Half Yearly Report and Accounts
Released
Released
Announcement PDF
FINANCIAL REPORT
For the Half-Year Ended
31 December 2023
Andromeda Metals Limited
Page 2
CONTENTS
Page
Directors’ Report
Auditor’s Independence Declaration
Condensed Consolidated Statement of Profit or Loss and other
Comprehensive Income
Condensed Consolidated Statement of Financial Position
Condensed Consolidated Statement of Changes in Equity
Condensed Consolidated Statement of Cash Flows
Notes to the Financial Statements
Directors’ Declaration
Independent Auditor’s Review Report
3
14
15
16
17
18
19
24
25
Andromeda Metals Limited
Page 3
Directors’ Report
The names of the directors of Andromeda Metals Limited (Andromeda, the Company) during the halfyear period and as at the date of this report, are:
Michael Wilkes
Non-Executive Chair
Remuneration Committee Chair
BEng (Hons), MBA, MAusIMM, MAICD
Robert Katsiouleris
Managing Director
BEng, MBA
Austen Perrin
Non-Executive Director
Audit and Risk Committee Chair
B. Econ. (Acc.), CA, GAICD
Sue Ann Higgins (Appointed 21/02/24)
Non-Executive Director,
Sustainability & Governance Committee Chair
LLB (Hons), BA, ACIS, GAICD
Grad Dip Company Secretarial Practice
Grad Dip Applied Finance and Investment
Melissa K Holzberger (Resigned 02/02/24)
Non-Executive Director,
Sustainability & Governance Committee Chair
LLM Resources Law (Distinction),
Dip. International Nuclear Law (Hons),
LLB, BA, Grad Dip Legal Practice, GAICD,
FGIA
James E Marsh (Resigned 10/10/23)
Executive Director
BSc (Hons), MAusIMM
Operating and Financial Review
Strategy
To achieve the goal of delivering long-term shareholder returns, the directors of Andromeda Metals
have formulated a strategy for the Company, comprising the following key elements:
Kaolin
•
The Company will maintain its focus on advancing The Great White Project (TGWP) through
seeking to:
o
obtain all product certification and regulatory approvals required;
o
plan for a staged approach to development that closely matches the growth profile of
volume commitments signed under binding offtake agreements;
o
implement appropriate operational structures and procedures, supported by suitable
resources; and
o
secure the necessary funding, supported by a Bankable Feasibility Study and an
updated Definitive Feasibility Study;
in support of progressing towards a Final Investment Decision (FID) being made, for eventual
development and production.
•
Regional exploration for kaolin with complementary attributes to the high-quality kaolin found at
TGWP, with the intent of identifying opportunities to expand production and/or extend the range
of products the Company can offer.
Andromeda Metals Limited
•
Investigating opportunities to expand the use of kaolin from TGWP in new products and
applications, such as:
o
kaolin and zircon-kaolin blended products that can displace zircon through incorporating
the unique zircon-replacement potential of TGWP kaolin;
o
use as a filler or additive in paints, coatings, fiberglass, technical ceramics and
pharmaceuticals;
o
halloysite-based products and their use in emerging nanotechnologies; and,
o
•
Page 4
feedstock for use in the production of the critical mineral High Purity Alumina (HPA).
These activities are underpinned by:
o
o
TGWP’s deposits being among the world’s largest high-quality kaolin resources, and
continued strong market dynamics for quality kaolin products, driven by increasing
global demand, particularly in the Asia-Pacific region, along with increasing global
scarcity driven by rapid resource depletion and long-term market dislocation caused by
ongoing geo-political factors.
Metals
•
The Company seeks to maximise shareholder value through an ongoing divestment program
of its legacy gold and copper assets, to support the continued focus on advancing TGWP.
Corporate Governance and Sustainability
•
As Andromeda matures as a company, the aim is to move towards construction and production,
in a safe, ethical and sustainable way.
•
The Company recognises the critical importance of sustainable practices in operations and is
committed to minimising the impact of operations, reducing greenhouse gas emissions,
supporting local communities, and ensuring ethical business conduct.
•
Andromeda is committed to continuous improvement and, as the Company progresses the
development of TGWP, an ongoing focus will be on enhancing its governance and operational
structures and systems.
•
The Company acknowledges the importance of committing to and establishing an integrated
approach to sustainability and consistent reporting on Environmental, Social and Governance
(ESG) frameworks and factors. As the Company moves into production, its aspiration is to
adopt, monitor and report on relevant frameworks and metrics that emerge from the developing
consensus and convergence of ESG standards.
