Acting CEO Presentation at AGM
Released
Released
Announcement PDF
Andromeda
Acting CEO Presentation
Annual General Meeting
20 November 2025
ASX:ADN
andromet.com.au
Level 10, 431 King William Street, Adelaide, South Australia 5000
+61 8 7089 9800
Authorised for release by the Board of Andromeda Metals Ltd
Disclaimers and Important Information
This presentation contains summary information about Andromeda, and its activities current only at the date of this presentation.
This presentation is for information purposes only. The information in the presentation is of a general nature only and does not
purport to be complete. This presentation should be read in conjunction with Andromeda’s most recent financial report and
other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (ASX) which are
available at www.asx.com.au and also available on Andromeda’s website at www.andromet.com.au.
No investment or financial product advice
The information contained in this presentation does not constitute investment advice or financial product advice (nor taxation or
legal advice) and is not intended to be used as the basis for making an investment decision or as a recommendation to acquire
securities in Andromeda. The information contained in this presentation should not be relied upon as a recommendation or
forecast by Andromeda (including as to the performance of Andromeda or its share price). Readers should obtain their own
professional advice and carry out their own independent investigations and assessment of the information in this presentation
(including any assumptions) before acting.
This presentation has been prepared without taking into account any particular person’s objectives, financial situation or needs;
does not purport to identify the nature of specific market or other risks associated with any investment in the Company and does
not constitute any legal, taxation, investment or accounting advice. An investment in Andromeda's securities is subject to
investment and other known and unknown risks, some of which are beyond the control of Andromeda, including loss of income
and principal invested. The Company does not guarantee any particular rate of return or the performance of the Company nor
does it guarantee any particular tax treatment. Any investment decision should be based only on a person's own due diligence,
inquiry, assessment and professional advice.
Forward-looking statements
This presentation contains or may contain certain forward-looking statements and comments about future events, that are
based on Andromeda's beliefs, assumptions and expectations and on information currently available to management as at the
date of this presentation.
Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may",
"will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production
and production potential, financial forecasts, product quality estimates of future Mineral Resources and Ore Reserves.
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual
values, results or performance achievements to differ materially from those expressed or implied in this presentation. Where
Andromeda expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in
good faith and on a reasonable basis. No representation or warranty, express or implied, is made by Andromeda that the
matters stated in this presentation will in fact be achieved or prove to be correct. Except as required by law, Andromeda
undertakes no obligation to provide any additional or updated information or update any forward-looking statements, whether
on a result of new information, future events, results or otherwise.
Readers are cautioned against placing undue reliance on forward-looking statements. These forward-looking statements are
not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important
factors, many of which are beyond the control of Andromeda, the directors, and management of Andromeda. These factors
include, but are not limited to difficulties in forecasting expected production quantities, the potential that any of Andromeda’s
projects may experience technical, geological, metallurgical and mechanical problems, changes in market prices and other
risks not anticipated by Andromeda, changes in exchange rate assumptions, changes in product pricing assumptions, major
changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously underestimated
technical challenges, increased costs, and demand for production inputs.
Not an offer
This presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or
any other offering document under Australian law or the law of any other jurisdiction. The information does not and will not
constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of
securities in any jurisdiction. The distribution of this presentation in jurisdictions outside Australia may be restricted by law and you
should observe any such restrictions.
No warranty
While care has been taken in preparing the information in this presentation, no representation or warranty, express or implied, is
made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained
in this presentation. The information in this presentation has been obtained from or based on sources believed by Andromeda to
be reliable. This includes references to test results and reports completed by external parties.
Information in this presentation which is attributed to, or derived from, a third-party source has not been independently checked or
verified by Andromeda. No representation or warranty is made as to the accuracy, completeness or reliability of such information. This
includes information relating to market data for kaolin or HPA, including forecast pricing, forecast supply and demand and market
segments and end markets.
To the maximum extent permitted by law, neither Andromeda nor its related corporations, Directors, officers, employees, advisers or
agents, nor any other person, accepts any liability, including, without limitation, any liability arising from the use of this presentation or its
contents or otherwise arising in connection with them, nor guarantees or makes any representations or warranties, express or implied, as
to or takes responsibility for, the currency, accuracy, reliability, completeness or fairness of this presentation nor the information, opinions
and conclusions contained in this presentation.
