16 metres at 3g/t gold in Eyre Peninsula drilling results
Released
Released
Announcement PDF
ASX announcement
24 July 2015
Adelaide Resources Limited
ABN: 75 061 503 375
Eyre Peninsula gold project
(100% owned), South Australia
Corporate details:
ASX Code: ADN
Cash: $1.24 million
Issued Capital:
304,545,685 ordinary shares
37,222,104 listed options (ADNO)
750,000 performance rights
Intersections to 16 metres at 3g/t gold achieved in
successful Barns and Baggy Green drilling programme.
Summary
•
All seven holes drilled at the Barns and Baggy Green
prospects intersect gold mineralisation, including
16.1 metres at 3.06g/t gold, supporting the previously
released Exploration Target tonnage and grade ranges.
•
Confirmation of predicted mineralisation zone boundaries
lowers the risk for future drill programmes.
Nick Harding
Executive Director and
Company Secretary
•
Results from Barns include intersections of 16.1 metres at
3.06g/t gold, 15 metres at 1.25g/t gold, 15 metres at 0.75g/t
gold and 7 metres at 1.1g/t gold.
Jonathan Buckley
Non-executive Director
•
At Baggy Green results include 11 metres at 1.87g/t gold
contained within a broader zone assaying 30 metres at
0.86g/t gold, and 8 metres at 1.22g/t gold.
•
Individual assay samples returned results of 16.7g/t gold and
13.2g/t gold indicating the presence of a high grade
component in the mineralised zones.
PO Box 1210
Unley BC SA 5061
•
Tel: +61 8 8271 0600
Fax: +61 8 8271 0033
Detailed assessment of the programme results and design of
follow-up exploration is now underway.
•
Exploration personnel are on site for commencement of the
Company’s first drilling programme at the South West Limey
Dam prospect in Queensland’s Drummond Basin.
Directors:
Colin G Jackson
Non-executive Chairman
Chris Drown
Managing Director
Contact details:
69 King William Road,
Unley, South Australia 5061
adres@adelaideresources.com.au
www.adelaideresources.com.au
Fact:
Adelaide Resources was the first
company to discover gold on the
Eyre Peninsula project. Prior to the
commencement of its exploration
effort there were no recorded gold
occurrences in the area.
Chris Drown
Managing Director
Direct enquiries to Chris Drown. Ph (08) 8271 0600 or 0427 770 653.
Introduction
Adelaide Resources holds nine Exploration
Licences on the Eyre Peninsula which secure
a total area of 3,643 square kilometres.
The Barns, White Tank and Baggy Green
gold prospects are located within 5km of each
other and fall on two adjoining tenements
(Figure 1). The two tenements are wholly
owned by the Company and are subject
to a 1.5% NSR royalty held by Newcrest
Mining Limited.
On 14 May 2015 the Company released
a combined Exploration Target for the Barns
and Baggy Green prospects and announced
it had commenced a drilling programme
targeting both deposits(1).
The Exploration Target was estimated using
historical drill results and interpreted 3-D
models of the broad mineralised envelopes
which enclose multiple stacked zones of gold
mineralisation at Barns and Baggy Green.
To a depth of 200 metres below surface the
Company estimated a combined Exploration
Target ranging from 20 to 40 million
tonnes at a grade ranging from
0.4g/t gold to 0.6g/t gold within
the broad mineralised envelopes
at Barns and Baggy Green.
The potential tonnage and grade
of the Exploration Target is conceptual
in nature as there has been insufficient
exploration to estimate a Mineral
Resource, and it remains uncertain
if further exploration will result in the
estimation of a Mineral Resource.
The 14 May release also highlighted
the potential to define smaller tonnage
but higher grade resources at Barns
and Baggy Green, by focussing
on discreet mineralised zones within
the broader mineralisation envelopes.
Drill programme results
Seven diamond holes were drilled
for a total of 1,287 metres in the recent
programme. Four holes were drilled
at Barns and three at Baggy Green.
The locations of the holes are shown
on Figure 2 (Barns) and Figure 3
(Baggy Green).
Six of the holes targeted previously
undrilled regions within the modelled
mineralised envelopes at the two
prospects. One hole was drilled
as a twin between two close spaced
historical reverse circulation holes
at Baggy Green to check for close
range continuity of gold mineralisation.
