Disclaimers and Important Information
This presentation contains summary information about Andromeda, and its activities current only at the date of this presentation.
This presentation is for information purposes only. The information in the presentation is of a general nature only and does not
purport to be complete. This presentation should be read in conjunction with Andromeda’s most recent financial report and
other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (ASX) which are
available at www.asx.com.au and also available on Andromeda’s website at www.andromet.com.au.
No investment or financial product advice
The information contained in this presentation does not constitute investment advice or financial product advice (nor taxation or
legal advice) and is not intended to be used as the basis for making an investment decision or as a recommendation to acquire
securities in Andromeda. The information contained in this presentation should not be relied upon as a recommendation or
forecast by Andromeda (including as to the performance of Andromeda or its share price). Readers should obtain their own
professional advice and carry out their own independent investigations and assessment of the information in this presentation
(including any assumptions) before acting.
This presentation has been prepared without taking into account any particular person’s objectives, financial situation or needs;
does not purport to identify the nature of specific market or other risks associated with any investment in the Company and does
not constitute any legal, taxation, investment or accounting advice. An investment in Andromeda's securities is subject to
investment and other known and unknown risks, some of which are beyond the control of Andromeda, including loss of income
and principal invested. The Company does not guarantee any particular rate of return or the performance of the Company nor
does it guarantee any particular tax treatment. Any investment decision should be based only on a person's own due diligence,
inquiry, assessment and professional advice.
Forward-looking statements
This presentation contains or may contain certain forward-looking statements and comments about future events, that are
based on Andromeda's beliefs, assumptions and expectations and on information currently available to management as at the
date of this presentation.
Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may",
"will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production
and production potential, financial forecasts, product quality estimates of future Mineral Resources and Ore Reserves.
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual
values, results or performance achievements to differ materially from those expressed or implied in this presentation. Where
Andromeda expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in
good faith and on a reasonable basis. No representation or warranty, express or implied, is made by Andromeda that the
matters stated in this presentation will in fact be achieved or prove to be correct. Except as required by law, Andromeda
undertakes no obligation to provide any additional or updated information or update any forward-looking statements, whether
on a result of new information, future events, results or otherwise.
Readers are cautioned against placing undue reliance on forward-looking statements. These forward-looking statements are
not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important
factors, many of which are beyond the control of Andromeda, the directors, and management of Andromeda. These factors
include, but are not limited to difficulties in forecasting expected production quantities, the potential that any of Andromeda’s
projects may experience technical, geological, metallurgical and mechanical problems, changes in market prices and other
risks not anticipated by Andromeda, changes in exchange rate assumptions, changes in product pricing assumptions, major
changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously underestimated
technical challenges, increased costs, and demand for production inputs.
Not an offer
This presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or
any other offering document under Australian law or the law of any other jurisdiction. The information does not and will not
constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of
securities in any jurisdiction. The distribution of this presentation in jurisdictions outside Australia may be restricted by law and you
should observe any such restrictions.
No warranty
While care has been taken in preparing the information in this presentation, no representation or warranty, express or implied, is
made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained
in this presentation. The information in this presentation has been obtained from or based on sources believed by Andromeda to
be reliable. This includes references to test results and reports completed by external parties.
Information in this presentation which is attributed to, or derived from, a third-party source has not been independently checked or
verified by Andromeda. No representation or warranty is made as to the accuracy, completeness or reliability of such information. This
includes information relating to market data for kaolin or HPA, including forecast pricing, forecast supply and demand and market
segments and end markets.
To the maximum extent permitted by law, neither Andromeda nor its related corporations, Directors, officers, employees, advisers or
agents, nor any other person, accepts any liability, including, without limitation, any liability arising from the use of this presentation or its
contents or otherwise arising in connection with them, nor guarantees or makes any representations or warranties, express or implied, as
to or takes responsibility for, the currency, accuracy, reliability, completeness or fairness of this presentation nor the information, opinions
and conclusions contained in this presentation.