Assumptions and Notes for Financial Information on 2023 DFS and Stage 1A+ in this presentation:
Further details on the 2023 DFS and the assumptions and notes for the 2023 DFS (and risk factors applicable to the Company)can be
found in the Company’s ASX Announcement ‘2023 Definitive Feasibility Study Results’ released on 24 August 2023. This should be read
together with ASX Announcement dated 6 May 2024 “Andromeda expansion plans for The Great White Project” and “Clarification of
expansion plans for The Great White Project” and the ore reserve estimate previously announced to ASX on 6 April 2022, "Great White
Kaolin Project –Definitive Feasibility Study and Updated Ore Reserve".
Andromeda confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the estimates and financial
information continue to apply and have not materially changed.
Assumptions and Notes for Financial Information on the HPA Scoping Study in this presentation:
Further details on the HPA Scoping Study and the material assumptions, modifying factors and Cautionary Statement for the HPA
Scoping Study (and risk factors applicable to the HPA Project) can be found in the Company’s ASX Announcement ‘Results of HPA
Scoping Study’ released on 18 September 2025.
Andromeda confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the estimates and financial
information continue to apply and have not materially changed.
Currency
Unless otherwise stated, all cashflows in this presentation are in Australian dollars, are undiscounted and are in real terms (not subject to
inflation/escalation factors).
Mineral Resources and Ore Reserve Estimates
Information that relates to Ore Reserve Estimate has been previously announced to ASX on 6 April 2022, "Great White Kaolin Project –
Definitive Feasibility Study and Updated Ore Reserve. Andromeda confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Andromeda confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
Competent Person's Statements
The data in the HPA Scoping Study that relates to Ore Reserve Estimates for the Great White Deposit is based on, and fairly represent,
information and supporting documentation fully reviewed and understood by Mr Joseph Ranford who is a Fellow of the Australasian
Institute of Mining and Metallurgy (FAusIMM). Mr Ranford approves the Ore Reserve Estimates for the Great White Deposit. Mr Ranford is
the Chief Operating Officer of Andromeda Metal Limited and has sufficient experience relevant to the style of mineralisation and type
of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr
Ranford consents to the information contained in this report being used in the form and context in which it appears. Mr Ranford holds
Shares and Performance Rights in the Company and is entitled to participate in Andromeda’s employee incentive plan.
2
Australia’s next leading industrial & critical minerals company
3
Andromeda Metals
Notes (1) Refer to ADN ASX dated 6 May 2024 titled Andromeda expansion plans for The Great White Project. (2) Mining Lease 6532 and Miscellaneous Purpose Lease 164 granted for a period of 35 years on 17 December 2021, by the South
Australian Minister for Energy and Mining. Program for Environment Protection and Rehabilitation (PEPR) was approved on 01 March 2023, by South Australia’s Department for Energy and Mining. (3) Refer to ADN ASX dated 18 Sept 2025 titled Results
of HPA Scoping Study; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed. (4) Refer to ADN ASX dated 7 October 2025 titled HPA
Project – Next phase of commercialisation underway.
• High-grade kaolin project delivering premium ceramic kaolin
products over a 28-year mine life.
• A$763M post-tax NPV8; 43% IRR; A$140M p.a. average EBITDA.
• 3-stage development in-line with expected offtake growth.1
• De-risked and ready to develop:
o All key permits in place for construction to commence.2
o Feasibility studies completed.
o Major offtakes finalised for the first stage of production.
• Credit approved for a A$75 million debt facility with Merricks
Capital supporting the initial stage of development.
• Progressing discussions with a cornerstone investor for an
investment at the asset level for both the GWP and HPA Project.
Progressing with Early Works while advancing towards FID
Development-ready: The Great White Project
• Scoping Study demonstrates market-leading economics of
producing 4N HPA using Andromeda’s innovative technology.
• HPA Processing Facility capable of producing 10,000 tpa
production of 4N+ HPA using ~30,000 tpa of GWP kaolin as
feedstock.