Andromeda Metals Limited
Page 5
Financial Results
Income for the six months ending 31 December 2023 was $720,868, representing a 35% decrease
from the $1,101,586 during the prior corresponding period (pcp). The decrease was driven by a
reduction in accrued research and development incentives for activities conducted by the Company
and reduced interest income on bank deposits.
The net result of operations for the six months ending 31 December 2023 was a loss after income tax
of $4,213,684 (31 December 2022 loss of $4,117,507).
Exploration and evaluation expenditure for the six months was $2,635,720 (2022: $4,087,775), the
majority of which was directed towards the advancement of The Great White Project. In accordance
with the Group’s accounting policy, $2,630,342 (2022: $4,023,590) was capitalised and a total of
$5,378 (2022: $64,185) was recognised in the profit and loss as a result of amounts expensed.
Operating expenditure, excluding exploration and evaluation impairment and expenses for the six
months totalled $4,075,382 (2022: $5,154,908) which is inclusive of the valuation of options and
performance rights issued to directors.
At 31 December 2023, the Company held cash and cash equivalents totalling $8,378,141 (2022:
$23,912,233).
Review of Operations
During the period 1 July to 31 December 2023, the primary focus for Andromeda has been to continue
the advancement of The Great White Project (TGWP).
Updated Definitive Feasibility Study (2023 DFS)
Following the appointment in April 2023 of Bob Katsiouleris as Chief Executive Officer and Managing
Director, a comprehensive strategy review of the commercial strategy and the approach to developing
TGWP, was undertaken.
The revised Commercial Strategy resulted in re-focusing of the Company’s effort on an enhanced
product portfolio targeting high value markets, as follows:
•
Core Products: Great White CRM™ and Great White KCM™90 and identified a value in use
that is above market in established and growing segments for high quality ceramic tiles and
porcelain tableware.
•
Complementary Products: Great White HRM™ and industrial sand co-products. In addition
to the current established use of Great White HRM™ as a rheology modifier, the global market
for low-carbon concrete production was identified as a further opportunity to be commercialised.
The sale of industrial sand co-products, which were not commercialised in the previous 2022
DFS, were included to meet identified regional shortfalls in the construction and infrastructure
markets.
In August 2023, the Company completed the 2023 DFS, which found the revised Commercial Strategy
delivered a 65% improvement in pre-tax net present value (NPV) over the 28-year life of mine, to $1.01
billion, compared to the earlier 2022 DFS1.
1
Refer ADN ASX dated 24 August 2023 titled The 2023 DFS delivers significantly improved economics, following a
comprehensive strategy review establishing an enhanced product portfolio in high value markets, with underlying
assumptions continuing to apply, and no material changes.
Andromeda Metals Limited
Page 6
The 2023 DFS identified that global kaolin prices had strengthened, due to increased geopolitical risk,
and global and regional supply shortages, while an updated mine development plan supported an
accelerated sales profile and reduced costs. These led to a 34% increase in the weighted average
product margin, to $450/tonne of product, and a 59% increase in average earnings before interest tax
depreciation and amortisation (EBITDA) when compared to the 2022 DFS, to $130 million p.a.
Commercial
Andromeda currently has signed three binding offtake agreements and two non-binding Heads of
Agreements that underpin TGWP’s development. The growth profile of these agreements and ongoing
negotiations with several other potential customers provide confidence that further offtake agreements
will be signed, with sales volumes quickly growing in line with the planned production.
During the period the following agreements were signed:
•
•
2
3
Binding Offtake Agreement signed with Foshan Gaoming Xing-Yuan Machinery Co. Ltd
(Foshan Gaoming BOA) 2, for the supply and delivery of high-quality kaolin from TGWP, during
the first 5 years of production, into the Chinese market, as follows:
o
115,000 tonnes of Great White CRM™ over the five-year period,
o
5,000 tonnes of Great White KCM™90 in the first year of production,
o
Pricing that aligns to the pricing assumptions used in the 2023 DFS and Andromeda
may require payment obligations to be secured by a letter of credit.
o
Standard conditions precedent in Andromeda’s favour relating to due diligence
investigations on Foshan Gaoming, a financial investment decision by the Company for
the TGWP and commercial production of Great White CRM™ and Great White
KCM™90.