The drill core was oriented where
possible to allow the collection
of structural data.
Assaying of drill core is now complete
and confirms that all seven holes
intersected gold mineralisation.
Table 1 presents a list of the gold
intercepts recorded in the holes.
Drill – Discover – Develop
P a g e |2
Drill – Discover – Develop
P a g e |3
At Barns, hole PDBN-320 intersected
16.1 metres at 3.06g/t gold (Figure 4).
The intersection is contained within a broader
zone of 23.5 metres at 2.16g/t gold
commencing from 29.5 metres downhole,
a vertical depth of approximately 26 metres
below surface.
This gold zone is interpreted to be part
of a relatively flat lying body of supergene
mineralisation and is interpreted to have
a true thickness of approximately 20 metres.
Baggy Green hole PDBG-1217 (Figure 5)
was drilled as a twin hole between historical
reverse circulation holes RCBG-0865
(24 metres at 2.33g/t gold) and BGRC-0856
(36 metres at 0.76g/t gold).
PDBN-1217 intersected 30 metres at 0.86g/t
gold from 59 metres, including 11 metres
at 1.87g/t gold from 68 metres. PDBN-1217
supports the historical lower grade
intersection while the nearby higher grade
historical hole demonstrates that grade can
improve rapidly over short distances.
Drill – Discover – Develop
PDBN-320 encountered additional
deeper mineralised zones including
3 metres at 3.48g/t gold from
99 metres, and 17 metres
at 0.62g/t gold from 135 metres.
Other intersections of note at Barns
include 15 metres at 1.25g/t gold from
134 metres downhole in PDBN-319,
and 15 metres at 0.75g/t gold from
37 metres downhole in PDBN-321.
Holes PDBG-1218 and PDBG-1219
were drilled on a new section 100
metres south of PDBN-1217. Both
holes intersected gold mineralisation
in the location predicted by the
recently constructed 3-D model,
with PDBN-1218 recording 8 metres
at 1.22g/t gold from 99 metres.
The drill core from all holes was
oriented allowing the collection
of structural data which is currently
being assessed.
P a g e |4
Discussion
The intersection of gold mineralisation
in precisely the location predicted by
the 3-D models is pleasing, suggesting
that follow-up exploration drilling can
be sited with a high degree of confidence.
This is particularly the case at Baggy
Green where the existing drill pattern
is very coarse.
The programme results additionally
provide confidence that further exploration
should deliver resources within the
tonnage and grade ranges estimated
in the Exploration Target.
At Barns, the new results add confidence
in the continuity of the individual
mineralised zones that are contained
within the broader mineralised envelope.
This suggests it will be possible to
estimate resources which focus on
these smaller but higher grade portions
of the deposit.
Drill – Discover – Develop
The relatively shallow, flat lying zone
of supergene gold that lies directly below
the depleted zone at Barns is interpreted
to be present in many prospect holes,
and the recent results confirm it can reach
significant widths at good grade. Likewise,
a second coherent zone of mineralisation
appears to be commonly present at
the base of the mineralised envelope.
Full assessment of the programme results,
including analysis of the large amount of
structural data collected from the oriented
drill core, modelling of the discreet higher
grade gold zones at Barns, and design
of the follow-up exploration programme
is now underway.
The exploration team is now in the field
in Queensland in advance of the
commencement of the Company’s first
drilling targeting the South West Limey
Dam prospect on the Drummond
Epithermal Gold Project. The Drummond
programme will be the Company’s fourth
drilling programme of calendar 2015.
P a g e |5
Drill – Discover – Develop
P a g e |6
Competent Person Statement and JORC 2012 notes
The information in this report that relates to Exploration Targets, Exploration Results, Mineral
Resources or Ore Reserves is based on information compiled by Chris Drown, a Competent Person,
who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Drown is employed by
Drown Geological Services Pty Ltd and consults to the Company on a full time basis. Mr Drown has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Drown consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
(1)
Information relating to the Exploration Target and past exploration required to ensure compliance
with JORC2012 was disclosed in ADN’s 14 May 2015 ASX release titled “Diamond drilling commences
at Barns and Baggy Green gold prospects.”
1
JORC CODE, 2012 EDITION – TABLE 1
1.1 Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
Techniques
Drill Sample
Recovery
JORC Code explanation
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
hand held XRF instruments, etc) These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (air core, reverse circulation, open-hole
hammer, rotary air blast , auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face sampling bit or other
type, whether core is orientated and if so, by what
method, etc).