Assumptions and Notes for Financial Information on 2023 DFS and Stage 1A+ in this presentation:
Further details on the 2023 DFS and the assumptions and notes for the 2023 DFS (and risk factors applicable to the Company)can be
found in the Company’s ASX Announcement ‘2023 Definitive Feasibility Study Results’ released on 24 August 2023. This should be read
together with ASX Announcement dated 6 May 2024 “Andromeda expansion plans for The Great White Project” and “Clarification of
expansion plans for The Great White Project” and the ore reserve estimate previously announced to ASX on 6 April 2022, "Great White
Kaolin Project –Definitive Feasibility Study and Updated Ore Reserve".
Andromeda confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the estimates and financial
information continue to apply and have not materially changed.
Assumptions and Notes for Financial Information on the HPA Scoping Study in this presentation:
Further details on the HPA Scoping Study and the material assumptions, modifying factors and Cautionary Statement for the HPA
Scoping Study (and risk factors applicable to the HPA Project) can be found in the Company’s ASX Announcement ‘Results of HPA
Scoping Study’ released on 18 September 2025.
Andromeda confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the estimates and financial
information continue to apply and have not materially changed.
Currency
Unless otherwise stated, all cashflows in this presentation are in Australian dollars, are undiscounted and are in real terms (not subject to
inflation/escalation factors).
Mineral Resources and Ore Reserve Estimates
Information that relates to Ore Reserve Estimate has been previously announced to ASX on 6 April 2022, "Great White Kaolin Project –
Definitive Feasibility Study and Updated Ore Reserve. Andromeda confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Andromeda confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
Competent Person's Statements
The data in the HPA Scoping Study that relates to Ore Reserve Estimates for the Great White Deposit is based on, and fairly represent,
information and supporting documentation fully reviewed and understood by Mr Joseph Ranford who is a Fellow of the Australasian
Institute of Mining and Metallurgy (FAusIMM). Mr Ranford approves the Ore Reserve Estimates for the Great White Deposit. Mr Ranford is
the Chief Operating Officer of Andromeda Metal Limited and has sufficient experience relevant to the style of mineralisation and type
of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr
Ranford consents to the information contained in this report being used in the form and context in which it appears. Mr Ranford holds
Shares and Performance Rights in the Company and is entitled to participate in Andromeda’s employee incentive plan.
Section A:
Executive Summary
3
Andromeda Metals
Australia’s next leading industrial & critical minerals company
Who is Andromeda?
• Andromeda Metals (Andromeda, the Company) is an ASX-listed (ADN) pre-development industrial and critical minerals company
• The Company is progressing two high-value projects
1
Development-ready: The Great White Project
2
Scoping Study3: High Purity Alumina
• High-grade kaolin asset delivering premium ceramic kaolin
• Scoping Study demonstrates market-leading economics of
• A$763M post-tax NPV8; 43% IRR; A$140M p.a. average EBITDA
• 3-stage development in line with expected offtake growth1
• De-risked and ready to develop:
• HPA Processing Facility capable of producing 10,000 tpa
products over a 28-year mine life
o All key permits in place for construction to commence2;
o Feasibility studies completed; and
o Major offtakes finalised for the first stage of production.
• Credit approval received from Merricks Capital for a A$75m
debt facility supporting the initial stage of development.
producing 4N HPA using Andromeda’s innovative technology.
production of 4N+ HPA using ~30,000 tpa of GWP kaolin as
feedstock.
• Developed based on Andromeda’s novel process flowsheet
for producing HPA from kaolin.
• Potential Net Present Value (NPV10) of approximately A$1.01
billion (post-tax) and 69% IRR.
• Capital intensity and operating costs significantly below other
globally reported processes.
Notes (1) Refer to ADN ASX dated 6 May 2024 titled Andromeda expansion plans for The Great White Project. (2) Mining Lease 6532 and Miscellaneous Purpose Lease 164 granted for a period of 35 years on 17 December 2021, by the South
Australian Minister for Energy and Mining. Program for Environment Protection and Rehabilitation (PEPR) was approved on 01 March 2023, by South Australia’s Department for Energy and Mining. (3) Refer to ADN ASX dated 18 Sept 2025 titled Results
of HPA Scoping Study; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
4
Corporate overview
Experienced Board & executive team to execute Andromeda’s strategy
Andromeda Metals Limited (ASX:ADN)
Board of Directors
$0.030
$0.025
$0.020
$0.015
$0.010
Sue-Ann Higgins
Executive Chair
$0.005
Mick Wilkes
Independent NonExecutive Director
Jean-Dominique Sorel
Non-Executive
Director
Miguel Galindo
Non-Executive
Director
Executive Management
$0.000
Share and Cash Information
Shares on Issue
Share Price1
3.817 billion
A$0.020
Market capitalisation1
Cash-on-Hand2
A$76.3 million
A$7.14 million
Notes (1) As at 22 September 2025. (2) As at 30 June 2025.