Non-binding Heads of Agreement signed with Traxys Europe S.A (Traxys HoA) 3, to pursue
mutually beneficial business opportunities linked to the sale and purchase of Andromeda’s
kaolin products for distribution into global ceramics and other markets, into selected
geographies, through;
o
Direct sales of Great White CRM™ – targeting 20,000 – 30,000 wmt p.a. for the first
Stage, and seeking to proportionally increase over subsequent Stages, covering the
potential geographies of Turkey, Middle East, Scandinavia, and Latin America (LATAM).
Targeting a term of 5 years, with first shipment during the first quarter of calendar year
2025 (Q1 2025), with the option for 60 or 90-days pre-shipments advances, for a portion
of agreed target volumes during the first 24 months of production;
o
Direct sales Great White HRM™ – targeting 10,000 – 15,000 wmt p.a. for the first Stage,
and seeking to proportionally increase over subsequent Stages, covering the potential
geographies of Europe, Middle East and Africa (EMEA), India and the Arabian Gulf
region, with end-user validation and homologation and certification for each market to
be completed. Targeting a term of 5 years, with first shipment during Q1 2025 and an
option for 60 or 90-days pre-shipment advances, for a portion of agreed target volumes
during the first 24 months of production; and,
o
Potential equity and debt arrangements – through participation in funding raises to
support the Company in the period until an anticipated FID is made, and a contribution
towards funding requirements following an anticipated FID being made, including,
potentially, as a cornerstone equity investment or via the provision of working capital
facilities.
Refer ADN ASX dated 18 October 2023 titled Binding Offtake Agreement signed for Chinese market.
Refer ADN ASX dated 21 November 2023 titled Non-binding Heads of Agreement signed with Traxys.
Andromeda Metals Limited
•
Page 7
Non-binding Heads of Agreement to pursue business opportunities linked to the Indian industrial
minerals market with Opaque Ceramics Pvt Ltd (Opaque HoA) 4, under which Andromeda will
work with Opaque to pursue business opportunities, including distribution of Andromeda’s
kaolin products across Opaque’s extensive global network of ceramics manufacturers, and
development and potential distribution of kaolin-zircon mixtures. Key terms for discussion
include offtake agreements for a term of 5 years, with first shipments planned during Q1 2025,
for the following:
o
Purchase of 5,000 – 10,000 wmt p.a. of Great White CRM™ by Opaque for direct sales
and distribution into the ceramic tile, ceramic glaze, porcelain tableware and
sanitaryware markets in India and potentially other markets, including Bangladesh, Sri
Lanka, Middle East, Saudi Arabia and Oman; and,
o
Development of a new kaolin-zircon product, utilising an additional 5,000 – 10,000 wmt
p.a. of Great White kaolin product, to enhance or expand the existing range of Opaque’s
zircon-based products, through incorporating the unique qualities of Great White kaolin,
including high brightness and its zircon-replacement potential.
These agreements are supplemented by:
•
The previously signed Binding Offtake Agreement with Plantan Yamada Co Ltd for 25,000
tonnes of Great White KCM™90 over the first three years of production into the Japanese
ceramics market 5, and
•
Subsequent to the period, a Binding Sales and Distribution Agreement signed with IberoClays
SLU (IberoClays BOA) 6, under which the parties have agreed to terms for the sale and
purchase of the following:
o
Great White CRM™ volumes of 8,000 wet metric tonnes (wmt) in the first year, with
IberoClays having an option to increase this to 10,000 wmt, increasing to 10,000 20,000 wmt per annum from the second year onwards (at Andromeda’s option). For
sale into the ceramics and tile sectors with exclusive marketing and distribution in Spain,
Portugal and Italy and non-exclusive rights in France, Morocco, Egypt and Turkey.
Pricing from Year 2 onwards in line with assumptions made in the 2023 Definitive
Feasibility Study (2023 DFS), with a discount of 7-8% applied to deliveries made in the
first year, during which pre-payment terms will apply for shipments up to 30 September
2025, as per below.
o
Great White HRM™ volumes of 2,000 wmt per annum, for sale into the concrete industry
with non-exclusive marketing and distribution rights in Spain and Portugal for concrete
applications. Conditions precedent in IberoClays’ favour relating to the certification for
sales into Spain and Portugal, and the securing of an end-user agreement; and, Pricing
that is significantly above the conservative product pricing assumptions made in the
2023 DFS.
o
Prepayment terms for shipments until 30 September 2025, payable at the beginning of
each quarter for all shipments due to be shipped during that quarter (based on 70% of
provisional invoice).
o
An initial term of 5 years from delivery of the first shipment, with automatic yearly
extensions thereafter (unless either party gives 12 months’ notice of termination), for
delivery to, and warehousing at, the Port of Castellón, Spain.