• Method of recording and assessing core and chip
sample recoveries and results assessed.
Drill – Discover – Develop
Commentary
• Drill samples collected by
sawing HQ or NQ2 sized
diamond core in half, with half
core submitted for assay, and
half retained for geological
record.
• Core was sawn 5mm around
from orientation line (if
orientations successful) with
half with orientation line
retained in trays.
• Duplicate samples collected by
quarter sawing ½ core with
both samples submitted for
assay.
• Core was HQ or NQ2. Short
precollars were drilled using
rotary mud method.
• Core recoveries calculated by
dividing length of core
P a g e |7
• Measures taken to maximise sample recovery and
ensure representative nature of the sample.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
coarse/fine material.
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half
or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representativity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument make
and mode, reading times, calibration factors
applied and their derivation, etc.
• Nature and quality control procedures adopted (eg
Drill – Discover – Develop
recovered by depth hole
advanced. HQ core recoveries
averaged 74.7% for all holes.
.NQ2 sample recoveries
averaged 99.3% for all holes.
• Good drilling practices were
employed to maximise core
recovery
• There is no known relationship
between sample recovery and
grade at the Barns and Baggy
Green deposits and it is
considered unlikely that sample
bias has occurred in diamond
drilling samples.
• All drill core was logged with
geological (lithology,
mineralogy, alteration,
mineralisation and structure),
geophysical (magnetic
susceptibility) and geotechnical
(RQD) information collected.
• Geological logging is
qualitative. Geophysical and
geotechnical logging is
quantitative. All core has been
photographed wet and dry.
• 100% or the intersections were
logged.
• Core was sawn in half, with
duplicate samples collected by
¼ sawing.
• Samples were first crushed to
70% passing 6mm, then 3kg of
sample was pulverised with the
goal of achieving 85% passing
75um. No sample checked for
sizing failed to meet the target
grind size.
• 22 of 895 samples submitted
were >3kg in weight and were
riffle split following crushing to
deliver a <3kg sample for
pulverising..
• 18 ¼ core duplicate pairs (1 in
every 50 samples) were
submitted for assay.
• 1-metre ½ HQ and NQ2 core
are common sample sizes for
gold exploration.
• Drill samples were assayed in a
commercial lab using standard
methods.
• Gold was determined by fire
assay with AAS finish utilising
a 30gm charge weight.
• Other metals were determined
using four-acid digest with ICPAES finish.
P a g e |8
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established.
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical or electronic) protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classification applied.
• Whether sample compositing has been applied.
Orientation
• Whether the orientation of sampling achieves
Drill – Discover – Develop
• Company QA/QC samples
(standards and duplicates at a
ratio or 1 in every 25 samples)
and Laboratory QA/QC
samples (standards, blanks,
duplicates) were introduced into
the assay stream.
• Magnetic susceptibility
readings were made using a
GMS-2 magnetic susceptibility
meter set in scan mode and
regularly zeroed to avoid
machine drift and local
background mag field
variations.
• The intersections reported were
calculated by the Competent
Person and double checked by a
second Company geologist.
• One hole reported is effectively
a twin hole to two close spaced
historical RC holes.
• All non-assay data was digitally
captured in the field and then
imported into the Company
database. Assay data was
imported into the Company
database upon receipt of lab
data files.
• No assay results have been
adjusted.
• Hole collar locations were
pegged using a GPS with
autonomous accuracy of +/- 5
meters.
• Downhole surveys were
completed using Reflex EZshot digital downhole camera
survey tools. Suspicious DH
azimuths were replaced with
estimates from adjacent
surveys.
• MGA94 (Zone 55)
• Collar RLs estimated using
published government
acquired 10m topographic
contour data.
• Holes were drilled on traverses
nominally spaced 50 metres
apart (Barns) or 100m apart
(Baggy Green).
• The spacing of the holes,
together with historical data, is
considered sufficient to
establish geological and grade
continuity.
• No sample compositing has
been applied.
• Six drill holes were ideally
P a g e |9
of data in
relation to
geological
structure
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample
security
• The measures taken to ensure sample security.
