Drummond diamond drilling program underway
Released
Released
Announcement PDF
ASX announcement
27 July 2015
Adelaide Resources Limited
ABN: 75 061 503 375
Drummond epithermal gold project
(100% owned), Queensland
Corporate details:
ASX Code: ADN
Cash: $1.24 million
Issued Capital:
304,545,685 ordinary shares
37,222,104 listed options (ADNO)
750,000 performance rights
High grade epithermal gold targeted at South West Limey
Dam as drilling programme gets underway.
Summary
•
A 1,200 metre diamond drilling programme commenced
on 25 July at the South West Limey Dam gold prospect
in Queensland’s Drummond Basin.
•
The South West Limey Dam prospect is a confirmed
epithermal mineral system that extends for over 2 kilometres
of strike. It displays geological similarities to the multi-million
ounce, high grade Pajingo deposit located 75km to the west.
•
Rock chip samples collected from outcropping quartz veins
in the northern part of the prospect have recorded high
grades, with results up to 55.4g/t gold.
•
A large arsenic (epithermal gold pathfinder metal) anomaly
defines the southern part of the prospect, and potentially
sits above a fully preserved gold zone.
•
Drilling will target both the outcropping gold-bearing vein
systems in the north, and gold targets below the arsenic
anomaly in the south.
•
Up to 15 holes will be drilled during the programme
presenting multiple opportunities for exploration success.
•
The drill programme will be partly funded through a grant
of up to $100,000 from the Queensland Government
made under its Collaborative Drilling Initiative.
Directors:
Colin G Jackson
Non-executive Chairman
Chris Drown
Managing Director
Nick Harding
Executive Director and
Company Secretary
Jonathan Buckley
Non-executive Director
Contact details:
69 King William Road,
Unley, South Australia 5061
PO Box 1210
Unley BC SA 5061
Tel: +61 8 8271 0600
Fax: +61 8 8271 0033
adres@adelaideresources.com.au
www.adelaideresources.com.au
Fact:
The first recorded discovery
of epithermal style gold in
the Drummond Basin was at
Mt Coolan in 1913. The Scott
Lode at Pajingo was discovered
in 1984.
Chris Drown
Managing Director
Direct enquiries to Chris Drown. Ph (08) 8271 0600 or 0427 770 653.
Adelaide Resources’ is pleased to announce
that diamond drilling is underway at the South
West Limey Dam gold prospect on the
Company’s 100% owned Drummond project
in northern Queensland (Figure 1).
pathfinder metal in epithermal mineral
systems and it is often deposited
at higher levels than gold, so its
presence can point to preserved
gold targets at depth.
The prospect is situated in the Drummond
Basin, a geological province that hosts
epithermal mineral deposits such as the
multi-million ounce producing Pajingo field.
The current programme will comprise
1,200 metres of diamond drilling, with
holes designed to target both the
northern gold-bearing vein systems,
and potential gold targets below the
arsenic anomaly in the south.
The Company’s surface exploration at South
West Limey Dam has defined a large
prospective area of approximately 2,000
metres by 700 metres (Figure 2).
High grade gold has been recorded in rock
chip samples collected from outcropping
quartz veins in the northern part of the
prospect. Individual rock chip assay results
include 55.4g/t gold, 51.5g/t gold, 34.2g/t gold,
31.0g/t gold, 26.9g/t gold, and 21.7g/t gold.
The high grade samples display colloform
banding, a texture typically seen in the gold
zone of epithermal deposits. Similar colloform
banded veins host high grade gold at the
Pajingo mine.
A large and high magnitude arsenic soil
geochemical anomaly defines the southern
part of the prospect. Arsenic is a common
Drill – Discover – Develop
It is anticipated that up to 15 holes
will be drilled during the programme,
presenting multiple opportunities
to achieve exploration success.
The drill programme will be partly
funded through a grant of up to
$100,000 from the Queensland
Government made under its
Collaborative Drilling Initiative.
Drilling operations may take up to two
months to complete, with results from
early holes possibly available in
around five weeks.
The Drummond programme is the
fourth drilling programme undertaken
by the Company in calendar 2015.
P a g e |2
Competent Person Statement and JORC 2012 notes
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore
Reserves is based on information compiled by Chris Drown, a Competent Person, who is a Member of The
Australasian Institute of Mining and Metallurgy. Mr Drown is employed by Drown Geological Services Pty Ltd
and consults to the Company on a full time basis. Mr Drown has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Drown consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears. Exploration results discussed in this report
have previously been released in compliance with JORC2012 requirements - See ADN’s ASX releases dated
15/11/2013, 14/8/2014, 29/10/2014, 19/5/2015 and 16/6/2015.
Drill – Discover – Develop
P a g e |3
Share your feedback
Discover