4
Refer ADN ASX dated 9 November 2023 titled Heads of Agreement signed for Indian and global markets.
5
Refer ADN ASX dated 8 June 2023 titled Binding Offtake Agreement signed for Japanese market.
6
Refer ADN ASX dated 19 January 2024 titled Binding Sales and Distribution Agreement Signed with IberoClays.
Andromeda Metals Limited
Page 8
Additionally, the Company signed a Strategic Alliance Agreement for the commercialisation of Great
White HRM™ with Hallett Group (Hallett Agreement) 7. Hallett Group is the largest integrated supplier
of building and construction materials in South Australia, with a range of products focused on lowering
the carbon footprint of concrete. Under the Agreement, Andromeda and Hallett Group will work
together, in a strategic alliance to develop the market in Australia for Great White HRM™ and
commercialise its use in various applications, including reduced cement concrete, reduced fines
concrete, improved performance shotcrete, backfill and other building products.
Technical
During the period, the product validation program on Great White CRM™ conducted independently by
the Institute of Ceramic Technology (ITC), located at the University of Castellón in Spain, was
progressed. Interim test results on the suitability of Great White CRM™ for ceramic glazes, zircon
replacement potential and international benchmarking comparisons, were received 8.
The final report on the suitability of Great White CRM™ for ceramic glazes, confirming its zirconreplacement potential and including international benchmarking comparisons, was received. Key
results from the final report include:
•
Validated for use in blends where Great White CRM™ lends superior chromatic coordinate
properties compared to the interval values of standard kaolins in the market;
•
High-whiteness due to considerably lower iron, high alumina and typical titanium content, that
provides the potential to reduce usage of higher-cost zircon in ultra white and super white
ceramics segments; and,
•
Great White CRM™ (and Great White KCM™90) tested in glaze applications as showing
considerably higher mechanical strength compared to industry benchmarks. High mechanical
strength can reduce glaze defects during the manufacturing process.
The results confirmed and validated the testing conducted previously by IberoClays, which found that
Great White CRM™ provides above market value in use to the fast-growing large format porcelain and
ceramic tiles and glaze segments 9.
Additionally, further testing and analysis on the value in use of Great White CRM™ in reducing the
need to add zircon in the ultra-white and super-white ceramic slab segments, was conducted. The
analysis found that through using Great White CRM™, instead of other standard European kaolins,
manufacturers could reduce the use of higher-cost and increasingly scarce zircon by between 10-15%.
The ultra-white and super-white ceramic slab segments, which use formulations containing ~25%
kaolin, are a significant and growing opportunity for Andromeda.
End-user technical validation trials for the use of Great White HRM™ as an additive to decarbonise
concrete, with cement suppliers and concrete manufacturers, continued during the period, ahead of
the decision to sign the Strategic Alliance Agreement with Hallett Group.
Operations
Andromeda continued planning activities in anticipation of a final investment decision being made.
During the period, the procurement of long lead items was progressed, with the following activities
conducted and status:
• Fluidised bed dryer – factory acceptance testing conducted, warehoused ready for shipment;
7
Refer ADN ASX dated 16 November 2023 titled Strategic Alliance Agreement signed with Hallett Group.
8
Refer ADN ASX dated 18 July 2023 titled Presentation at Noosa Mining Conference.
9
As determined by testing conducted on Great White CRM™ by IberoClays (May/June 2023).
Andromeda Metals Limited
•
•
•
•
Page 9
Thickener – factory acceptance testing completed;
Drum washer – factory acceptance testing is scheduled to be completed in Q2 2024;
Filter Press – order placed and engineering continuing; and
Filter Cake Feeder – order placed and fabrication commenced.
The Company also progressed procurement of the ‘balance of plant’ capital and infrastructure items.
During the period, the subdivision process of the private land within TGWP’s Mining Lease (ML 6532)
and Miscellaneous Purposes Licence (MPL 164), to realign existing property boundaries to fit the
TGWP mine site footprint, was progressed. This follows the August 2022 signing of binding land
purchase agreements for the purchase of the freehold land from the existing landowners 10. Each
agreement includes a waiver for Exempt Land (under the Mining Act 1971), as required for the
commencement of authorised operations.
In June 2023, ahead of an expected increase in requests for samples, a comprehensive review was
undertaken. The focus of the review was to enable a scaling up of operations to support additional
customer testing and further product validation, while ensuring safe, sustainable operations. Following
the review, a ‘re-set’ of operations was undertaken with the Streaky Bay Pilot Plant (SBPP)
recommencing in late-July, with an expanded ability to produce large scale samples.
