HPA Pilot Plant Commissioned - Next Phase Underway
Released
Released
Announcement PDF
Sign-up and log into ADN’s Investor Hub
HPA Pilot Plant Commissioned and Optimisation and Testwork
Program Underway
➢ HPA Pilot Plant commissioned
➢ Pilot plant optimisation and testwork program underway
➢ Commercial 4N HPA samples targeted for customer evaluation in H2 2026
➢ Additional value potential from silica and gallium co-products under evaluation
Andromeda Metals Limited (ASX: ADN) (Andromeda, the Company) is pleased to advise that
commissioning of the High Purity Alumina (HPA) pilot plant has been completed and the pilot plant
optimisation and testwork program is now underway.
The testwork program will focus on optimising the continuous flowsheet process, advancing HPA
product development and evaluating opportunities to generate additional value through the
production of co-products, including amorphous silica and gallium1. As part of the optimisation of
the pilot plant, a number of enhancements identified during commissioning are being
implemented to support the transition from laboratory-scale testwork to pilot-scale continuous
operation.
One of the key objectives of the program is to produce commercial HPA samples for evaluation by
potential customers. HPA is a highly refined form of aluminium oxide. It is a recognised critical
mineral in Australia, USA and Europe2 and used in high growth end-use markets such as LEDs, lithium-
ion battery separators, electronics and semiconductors and synthetic sapphire glass.3 It is also used
in next generation applications, including data centres powering AI, aerospace and defence.4
Given Andromeda’s proprietary process is very flexible, HPA product can be tailored to suit various
customer requirements, including differing morphology and product form. Feedback from
potential customers is expected to help guide product development and identify key target
markets for future feasibility studies.
1
Refer ADN ASX dated 22 June 2026 titled High Purity Alumina Project Update.
2
HPA is included on the Critical Minerals Lists by Australia, the United States and the European Union – see respectively
https://www.industry.gov.au/publications/australias-critical-minerals-list-and-strategic-materials-list,
https://www.usgs.gov/news/nationalnews-release/us-geological-survey-releases-2022-list-critical-minerals, https://single-
market-economy.ec.europa.eu/sectors/raw-materials/areas-specific-interest/critical-rawmaterials_en
3
High Purity Alumina Special Report 2023, CRU
4
High Purity Alumina Market Assessment, FutureBridge (commissioned by Andromeda), August 2025
Andromeda Metals Limited ASX: ADN
ASX Announcement
10/431 King William Street
Adelaide, SA 5000
Tel:+61 8 7089 9800
ir@andromet.com.au
29 July 2026
ABN
75 061 503 375
Through its HPA Project, Andromeda is seeking to develop the next-generation HPA supply chain,
independent of traditional aluminium markets, leveraging its high-quality, low-impurity Great White
kaolin as feedstock and proprietary HPA processing pathway, which has already demonstrated
99.9985%5 HPA purity at laboratory scale.
The value creation potential of this HPA opportunity, highlighted in the Company’s 2025 Scoping
Study6, showed strong project economics and the potential for Andromeda to be highly
competitive globally, particularly on cost of production and capital intensity.
As part of the testwork program, the by-product materials generated will be further analysed and
assessed for potential commercial applications. This includes amorphous silica and minor elements
such as the critical mineral gallium.
The reclassification of by products as high-value co-products could further enhance the strong
economics and market-leading low-cost production potential of HPA as outlined in the 2025 HPA
Scoping Study.
The testwork program aims to:
• Scale-up and optimise the continuous flowsheet process;
• Produce commercial samples of HPA for distribution to potential customers for
evaluation; and,
• Produce by-product materials for further analysis and assessment of their value-add
potential.
Following is a summary of planned pilot HPA testwork activities, with their progress status:
• Commissioning of pilot plant ✓Completed
• HPA testwork program Underway
• Optimisation of pilot plant Underway
• First production of HPA samples Planned in Q3 2026
• Samples available for customer evaluation Planned in 2H 2026
• Generate by-products materials for evaluation
and assessment of value-add potential
In progress
• Prove scalability and support engineering
design of a commercial facility
Inputs used for planned
Prefeasibility Study (PFS)
5
Refer ADN ASX dated 1 May 2025 titled Andromeda Achieves HPA Breakthrough: Successful Production of 4N HPA &
Validation of Novel Flow Sheet.
6
Refer ADN ASX dated 18 September 2025 titled HPA Scoping Study demonstrates market-leading economics of Andromeda’s
innovative technology; all material assumptions and technical parameters underpinning the estimates and forecast financial
information continue to apply and have not materially changed.
Sarah Clarke, Andromeda’s Acting CEO said:
“Commissioning of the HPA pilot plant is a key milestone for Andromeda’s critical minerals High
Purity Alumina project.
“Under the program of testwork and optimisation, our focus is now on advancing product
development, producing commercial HPA samples for customer evaluation while also assessing by-
product materials for their potential to add further incremental value.”
This announcement has been approved for release by the Board of Andromeda Metals Limited.
For more information about the Company and its projects, please visit our website at
www.andromet.com.au or contact:
Manager, Investor Relations & Corporate Affairs
Patrick Sinclair
T: 08 7089 9819
M: 0403 708 431
E: Patrick.Sinclair@andromet.com.au
FORWARD-LOOKING STATEMENTS
This document contains or may contain certain forward-looking statements and comments about future
events, that are based on Andromeda's beliefs, assumptions and expectations and on information currently
available to management as at the date of this document. Often, but not always, forward-looking statements
can generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes",
"estimate", "anticipate", "outlook", and "guidance", or similar expressions. Such statements are only
expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values,
results or performance achievements to differ materially from those expressed or implied in this presentation.
Where Andromeda expresses or implies an expectation or belief as to future events or results, such expectation
or belief is expressed in good faith and on a reasonable basis. No representation or warranty, express or
implied, is made by Andromeda that the matters stated in this presentation will in fact be achieved or prove
to be correct. Except as required by law, Andromeda undertakes no obligation to provide any additional or
updated information or update any forward-looking statements, whether on a result of new information, future
events, results or otherwise. Readers are cautioned against placing undue reliance on forward-looking
statements. These forward-looking statements are not guarantees of future performance and involve known
and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the
control of Andromeda, the directors, and management of Andromeda.