Sarah Clarke
Acting CEO, General
Counsel & Company
Secretary
Pascal Alexander-Bossy
Chief Financial Officer
Joe Ranford
Chief Operating
Officer
Led by a highly experienced board and management team, including members who have funded,
built, and delivered successful projects, as well as those with significant expertise in the sales and
marketing of metals and industrial minerals.
5
Section B:
The Great White
Project
6
The Great White Project
De-risked and construction-ready
Tier 1 asset in a low-risk mining jurisdiction
De-risked and with all key permits required to commence construction
100% of planned production capacity for Stage 1A+ committed under binding offtake contracts
Mining Approvals
Feasibility Studies
Design & Build
Execution
Mining Lease
(ML6532) granted
Dec 2021 for 35
years
Definitive Feasibility
Study completed in
August 2023
Stage 1A+ design
complete
Experienced
project team in
place
Environmental Plan
(PEPR) approved
March 2023
EPA Works
Approval granted
Bankable Feasibility
Study completed in
March 2024
Independent
technical review
conducted
All Long Lead Items
ordered, with most
built and ready for
shipment
Preparations made
for ordering of
‘balance of plant’
items
Engineering service
provider
Execution Plan
ready for
implementation
Stage 1A+ Funding
Project funding process
is advanced
Credit Approved for a A
$75M debt facility with
Merricks Capital
Process underway to
secure balance of
funding
In advanced discussions
with a select number of
capital providers
In
Progress
7
Preparations ahead of planned construction
Freehold land purchased
Drum washer built
Thickener built
Centrifuge purchased
Fluid bed dryer built
Stage 1A Filter press built
Cake feeder designed
Engineering design
8
The Great White Project
Staged Delivery of a High-Value Project
3-Stage Development with Robust Economics (NPV 8, real post-tax)1
High-grade 15.1Mt reserve supporting
28-year mine life
Simple mining with low strip ratio
All key approvals received to
commence deveoplment1
Feasibility studies completed
Low capex hurdle
Staged development in-line with
anticipated growth in market demand
Cumulative LOM NPV/IRR >>>
Characteristics
A$763m
43% p.a.
From Stage 2, Project will generate A$140m
annual EBITDA for 22 years
Stage 2 ≅ 120,000 wmt pa
Capex
A$53m
NPV(8)*
A$235m
IRR
56% p.a.
Stage 1B ≅ 110,000 wmt pa
A$569m
39% p.a.
Capex
A$57m
NPV(8)*
A$387m
IRR
65% p.a.
Stage 1A+ ≅ 100,000 wmt pa
A$211m
26% p.a.
Capex
A$84m
NPV(8)*
A$211m
IRR*
26% p.a.
* Stage returns represent standalone investment decisions at each Stage FID
Cumulative capex
A$ 84m
A$141m
A$194m
Cumulative capacity
100,000 wmt pa
210,000 wmt pa
330,000 wmt pa
First production
(from Stage 1A+ FID)
12 mths Stage 1A (55ktpa)
15 mths Stage 1A+ (100ktpa)
24 mths
42 mths
Notes (1) Mining Lease 6532 and Miscellaneous Purpose Lease 164 granted for a period of 35 years on 17 December 2021, by the South Australian Minister for Energy and Mining. Program for Environment Protection and Rehabilitation (PEPR) was
approved on 01 March 2023, by South Australia’s Department for Energy and Mining. (2) Ore Reserve Estimate previously announced to ASX on 6 April 2022 titled Great White Kaolin Project – Definitive Feasibility Study and Updated Ore Reserve.