Following the reset, samples were produced at the SBPP and delivered, in line with the additional
sample requests for customer testing and product validation assessment.
During the period there were no lost time injuries, and no reportable environmental incidents.
Regional Minerals Exploration
TGWP – Regional Exploration (Andromeda 100%)
Eyre Kaolin Project (Andromeda farming in under Stage 1 to earn a 51% interest by
expending $750,000 by November 2024)
Following analysis of the results from follow-up drilling conducted at the Chairlift kaolin prospect,
located on tenement EL 6664 and conducted in March 2023, a combined Inferred Resource of 53.5
million tonnes (Mt) of kaolin was announced 11, comprising of:
•
•
27.0 Mt of Bright White, low titanium kaolinised granite (Chairlift CRM); and,
26.5 Mt of rheology modifier kaolin (Chairlift HRM).
Metals Projects
Drummond Epithermal Gold Project (Andromeda 0%)
During the period, the sale of the Drummond Epithermal Gold Project (Drummond), via the disposal of
Andromeda’s wholly owned subsidiary Adelaide Exploration Pty Ltd, to Rush Resources Limited
(Rush), was completed 12.
As a result of Rush being acquired by ASX-listed Trigg Minerals Limited (Trigg, ASX: TMG),
Andromeda received 29,500,000 shares, valued at $295,000, as consideration and for reimbursement
of expenses related to the sale of Drummond.
10
Refer ADN ASX dated 18 August 2022 titled Andromeda progresses Great White Kaolin Project with signing of Land
Acquisition Agreements and lodgement of PEPR.
11
Refer ADN ASX dated 16 November 2023 titled Chairlift Kaolin Deposit Mineral Resource Estimate, with underlying
assumptions continuing to apply, and no material changes.
12
Refer ADN ASX dated 16 November 2023 titled Sale of Drummond Epithermal Gold Project completes.
Andromeda Metals Limited
Page 10
The shares were issued in addition to the payment of $27,000 in cash and a cash refund of $7,500 in
respect of the environmental bonds for the project.
Moonta Copper Gold Project (Andromeda partial farm-out 100%)13
During the period, Andromeda entered into a Sale and Purchase Agreement, via wholly owned
subsidiary Peninsula Resources Pty Ltd (Peninsula), for exploration licence EL5984 (related to the
Moonta Copper Gold Project) with EnviroCopper Ltd (ECL) and its wholly owned subsidiary
Environmental Metals Recovery Pty Ltd (EMR) 14.
As consideration for the sale, Andromeda has or will receive the following:
•
At completion of the sale:
o $50,000 in cash;
o 203,008 fully paid ordinary shares in ECL, representing 5% of current issued capital in
ECL;
o Grant of a royalty, equal to 10% of the operating cashflow derived from the Moonta ISR
JV Project Area, up to $15 million, and
o Grant a royalty, equal to 10% of the operating cashflow derived from in respect of the
Moonta Project Area, up to $15 million.
•
Following successful completion of a Site Environmental Lixiviant Test (SELT) within the Project
Area being undertaken, at the sole discretion of Andromeda, either:
o $100,000 in cash; or
o 101,504 fully paid ordinary shares in ECL, representing 2.5% of current issued capital
in ECL;
•
Following granting of a Mining Lease within the Project Area to ECL, its related body corporate,
nominee or assignee, a further $150,000 in cash.
Subsequent to the period, completion of the sale occurred on 24 January 2024 15.
Wudinna Gold Project (Andromeda farm-out 25%)
During the period, the Company entered into a Subdivision and Sale Agreement with Cobra Resources
plc (Cobra) for the sale of the remaining 25% interest held in the tenements related to the Wudinna
Gold Project, for the consideration of $500,000 in cash and $1,000,000 in shares of Cobra (valued at
GBP 1 pence each) 16.
Cobra, through its wholly owned subsidiary Lady Alice Mines Pty Ltd (LAM), will acquire Andromeda’s
interest in the Wudinna Gold Project, held by wholly owned subsidiary Peninsula Resources Pty Ltd
(Peninsula), either via a tenement transfer or utilising the sub-division process under section 30AA of
the Mining Act 1971 (SA).
Completion is subject to the following conditions precedent:
• Cobra successfully undertaking a capital raising to the value of $500,000;
• Cobra receiving the necessary shareholder approval to issue the Consideration Shares; and
• obtaining any necessary third-party consents required for the transaction.