Audits
reviews
or
• The results of any audits or reviews of sampling
techniques and data
designed to intersect interpreted
mineralised zones at a high
angle. To minimise
environmental damage, one
hole at Baggy Green tested the
interpreted lode at an angle of
incidence of approximately 47
degrees.
• It is doubtful that drilling
orientation has resulted in
sampling bias, however full
assessment of structural
information, including the
orientation of mineralised
veins, remains to be completed
to confirm this.
• Core samples remained under
the supervision of company
personnel prior to packing,
strapping and dispatch to the
commercial lab in Adelaide.
The Competent Person was
present when the lab unpacked
some of the drill core prior to
cutting and assay.
• No audits or reviews have been
completed.
1.2 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section may apply to this section)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code explanation
• Type, reference name/number, location and ownership
including agreements of material issues with third
parties such as joint ventures, overriding royalties,
native titles interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
Drill – Discover – Develop
Commentary
• The Barns prospect falls in EL
5092 and the Baggy Green
prospect falls in EL 5120. Both
tenements are owned 100% by
Peninsula Resources limited, a
wholly owned subsidiary of
Adelaide Resources Limited.
• Newcrest Mining Limited
retains a 1.5%NSR royalty over
future mineral production from
both licences.
• The Barns prospect falls on
Perpetual leasehold land used
for cereal cropping
• The Baggy Green prospect is
located within Pinkawillinnie
Conservation Park, a dual
proclamation park where
exploration and mining
activities are allowed subject to
meeting environmental
conditions imposed by the SA
Govt.
• Native Title is extinguished on
P a g e | 10
Exploration
done by
other
parties
• Acknowledgement and appraisal of exploration by
other parties.
Geology
• Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o Easting and northing of the drill collar
o Elevation or RL (Reduced Level – elevation above
sea level in meters) of the drill collar.
o Dip and azimuth of the hole.
o Down hole length and interception depth.
o Hole length.
• If the exclusion of this information is justified on the
axis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging
techniques, maximum and/ or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
Data
aggregation
methods
Drill – Discover – Develop
Perpetual Leasehold land
(Barns) but may exist in
Pinkawillinnie Conservation
Park (Baggy Green). A Native
Title Agreement has been
negotiated with the NT
Claimant and has been
registered with the SA Govt.
• Aboriginal heritage surveys
have been completed over both
prospects with no sites located
in the immediate vicinity of the
prospects.
• A Compensation Agreements is
in place with the relevant
agricultural landowner.
• ELs 5092 and 5120 are in good
standing.
• On-ground exploration
completed prior to Adelaide
Resources’ work was limited to
400 metre spaced soil
geochemistry completed by
Newcrest Mining Limited over
the Barns prospect. This
sampling located a gold
anomaly.
• The Barns and Baggy Green
prospects are considered to be
either lode gold or intrusion
related gold deposits related to
the 1590Ma Hiltaba/GRV
tectonothermal event. Gold
mineralisation is structurally
controlled and associated with
significant alteration of host
rocks.
• The information listed to the
left is included in Table 1 of the
report.
• Intersections are calculated by
length weighted averaging of
individual (normally 1-metre)
assays.
• No cutting of assays has been
employed.
• Sub-intervals of higher grade
P a g e | 11
•
be stated and some typical examples of such
aggregations should be shown in some detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Relationship
between
mineralisati
on widths
and
intercept
lengths
•
Diagrams
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, ground water, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• The nature and scale of planned further work (eg tests
of lateral extensions or depth extensions or large scale
step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
Balanced
Reporting
Other
substantive
exploration
data
Further
work
•
•
Drill – Discover – Develop
are contained in Table 1 of the
report.
• No metal equivalents are
reported.
• Figures 4 and 5 of the report
illustrate the orientation of
drilling with respect to
interpreted mineralisation
orientation, while the
interpreted orientation of the
mineralisation is also discussed
in the report.
• Appropriate plans and sections
with scales appear as Figures 1
to 5 in the report. A tabulation
of intersections appears as
Table 1.
• The footnote to Table 1
discloses the rules chosen for an
intersection to be included in
the table.
• There is no other exploration
data considered material to the
report in question which has not
been disclosed.
• The report advises that the
Company is planning to assess
the resource potential of
internal higher grade
mineralised zones at Barns and
plan more detailed drilling at
Baggy Green.
P a g e | 12
Share your feedback
Discover