Broad intervals of mineralisation in latest Drummond results
Released
Released
Announcement PDF
ASX announcement
23 October 2015
Adelaide Resources Limited
ABN: 75 061 503 375
Drummond epithermal gold project
(100% owned), Queensland
Corporate details:
Broad intervals of gold and silver mineralisation
in the latest South West Limey Dam results.
ASX Code: ADN
Cash: $0.60 million*
Issued Capital:
304,545,685 ordinary shares *
37,222,104 listed options (ADNO)
750,000 performance rights
Summary
•
The South West Limey Dam prospect is one of several goldbearing epithermal prospects in the emerging 100% owned
Glenroy Field, a mineral field in the Drummond Basin of similar
dimension to the 3 million ounce plus Pajingo Field to the west.
•
Latest drill results from South West Limey Dam include broad
intervals of gold and silver mineralisation in six holes testing
a large surface arsenic anomaly in the south of the prospect.
•
Gold results include 16.8 metres at 0.18g/t, 17.7 metres at
0.17g/t, 19.0 metres at 0.19g/t Au, and 5.2 metres at 0.34g/t.
•
Silver results include 96.5 metres at 1.01g/t, 19.4 metres
at 0.92g/t, 36.2 metres at 0.91g/t, and 6.3 metres at 1.61g/t.
•
A field review completed by consultant Dr Gregg Morrison,
an epithermal specialist, interprets the South West Limey Dam
prospect to be a classic hotspring geothermal-epithermal system.
•
Dr Morrison interprets the long intervals of low grade gold and
silver in the latest holes as good indicators of the system being
active and mineralised, but from the upper part of the system
above the target high grade gold feeder vein zone.
•
The Morrison review finds there are good analogues for the
South West Limey Dam system with significant deposits both
in the region and internationally that encourage persistence.
(*Pre SPP settlement on 27/10/15)
Directors:
Colin G Jackson
Non-executive Chairman
Chris Drown
Managing Director
Nick Harding
Executive Director and
Company Secretary
Jonathan Buckley
Non-executive Director
Contact details:
69 King William Road,
Unley, South Australia 5061
PO Box 1210
Unley BC SA 5061
Tel: +61 8 8271 0600
Fax: +61 8 8271 0033
adres@adelaideresources.com.au
www.adelaideresources.com.au
Fact: Current exploration
at Pajingo is targeting the
Camembert and Moonlight
prospects which are high grade
veins located below hotspring
sinters and hydrothermal eruption
breccias in the same stratigraphic
units as South West Limey Dam.
Chris Drown
Managing Director
Direct enquiries to Chris Drown. Ph (08) 8271 0600 or 0427 770 653.
Introduction
New Results
Adelaide Resources Limited owns 100%
of two tenements that cover 270 square
kilometres of ground in the Drummond
Basin in Queensland (Figure 1).
The South West Limey Dam prospect
can be divided into a topographically
lower northern area, and a topographically
higher southern area (Figure 2).
The Company’s tenements capture the
emerging Glenroy Field, an epithermal
mineral field of similar dimension to the
+3Moz Pajingo Field to the west.
The northern area is characterised by
outcropping banded textured quartz veins,
like Alexandra, which rock chip samples
show contain high grade gold in places.
Areas of silica alteration and brecciated
host rocks are restricted and arsenic
concentrations in the soils are low.
The Company is undertaking a diamond
drilling programme at the South West
Limey Dam prospect. The programme
is partly funded through a grant from the
Queensland Government made through
its Collaborative Drilling Initiative. This
grant will reimburse 50% of the direct
drilling costs to a maximum of $100,000.
On 21 September 2015 the Company
announced results from the first fourteen
programme drill holes which included gold
mineralisation in quartz veins intersected
in the northern part of the prospect.
Intersections recorded in the early holes
included 0.71 metres at 9.11g/t gold and
11.0g/t silver, and 0.70 metres at 1.43g/t
gold and 4.2g/t silver.
Assays for a further six holes are now
finalised.
Drill – Discover – Develop
By contrast the higher southern area
of the prospect is characterised by an
extensive arsenic soil anomaly,
widespread silica alteration and host
rock brecciation. Quartz veins at surface
are massive or chalcedonic and contain
low grade gold. Recently sinters and
geyserite have also been recognised.
The characteristics seen in the southern
area of the prospect are typical of the
higher levels of an epithermal system,
above any gold zone that may be present.
Diamond drill holes GLD022 to GLD027
where therefore drilled to test for deeper
gold targets in the southern area of the
prospect. The locations of these drill holes
are shown on Figure 2.
P a g e |2
The southern drill holes intersected
an extensive blanket of silica altered,
brecciated, sulphidic rock before deeper
holes passed into unsilicified units of the
volcanic host stratigraphy (Figure 3).