Subsequent to the period, in January 2024, 52,010,000 Cobra shares (Consideration Shares) were
issued to Peninsula in advance of completion of the sale. As the Consideration Shares have been
13
14
15
16
Andromeda’s interest as at 31 December 2023, prior to subsequent completion of sale occurring on 24 January 2024.
Refer ADN ASX dated 18 December 2023 titled Sale of Moonta Copper Gold Project.
Refer ADN ASX dated 24 January 2024 titled Completion of Sale of Moonta Copper Gold Project.
Refer ADN ASX dated 15 November 2023 titled Sale of remaining 25% interest in Wudinna Gold Project.
Andromeda Metals Limited
Page 11
issued in advance of completion, they are subject to a call option in favour of Cobra, obliging Peninsula
to sell all the Consideration Shares for £1 in total if the conditions precedent are not satisfied and the
Agreement with Cobra terminates without completion occurring. The Consideration Shares are subject
to escrow (subject to standard exclusions) until the earlier of:
i.
when LAM becomes the registered holder of the tenements applicable to the Wudinna
Project (via tenement transfer or the subdivision process in section 30AA of South
Australia’s Mining Act 1971; or
ii.
the date that is 12 months from the date of issue of the Consideration Shares.
The remaining condition precedent to be satisfied relates to third party consents required for the
transaction.
Research Projects
The Company continued to strategically assess the optionality of its research opportunities following
the completion of its revised Commercial Strategy, which determined they were Adjacent opportunities.
During the period, a strategic review of the Carbon Capture & Conversion Project (CC&C Project), was
conducted. The review outcomes led to a decision being taken to recycle the contained steel included
in the Carbon Capture Pilot Plant 17.
The Company continues to retain ownership of CC&C Project intellectual property (IP) and business
opportunity.
Funding
During the period, the Group continued moving towards making a final investment decision while
evaluating funding arrangements that best suit the long-term interests of the Company and its
shareholders.
The financing arrangements considered include a range of debt and equity mix options.
Discussions with potential debt financiers continued, supported by the development of a Bankable
Feasibility Study, while completion of the 2023 DFS supported discussions with potential equity
financiers.
Outlook and Future Developments
Looking forward, the Company’s primary focus will continue to be directed towards further advancing
TGWP, through the following:
17
•
Finalise ongoing discussions aimed at securing further binding offtake agreements;
•
Finalise ongoing discussions aimed at securing debt financing of TGWP;
•
Progress discussions aimed at securing potential investments by cornerstone or strategic
investors
•
Subject to securing the required funding and a final investment decision being made, progress
with construction on TGWP; and,
•
Continue exploration activities focused on prospects with complementary attributes to TGWP.
Refer ADN ASX dated 16 November 2023 titled Investor Update – Presentation.
Andromeda Metals Limited
Page 12
Dividends
No dividends were paid or declared since the start of the financial year, and the directors do not
recommend the payment of dividends in respect of the financial year.
Changes in State of Affairs
There was no significant change in the state of affairs of the Group during the financial year.
Competent Persons Statements
Information in this report that relates to the Exploration Results for The Great White Project, Eyre Kaolin Project and Mt
Hope Halloysite-Kaolin Project are based on information evaluated by Mr Eric Whittaker who is a Member of the
Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Whittaker is the Chief Geologist of Andromeda Metals
Limited and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Whittaker consents
to inclusion in this document of the information in the form and context in which it appears.
Subsequent Events
On 19 January 2024, a Binding Sales and Distribution Agreement with IberoClays SLU, was signed.
On 25 January 2024:
• the Company received payment of A$3.1 million tax refund due to research and development
incentives for activity conducted during the 2023 financial year, from the Australian Tax Office;
• the sale of the Moonta Copper Gold Project completed; and,
• 52,010,000 Cobra shares were issued to Andromeda’s wholly owned subsidiary Peninsula
Resources Pty Ltd, in advance of the completion of the sale of Wudinna Gold Project.
On 2 February 2024, independent Non-Executive Director, Melissa Holzberger stepped down from the
Board, reflecting a change in her board commitments.
On 21 February 2024, Sue-Ann Higgins was appointed as an Independent Non-Executive Director of
the Company.
Other Matters
There has not been any other matter or circumstance occurring subsequent to the end of the half-year
that has significantly affected, or may significantly affect, the operations of the Group, the results of
those operations or state of affairs of the Group in future financial years