15.1 Mt Ore Reserve includes 5.1 Mt classed as Proven and 10.0 Mt as Probable; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
9
Stage 1A+ supported by binding offtakes
Agreements for Andromeda’s premium ceramic kaolin
Binding Offtake Agreements support Stage 1A+ production capacity5
Wet metric tonnes per annum
100,000
90,000
Ongoing contracted volumes>>
Stage 1A+ cumulative nominal
production capacity
Overview of Offtakers
Offtaker
Market
Europe
Southeast Asia
Physical commodity trader focused on industrial
minerals
Operations covering 20 offices worldwide, with
annual turnover >USD 10bn
Engaged in sourcing, trading, marketing and
distributing non-ferrous metals, ferro-alloys,
minerals, industrial raw materials and energy
Europe
Founded in 2013 to supply the raw materials
needed by the ceramics industry in Spain.
Offers multiple mineral solutions to the ceramics
sector throughout Europe, Middle East and Africa
(EMEA) region.
Distribution hub located in the Port of Castellon,
handles volumes exceeding 350,000 tonnes per
annum of kaolin, ball clay, feldspar and other raw
materials.
Japan
Multi-generational Japanese ceramics company
Manufactures and sells >200 different high-quality
porcelain tableware products, throughout Japan
where reputation is crucial to success
Also exports products
China
China-based ceramics company
Specializes in advanced production ceramics
mineral processing equipment, including kaolin
Extensively involved in the kaolin industry since its
foundation
80,000
70,000
60,000
50,000
40,000
30,000
20,000
10,000
0
Year 1
Plantan Yamada 1
Year 2
Foshan Gaoming 2
Year 3
IberoClays 3
Traxys 4
Company and end uses
Notes (1) Refer ADN ASX dated 8 June 2023 titled Binding Offtake Agreement signed for Japanese market. (2) Refer ADN ASX dated 18 October 2023 titled Binding Offtake Agreement signed for Chinese market, adjusted per Seller’s volume
option for Year 3. (3) Refer ADN ASX dated 19 January 2024 titled Binding Sales and Distribution Agreement Signed with IberoClays. (4) Refer ADN ASX dated 17 July 2024 titled Binding Offtake Agreement signed with Traxys. (5) Volumes exclude
contracted volumes for Great White HRMTM .
10
Stage 1A+ Funding
Moving towards FID
Credit approval received from Merricks Capital for A$75 million debt facility to support the development of the
Great White Project1
• Merricks Capital is a leading Australian alternatives investment manager and hard-asset investment
specialist that has managed over A$8 billion in assets under management.
• Credit approval for the Facility follows a period of extensive due diligence conducted by Merricks on the
technical, financial, legal, market, environment and social aspects of the Project.
Progressing balance of funding2
• Funding process to secure the balance of funding to Merricks’ A$75m for Stage 1A+.
• Discussions continuing with a select number of capital providers, including opportunities for alternative equity structures.
• A$90 million is required for total Project capital expenditure and working capital:
• A$84 million capital expenditure for Stage 1A+, less any capital expenditure already incurred prior to FID; and
• Working capital expected during the planned development period.
• Financing and cash reserving costs will be additional to the $90m and include:
• Capitalised interest during development;
• Cash reserving (Debt Service Reserve Account and Cost Overrun); and
• Upfront fees for equity and debt.
Notes (1) Refer ADN ASX dated 4 June 2025 titled Credit Approved A$75 million Debt Facility (2) Refer ADN ASX dated 29 April 2025 titled Quarterly Activities/Appendix 5B Cash Flow Report
11
The Kaolin Market
Globally important industrial mineral with attractive market characteristics
De-Commoditised Market
What is Kaolin?
Positive Supply-Demand Dynamics
• Demand growth > global GDP
• White industrial clay utilised as a
filler, additive and pigment in a
broad variety of industries
including ceramics, paper,
paint, fibreglass and rubber.
• Large global market: +30Mtpa,
+US$4bn3.