Drill – Discover – Develop
Broad intervals of low grade gold and
silver are present, with all holes reported
herein encountering at least some
mineralisation. Intersections from the
six holes are included in Tables 1 and 2.
P a g e |3
Drill – Discover – Develop
P a g e |4
Figure 3 presents a cross section that
includes a number of the recent holes.
GLD022 encountered numerous zones
of gold including 16.8 metres at 0.18g/t
gold. The hole also intersected 96.5
metres at 1.01g/t silver from near surface.
GLD023 hit a number of low grade
intervals including 17.7 metres at 0.17g/t
gold and 36.2 metres at 0.91g/t silver,
while steeper GLD024 intersected
19.0 metres at 0.19g/t gold.
Discussion and interpretation
The Company engaged consulting
geologist Dr Gregg Morrison, a respected
epithermal deposit expert, to conduct
a field review of the South West Limey
Dam prospect to assist with understanding
the geological system.
Dr Morrison interprets South West Limey
Dam to be “a large hotspring geothermalepithermal system exposed near the
contemporary land surface”, and suggests
Drill – Discover – Develop
the model(1) shown in Figure 4 to be
an appropriate working model for
understanding the prospect’s geology.
In this model, the high grade target gold
zone is the deep quartz-adularia “feeder”
vein shown in red. The target vein sits
beneath a zone of weakly mineralised
silica altered and brecciated rock
of much greater lateral extent.
The broad zones of low grade gold
and silver seen in holes like GLD022
are hosted in silicified rock and breccia
overlain by silica sinter corresponding with
the upper part of the hotspring model.
Each of the holes on the Figure 3
cross section passed out of silicified
and brecciated rocks into deeper zones
of essentially unsilicified rocks. This is
the level in the epithermal system where
the targeted high grade gold feeder veins
are anticipated to occur, although they
have proved elusive to date.
P a g e |5
Dr Morrison suggests there are good
analogues for the South West Limey Dam
model with significant deposits both in the
region and internationally.
In the Pajingo Field, the Camembert and
Moonlight prospects, which are currently
being explored by Evolution Mining, are
hotspring systems with underlying veins
hosted in the same stratigraphic units
seen in the South West Limey Dam area.
Elsewhere in the Drummond Basin,
Wirralie (1.02Moz), Yandan (365koz),
and Glen Eva (60koz) are gold deposits
of the same style and hosted in the same
stratigraphic package as South West
Limey Dam.
Internationally, Dr Morrison cites the
1 million ounce Golden Promise mine
in Washington State, USA, and the
13 million ounce Fruta del Norte deposit
in Ecuador as deposits of similar character
to South West Limey Dam.
Drill – Discover – Develop
The Company remains confident that
feeder veins must be present somewhere
beneath the laterally extensive silica zone
in the southern parts of the South West
Limey Dam prospect.
The prospect geology is seen
to be closely analogous to many well
mineralised gold deposits, including
some which are multi-million ounce
deposits, and this also encourages
drilling persistence.
The South West Limey Dam drilling
programme was completed on
18 October 2015. Assaying of the
remaining holes is now underway.
(1)
Berger, B. R., and Eimon, P. I., 1983,
Conceptual models of epithermal precious
metal deposits, in Shanks, W. C., ed., Cameron
volume on unconventional mineral deposits:
New York, Society of Mining Engineers of
AIME, p. 191-205.
P a g e |6
Competent Person Statement
The information in this report that relates to Exploration Targets, Exploration Results, Mineral
Resources or Ore Reserves is based on information compiled by Chris Drown, a Competent Person,
who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Drown is employed by
Drown Geological Services Pty Ltd and consults to the Company on a full time basis. Mr Drown has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Drown consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
JORC CODE, 2012 EDITION – TABLE 1
1.1 Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
Techniques
Drill Sample
Recovery
JORC Code explanation
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
hand held XRF instruments, etc) These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (air core, reverse circulation, open-hole
hammer, rotary air blast , auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face sampling bit or other
type, whether core is orientated and if so, by what
method, etc).
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the sample.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
coarse/fine material.
Drill – Discover – Develop
Commentary
• Diamond core drilling was
used to obtain HQ or NQ sized
core samples whish were cut in
half to provide assay samples
of 1.7kg average weight.
Samples were crushed and
pulverised. Gold determined
by 30gm fire assay with AA
finish. Silver determined by
four acid digest with ICP-AES
finish on 0.25gm charge.
• Diamond drilling delivering
HQ or NQ triple tube sized
core samples. HQ core
orientated where competency
allows
• Core recoveries are calculated
by measuring actual core
length and comparing with
drilled depth.
• HQ and NQ triple tube core
was used to maximise
recoveries.