• Developed based on Andromeda’s novel process flowsheet
for producing HPA from kaolin.
• Potential Net Present Value (NPV10) of ~A$1.01 billion (post-
tax) with an IRR of 69%.
• Capital intensity and operating costs significantly below other
globally reported processes.
• Initiated pilot scale test work4 to optimise innovative flowsheet
for continuous HPA production and samples for evaluation by
potential customers.
Scoping Study3: High Purity Alumina
1 2
The Great White Project
4
Kaolin Ore Refined Kaolin High-value end use markets
5
Large, De-commoditised Market
• Large global market: +30Mtpa, +US$4bn3.
• Not a commodity market – product market with
large quality and price differentials
• Once a product has an established customer base,
demand and price growth is consistent – as
demonstrated by US historical Kaolin and Ball Clay
PPI (world’s largest exporter of high- quality kaolins)
Positive Supply-Demand Dynamics
• Demand growth > global GDP
• Highest growth segment in Andromeda’s targeted
ceramics segment (+6.4% CAGR)4
• Long-term supply constraints driven by depletion of
high-quality sources in all major production regions
• War in Ukraine supply disruption expected to endure
for 5-10 years, historically a leading source of high-
quality product to Italy and Spain
1. Federal Reserve of St Louis, 2. IMF and Grandview 3. Fortune Business Insights, "Kaolin Global Market Analysis, Insights and
Forecast, 2024 2032" (2024) 4. TZMI HQ Kaolin Market Study Update 2025
Global GDP vs kaolin demand – index value2
100
105
110
115
120
125
130
GDP, constant prices (market exchange rates) (IMF, 2023)
Global demand: kaolin for ceramics (Grandview 2023)
Global demand: kaolin all sectors Grandview 2023)
Index value 2022 = 100
US Kaolin & Ball Clay Producer Price Index vs Median CPI1
Index value Dec 1999 = 100
100
125
150
175
200
225
250
US Kaolin & Ball Producer Price Index US Median CPI
Globally important industrial mineral with attractive market characteristics
The Kaolin Market
Notes (1) Refer ADN ASX dated 8 June 2023 titled Binding Offtake Agreement signed for Japanese market. (2) Refer ADN ASX dated 18 October 2023 titled Binding Offtake Agreement signed for Chinese market, adjusted per Seller’s volume
option for Year 3. (3) Refer ADN ASX dated 19 January 2024 titled Binding Sales and Distribution Agreement Signed with IberoClays. (4) Refer ADN ASX dated 17 July 2024 titled Binding Offtake Agreement signed with Traxys. (5) Volumes exclude
contracted volumes for Great White HRMTM .
Stage 1A+ supported by binding offtakes
6
100% of planned production committed under binding offtake contracts
Offtaker Markets
Europe
Southeast Asia
Europe
Japan
Foshan Gaoming
China
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Year 1 Year 2 Year 3
Wet metric tonnes per annum
Plantan Yamada Foshan Gaoming IberoClays Traxys
1 2 3 4
Ongoing contracted volumes>>
Stage 1A+ cumulative nominal
production capacity
Overview of Offtakers
Binding Offtake Agreements support Stage 1A+ production capacity5
The Great White Project
Cumulative
LOM
NPV/IRR
>>>
Staged Delivery of a High-Value Project
A$763m
43% p.a.
A$569m
39% p.a.
A$211m
26% p.a.
Stage 1A+ ≅ 100,000 wmt pa
Stage 1B ≅ 110,000 wmt pa
Capex A$84m
NPV(8)* A$211m
IRR* 26% p.a.
Capex A$57m
NPV(8)* A$387m
IRR 65% p.a.
Capex A$53m
NPV(8)* A$235m
IRR 56% p.a.
Stage 2 ≅ 120,000 wmt pa
High-grade 15.1Mt reserve supporting
28-year mine life
Simple mining with low strip ratio
All key approvals received to
commence deveoplment1
Feasibility studies completed
Low capex hurdle
Staged development in-line with
anticipated growth in market demand
Characteristics 3-Stage Development with Robust Economics (NPV 8, real post-tax)1
* Stage returns represent standalone investment decisions at each Stage FID
Notes (1) Mining Lease 6532 and Miscellaneous Purpose Lease 164 granted for a period of 35 years on 17 December 2021, by the South Australian Minister for Energy and Mining. Program for Environment Protection and Rehabilitation (PEPR) was
approved on 01 March 2023, by South Australia’s Department for Energy and Mining. (2) Ore Reserve Estimate previously announced to ASX on 6 April 2022 titled Great White Kaolin Project – Definitive Feasibility Study and Updated Ore Reserve.
