIRCON-REPLACEMENT POTENTIAL
• Premium slabs and porcelain tiles in
super and ultra-white use micronized
zircon for whitening
• Testwork1 supports a 10-18% reduction
in zircon by using Great White CRMTM
Whiteness (
)
• Zircon priced at over US$2,000/t
9
1 As determined by preliminary results from tests conducted on Great White CRM
by the Institute of Ceramic Technology (ITC), Spain, February 2024 in addition to earlier results.
Great White CRM
use in super and ultra white slabs
Initial characterisation at SACMI - Italy
Feedback from SACMI R&D Centre - Imola
“It is a material of excellent quality and great purity,
suitable for the production of first category products such
as slabs, kitchen countertops, in particular hyperwhite
products with a very high L* degree, and also for glazes
and engobes compositions. “
10
Positioned to be the industrial mineral of choice in the
global ceramics market
Great White CRM
properties and applications1
Top 3 Iron/Alumina ratio
(Fe2O3/Al2O3) of global kaolin
samples
High whiteness is retained in
high temperatures, with very
good colour evolution, which is
valued in high quality
porcelainware and ceramic tiles
High dry mechanical strength is
highly valued in large format
porcelain tiles
Zircon-replacement potential in
super and ultra-white premium
slabs and porcelain tiles
Strongly positioned to offer exceptional value in use in:
Porcelain tableware; large format porcelain ceramic tiles and glazes;
and super and ultra-white premium porcelain tiles and slabs
11
1 As determined by testing conducted on Great White CRM
by Instituto de Tecnología Cerámica (ITC), located at the University of Castellón in Spain, and IberoClays.
IberoClays Agreement Provides Market Validation
High Quality & Price Point Validated for use in Ceramics
Market Validation
IberoClays
• IberoClays is a leading European formulator and distributor of raw materials for ceramics, trading over 800Ktpa.
• On the basis of the ITC work and their own benchmarking, they have entered into a 5-year binding offtake agreement for up to
20Ktpa (at Andromeda’s option) of Great White CRM . 1
• Exclusive Distributor in Italy, Spain and Portugal with logistics infrastructure.
“The emergence of The Great White Project as a new source of supply comes at a crucial
time in global kaolin markets. Ongoing geopolitical supply disruptions, in addition to the
depletion of traditional high-quality sources of supply, is seeing elevated pricing for highquality kaolin that can be used in ceramics.
The Great White Project’s products not only complete our portfolio of advanced
formulations for high-quality porcelain tiles, slabs and ceramic glazes, but opens up the
potential for a new market for kaolin as a high-performance additive to decarbonise
concrete”
Alberto Piquer González, owner and CEO of IberoClays
12
1 Refer ADN ASX dated 19 January 2024 titled Binding Sales and Distribution Agreement Signed with IberoClays.
TGWP is development-ready
Stage
Stage 1A
Stage 1B
Stage 2
Stage 3
First Shipment
Q1 2025
Dec 2025
Dec 2027
Dec 2029
• Demand growth for kaolin is linked to GDP and urbanisation
Kaolin Production
50,000 tpa
150,000 tpa
250,000 tpa
300,000 tpa
• Increasing use of high-quality kaolin in new applications
Nominal Capacity
100,000 tpa
300,000 tpa
500,000 tpa
600,000 tpa
Capital Cost
$62.4 million
$57.6 million
$57.2 million
$10.9 million
Favourable market environment
• Emerging supply deficit with global depletion of high-quality deposits
• No new >36% alumina deposits being developed, globally
Transport and logistics routes
Project without peer
• Tier 1 mining jurisdiction of South Australia
• The Great White Deposit with 15.1Mt of JORC Reserves1
• Growing regional footprint of large high-quality deposits
• Defined, very high value in use in key target segments
• Simple and low-risk mining and processing flowsheet
Development-ready with all permits in place
• Mining Lease, PEPR and EPA Works approval obtained
• Land acquisition agreement in place, with subdivision underway
• All Stage 1A long lead items on order and being fabricated
Experienced team in place
• Highly experienced and Board and Management
• Industrial minerals and kaolin expertise
1 Refer ADN ASX dated 6 April 2022 titled Great White Kaolin Project - Definitive Feasibility Study, with no material changes to the underlying assumptions.
13
Chairlift – Mineral Resource Estimate
Expanding high-quality opportunities through regional exploration
CHAIRLIFT1
• Combined Inferred Resource of 53.5 million tonnes (Mt):
• 27.0 Mt of Bright White, low titanium kaolinised granite (Chairlift CRM)
• 26.5 Mt of rheology modifier kaolin (Chairlift HRM)
• Low titanium content of Chairlift CRM, with average TiO2 of 0.18%
• Chemistry could be ideal for advanced performance coatings and
medical applications, supporting entry into new high value segments
• Chairlift HRM has the same rheological properties as Great White HRM
expanding the market opportunity for the HRM product range
,
• Exploration upside potential, with mineralisation open in multiple directions
1 Refer ADN ASX dated 16 November 2023, Chairlift Kaolin Deposit Mineral Resource Estimate, with no material changes to the underlying assumptions.
Chairlift is located on exploration license EL 6664 and is part of the Eyre Kaolin Project. Andromeda is currently sole funding expenditure on the Eyre Kaolin Project to earn up to an 80% interest from Peninsula Exploration Pty Ltd. Refer ADN ASX announcement dated 12
August 2021 titled Andromeda enters New Kaolin Joint Venture on the Eyre Peninsula, SA.
14
Andromeda
The Great White
Mineral Company
For more information about the Company, please
visit our website, www.andromet.com.au or contact:
Patrick Sinclair
Manager, Investor Relations & Corporate Affairs
T: 08 7089 9819
M: 0403 708 431
E: Patrick.Sinclair@andromet.com.au
Share your feedback
Discover