• Core recovery in all reported
holes was excellent.
• No known relationship exists
P a g e |7
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• If core, whether cut or sawn and whether quarter, half
or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representativity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument make
and mode, reading times, calibration factors
applied and their derivation, etc.
• Nature and quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established.
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical or electronic) protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill – Discover – Develop
between recovery and grade
for the South West Limey
Dam prospect.
• All core has been geologically,
geophysically and
geotechnically logged, and
photographed.
• Geological logging is
qualitative. Geophysical and
geotechnical logging is
quantitative.
• Core was cut in half with a
core saw. Half core samples
sent for assay and half retained
for geological record.
• Assay samples were crushed
and pulverised as per standard
industry practice.
• Company and Laboratory
introduced standards, blanks
and duplicates were used.
• In general, epithermal gold is
expected to be very fine
grained, and gold observed
petrologically from South
West Limey Dam was fine
grained (<15um).
• Core samples were assayed in
a commercial lab using
standard methods.
• Gold was determined by fire
assay with AAS finish utilising
a 30gm charge weight.
• Other metals were determined
using four-acid digest with
ICP-AES finish.
• Company and laboratory
QAQC samples were
introduced into the rock chip
assay stream.
• No calibration factors have
been applied to results
reported.
• The tables of intersections
included in the report have
been cross checked by two
company personnel.
• No twinned holes have been
drilled.
• Data is digitally captured onsite prior to import into the
company database.
• No assay results have been
adjusted.
• Drill collar locations surveyed
using a GPS with an accuracy
of +/- 5 metres.
• Collar RLs estimated from
P a g e |8
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits
reviews
or
• Data spacing for reporting of Exploration Results
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classification applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
• The results of any audits or reviews of sampling
techniques and data
published 10m contour data.
• Downhole surveys completed
using digital compass tools.
• GDA94 (Zone 55)
• Holes in this initial program
are not at any set spacing, but
are designed to test specific
targets.
• No sample compositing has
been applied.
• Drill holes designed to
intersect target at high angle,
constrained in some situations
by topographic limitations to
establishing safe drill pads.
• It is unknown if drilling
orientation has introduced any
sample bias.
• The core samples were
prepared and packaged for
delivery by company staff or
contractors, with samples then
delivered to the lab by
company personnel if possible.
• There have been no audits or
reviews of sampling
techniques or data at this time.
1.2 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section may apply to this section)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code explanation
• Type, reference name/number, location and ownership
including agreements of material issues with third
parties such as joint ventures, overriding royalties,
native titles interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
Exploration
• Acknowledgement and appraisal of exploration by
Drill – Discover – Develop
Commentary
• The area the subject of this
report falls within EPM
18090, which is 100% owned
by Adelaide Exploration Pty
Ltd, a wholly owned
subsidiary of Adelaide
Resources Limited.
• There are no third party
agreements, non govt
royalties, or historical sites
known. Underlying land title
is Pastoral leasehold. The
tenement area is covered by a
Native Title claim and an
Exploration Agreement has
been executed with the Native
Title Claimants. An aboriginal
work area clearance has been
completed over the prospect
the subject of the report.
• EPM 18090 is in good
standing.
• The general area the subject
P a g e |9
done by
other
parties
other parties.
Geology
• Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o Easting and northing of the drill collar
o Elevation or RL (Reduced Level – elevation above
sea level in meters) of the drill collar.
o Dip and azimuth of the hole.
o Down hole length and interception depth.
o Hole length.
• If the exclusion of this information is justified on the
axis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging
techniques, maximum and/ or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in some detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisati
on widths
and
intercept
lengths
Diagrams
Balanced
Reporting
Other
substantive
exploration
data
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
Drill – Discover – Develop
of this report has been
explored in the past most
notably by Hunter Resources
and MIM Exploration. The
Company has reviewed past
exploration data generated by
these companies.
• Deposits in the general region
are considered to be of low
sulphidation epithermal vein
style.
• The suggested information is
included in Tables 1 and 2 of
the report.
• Intersections were calculated
by length weighting of
individual samples.
• No metal equivalents are
reported.
• The footnotes to Tables 1 and
2 state that the intersections
are downhole lengths.
• Appropriate plans and
sections are included as
Figures 1 to 4 in the report.
• All material results are
reported.
• Additional information,
including the results of a
consultant study are included
in the report.
P a g e | 10
Further
work
density, ground water, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• The nature and scale of planned further work (eg tests
of lateral extensions or depth extensions or large scale
step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
Drill – Discover – Develop
• The report advises that the
company is awaiting further
analytical results from its
drilling programme at South
West Limey Dam prospect.
P a g e | 11
Share your feedback
Discover