15.1 Mt Ore Reserve includes 5.1 Mt classed as Proven and 10.0 Mt as Probable; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
Cumulative capex
Cumulative capacity
First production
(from Stage 1A+ FID)
A$141m
210,000 wmt pa
24 mths
A$194m
330,000 wmt pa
42 mths
A$ 84m
100,000 wmt pa
12 mths Stage 1A (55ktpa)
15 mths Stage 1A+ (100ktpa)
From Stage 2, Project will generate A$140m
annual EBITDA for 22 years
7
8
Notes (1) Refer ADN ASX dated 4 June 2025 titled Credit Approved A$75 million Debt Facility (2) Refer ADN ASX dated 14 October 2025 titled Progressing balance of funding Great White Project Update.
Progressing with Early Works while advancing towards FID
Stage 1A+ funding
A$90 million required for total Project capital expenditure and working capital:
• A$84 million capital expenditure for Stage 1A+, less capital expenditure already incurred prior to FID; and
• Working capital expected during the planned development period.
Financing and cash reserving costs additional to the A$90 million include:
• Capitalised interest during development;
• Cash reserving (Debt Service Reserve Account and Cost Overrun); and
• Upfront fees for equity and debt.
Credit Approved
A$75 million debt facility
with Merricks Capital1
Merricks Capital is a leading Australian alternatives
investment manager and hard-asset investment
specialist that has managed over A$8 billion in AUM.
Credit approval extensive due diligence being
conducted by Merricks Capital on the technical,
financial, legal, market, environment and social
aspects of the Project.
BALANCE OF FUNDING
Cornerstone Equity Investment
Progressing discussions with a
cornerstone investor for an
investment at the asset level
for both the Great White
Project and the HPA Project.
Finalisation remains subject to
due diligence and agreement
on terms.
Share Placement and SPP
Successfully completed a
Share Placement to
institutional investors raising
$13 million before costs.
Share Purchase Plan to
shareholders raising
additional $996,000 before
costs.
Pre-construction Activities in Progress
Progressing with Early Works while advancing towards FID
9
Currently, in the process of making payments of $4.45 million to satisfy the rehabilitation and
environmental compliance obligations required to commence site works at the Great White Project:
• $3.79 million for lodgement of the rehabilitation bond under the Mining Act 1971 (SA); and,
• $664k to the Native Vegetation Fund to satisfy the Significant Environmental Benefit obligations.
Bond Payments – Being Processed
1
Following bond payments being made:
• Pre-construction early works can commence.
2
• Finalisation of Engineering Detailed Design for the processing plant and supporting infrastructure.
• Transport key long-lead equipment items which are currently fabricated, warehoused overseas
and ready for shipment to Australia.
Other Pre-Construction Activities – Underway
3
Nov Dec Jan Feb
Site preparation
- Onsite survey
- Construction of mine access road
- Bulk earthworks
- Installation of site facilities
Geotechnical Drilling
2025 2026
Early Works Activities – Locking in Dates
Stage 1A+ Processing Plant flyover
An eagle-eye view of what the processing plant will look like
10
14
High Purity Alumina
(HPA)
Market-leading economics in a growing critical mineral market
15
HPA Scoping Study
Market-
Leading
Economics1
Critical
Mineral
Demand
Path to commercialisation
Justifies the commercialisation of Andromeda’s innovative HPA production technology capable
of producing HPA from kaolin to 99.9985% purity (4N+)
HPA from GWP kaolin
HPA Processing Facility capable of producing 10ktpa using ~28ktpa of GWP kaolin feedstock
Kaolin from the GWP is ideally suited to producing HPA, being high grade and having low levels of
impurities
Attractive Economics
NPV(10) of $1.01 billion (post-tax)
IRR of 69% (post-tax)
Low Capex
Pre-production capex of ~$155 million (inclusive of 30% contingency)
Market-leading capital intensity, significantly below other reported processes.