• Not a commodity market – product market with
large quality and price differentials
• Highest growth segment in Andromeda’s targeted
ceramics segment (+6.4% CAGR)4
• Once a product has an established customer
base, demand and price growth is consistent –
as demonstrated by US historical Kaolin and Ball
Clay PPI (world’s largest exporter of high- quality
kaolins)
• Depletion of high-quality sources of supply affecting
all major production regions (Europe, China, USA)
Global GDP vs kaolin demand – index value2
US Kaolin & Ball Clay Producer Price Index vs Median CPI1
Index value Dec 1999 = 100
250
• Ukraine (historically a leading source of high-quality
product to Italy and Spain ) supply disruption
expected to endure for ~5 years from cessation of
hostilities
Index value 2022 = 100
130
225
125
200
120
175
115
150
110
125
105
100
100
US Kaolin & Ball Producer Price Index
US Median CPI
1. Federal Reserve of St Louis, 2. IMF and Grandview 3. Fortune Business Insights, "Kaolin Global Market Analysis, Insights and Forecast, 2024
2032" (2024) 4. TZMI HQ Kaolin Market Study Update 2025
GDP, constant prices (market exchange rates) (IMF, 2023)
Global demand: kaolin for ceramics (Grandview 2023)
Global demand: kaolin all sectors Grandview 2023)
12
Andromeda’s Kaolin Products
High quality kaolin products for premium ceramics
for use in ceramic formulations
Validated premium ceramic kaolins
Ceramic Product: Great White CRM
Glazes, Frits & Engobes*
T
A refined high-quality product for the high-end
ceramic tile and porcelain slab market
o High alumina (min. of 36.5%) and low iron (max
0.55%)
•
application opportunities for use in
engobe
•
Opportunity for use in production of
frits (glass used for purity)
*subject to further test work
o High whiteness with min powder ISO B 83%
P
A refined high-quality product for the high-end
porcelain tableware market
o High alumina (min. of 35%) and low iron (max
0.6%)
o High whiteness and translucency/min powder
ISO B 82%
White & super-white porcelain tiles
Tile Body Layers
Ceramic Product: Great White CRM
to deliver premium products
Tile Body
•
High value in use of Andromeda
products to upgrade lower-value
kaolins in the tile body layer
•
Premium pricing achieved as a
blending product
Porcelain slabs
Concentrate Product: Great White KCM 90
A semi-refined high-quality kaolin for direct use,
further refinement or upgrade of inferior kaolins
o High alumina (min. of 35%) and low iron (max
0.7%)
High-end porcelain tableware
13
Section C:
High Purity Alumina
14
Andromeda High Purity Alumina
Market-leading economics in a growing critical mineral market
Scoping
Study
Delivered1
Path to commercialisation
HPA Processing Facility capable of producing 10ktpa using ~28ktpa of GWP kaolin feedstock
HPA from GWP kaolin
Attractive Economics
MarketLeading
Economics1
Justifies the commercialisation of Andromeda’s innovative HPA production technology capable
of producing HPA from kaolin to 99.9985% purity (4N+)
Low Capex
Kaolin from the GWP is ideally suited to producing HPA, being high grade and having low levels of
impurities
NPV(10) of $1.01 billion (post-tax)
IRR of 69% (post-tax)
Pre-production capex of ~$155 million (inclusive of 30% contingency)
Market-leading capital intensity, significantly below other reported processes.
Operating costs of ~$4,718 (US$3,020) per tonne:
Low Opex
Significantly below other globally reported processes;
Excludes any benefits from potential sales of by-products.
Critical
Mineral
Demand
Critical Mineral
HPA is classified as a Critical Mineral in Australia, the USA and Europe2.
Rapidly Growing Market
20% compound annual growth rate (CAGR) in demand for 4N+ HPA3
Large Forecast Deficit
Estimated supply shortfall of up to 78,071 tonnes in 2030, equivalent to 127% of current available
global production capacity3.
Notes (1) Refer to ADN ASX dated 18 Sept 2025 titled Results of HPA Scoping Study; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
(2) HPA is included on the Australian Government’s, the United States and the European Union Critical Minerals Lists: https://www.industry.gov.au/publications/australias-critical-minerals-list-and-strategic-materials-list,
https://www.usgs.gov/news/nationalnews-release/us-geological-survey-releases-2022-list-critical-minerals, https://single-market-economy.ec.europa.eu/sectors/raw-materials/areas-specific-interest/critical-rawmaterials_en
(3) High Purity Alumina Special Report 2023, CRU .
15
Scoping Study Results
Potential to become a leading global producer of low-cost, low-carbon HPA
Scoping Study Outcomes1
Target Production
AUD
10,000 tpa
NPV10 (pre-tax)
$1,480 million
NPV10 (post-tax)2
$1,010 million
IRR
Revenue
US$947 million
Capital Intensity USD/t9 of Andromeda Peers
70,000
60,000
50,000
US$647 million
88% (pre-tax) 69% (post tax)
$6,403 million
US$4,098 million
HPA Product Sale Price3
US$4,098 million
US$20,000 / t
Cash Operating Cost4
$4,718 / t
US$3,020 / t
Cash Operating Margin (%)
85%
40,000
30,000
20,000
10,000
0
Andromeda
Impact
Minerals
KRR Ltd
Cadoux
$247 million
US$158 million
Pre-production Capital Cost5
$155 million
US$99 million
24 years
Corella
Pure
Alumina
Alpha HPA
Altech
Chemicals
Costs of Production USD/kg
$20.00
$18.62
$16.05
$15.99
$15.00
Average Annual EBITDA
Project Life6
Market-Leading Economics7,8
USD
$15.25
$10.00
$7.00
$5.00
$-
$3.02
Europe
Japan
USA
China
Andromeda Andromeda
Peers
HPA
Notes (1) Refer to ADN ASX dated 18 Sept 2025 titled Results of HPA Scoping Study ; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not
materially changed. (2) Assumes company tax rate of 30% (3) Based HPA market analysis, which may not reflect actual offtake agreements entered into. (4) Excludes potential sales of silicate by-products. (5) Includes ~30%
contingency, excludes additional costs for PFS, marketing and other studies including ongoing test work, currently estimated to take approximately 2 years (subject to available funding) and cost approximately $4 million. (6)
Nominal Project Life of 24-years modelled, including approximately 2 years of design and construction for a HPA Production Facility with a 22-year production life. (7) High Purity Alumina Special Report 2023, CRU (8) High Purity
Alumina Market Assessment, FutureBridge (commissioned by Andromeda), August 2025 (9) Pre-production capital cost per tonne of annual production capacity
16
Innovative Technology
Scoping Study demonstrates market-leading economics
• Novel flowsheet (lab-scale) produced 4N+ HPA using high-quality refined kaolin from the Great White Project (GWP)1.
• The Scoping Study justifies the flowsheet commercialisation2, with costs forecast to be significantly less than global peers, with a lower
carbon footprint. These results are driven by:
The use of established and proven commercial metallurgical units
Lowers scale-up risk
Using GWP high purity kaolin as a feedstock with low impurity levels
Reduces process complexity and cost
No use of acid at high temperatures and high pressures
Unsafe and costly
High calcination temperature not required to remove chlorides
Lower energy costs and increased product flexibility
Andromeda’s
Great White
refined kaolin
product
Proven process
with recovered
hydrochloric acid
(HCl)
Andromeda’s
novel process
Calcination
of HPA
South Australia’s
low-carbon HPA
opportunity
Note (1) Refer ADN ASX announcement dated1 May 2025 titled Andromeda Achieves HPA Breakthrough: Successful Production of 4N HPA & Validation of Novel Flow Sheet . (2) Refer to ADN ASX dated 18 Sept 2025 titled
Results of HPA Scoping Study; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
17
4N+ HPA Market
Rapidly growing demand for a critical mineral
Favourable Supply-Demand Forecast…1
…Driving Increase in Forecast Prices for 4N+ HPA1,2
• No benchmark pricing. Akin to kaolin, pricing is determined on the
• Market demand for HPA is driven by growth in LEDs, lithium-ion
value of a given HPA product for a particular end-use application.
battery coatings, micro-LEDs and synthetic sapphire glass.
• Forecast ranges for nominal prices can therefore be wide.
• CRU forecast total 4N+ HPA demand in 2024 of 46,463 tonnes,
reaching 139,731 tonnes in 2030, representing a CAGR of 20.1%.
• Based on CRU forecasts for 4N+ HPA, a supply shortfall of 7.6kt is
expected to develop in 2028, growing to a supply shortfall of 78kt in
Share your feedback