Low Opex
Operating costs of ~$4,718 (US$3,020) per tonne:
Significantly below other globally reported processes;
Excludes any benefits from potential sales of by-products.
Critical Mineral HPA is classified as a Critical Mineral in Australia, the USA and Europe2.
Rapidly Growing Market 20% compound annual growth rate (CAGR) in demand for 4N+ HPA3
Large Forecast Deficit
Estimated supply shortfall of up to 78,071 tonnes in 2030, equivalent to 127% of current available
global production capacity3.
Scoping
Study
Delivered1
Notes (1) Refer to ADN ASX dated 18 Sept 2025 titled Results of HPA Scoping Study; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
(2) HPA is included on the Australian Government’s, the United States and the European Union Critical Minerals Lists: https://www.industry.gov.au/publications/australias-critical-minerals-list-and-strategic-materials-list,
https://www.usgs.gov/news/nationalnews-release/us-geological-survey-releases-2022-list-critical-minerals, https://single-market-economy.ec.europa.eu/sectors/raw-materials/areas-specific-interest/critical-rawmaterials_en
(3) High Purity Alumina Special Report 2023, CRU .
Rapidly growing demand for a critical mineral
4N+ HPA Market
18
Favourable Supply-Demand Forecast…1
• Market demand for HPA is driven by growth in LEDs, lithium-ion
battery coatings, micro-LEDs and synthetic sapphire glass.
• CRU forecast total 4N+ HPA demand in 2024 of 46,463 tonnes,
reaching 139,731 tonnes in 2030, representing a CAGR of 20.1%.
• Based on CRU forecasts for 4N+ HPA, a supply shortfall of 7.6kt is
expected to develop in 2028, growing to a supply shortfall of 78kt in
2030, representing 127% of estimated production.
…Driving Increase in Forecast Prices for 4N+ HPA1,2
• No benchmark pricing. Akin to kaolin, pricing is determined on the
value of a given HPA product for a particular end-use application.
• Forecast ranges for nominal prices can therefore be wide.
o CRU estimates USD20.70/kg price in 2025, rising to USD31.13 in
2030 at an 8.5% CAGR (2025-2030); and,
o FutureBridge estimates USD30.70/kg price in 2025, rising to
USD39.20 in 2030 at a 5.0% CAGR (2025-2030).
• Andromeda has assumed an average price of US$20,000/t for its
Scoping Study.
Notes (1) High Purity Alumina Special Report 2023, CRU (2) High Purity Alumina Market Assessment, FutureBridge
(commissioned by Andromeda), August 2025
0kt
20kt
40kt
60kt
80kt
100kt
120kt
140kt
2022 2023 2024 2025 2026 2027 2028 2029 2030
Reputable 4N supply (capacity) 4N+ HPA demand
Demand
Shortfall
78Kt
(127%)
21.2
31.1
30.0
39.2
USD15
USD20
USD25
USD30
USD35
USD40
2024 2025 2026 2027 2028 2029 2030
Andromeda 4N (0% CAGR) CRU 4N (8.5% CAGR)
FutureBridge 4N (5.0% CAGR)
Potential to become a leading global producer of low-cost, low-carbon HPA
14
Scoping Study Results
AUD USD
Target Production 10,000 tpa
NPV10 (pre-tax) $1,480 million US$947 million
NPV10 (post-tax)1 $1,010 million US$647 million
IRR2 88% (pre-tax) 69% (post tax)
Revenue $6,403 million US$4,098 million
HPA Product Sale Price3 $31,250 / t US$20,000 / t
Cash Operating Cost4 $4,718 / t US$3,020 / t
Cash Operating Margin (%) 85%
Average Annual EBITDA $247 million US$158 million
Pre-production Capital Cost5 $155 million US$99 million
Project Life6 24 years
Notes (1) Refer to ADN ASX dated 18 Sept 2025 titled Results of HPA Scoping Study ; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
(2) Assumes company tax rate of 30% (3) Based HPA market analysis, which may not reflect actual offtake agreements entered into. (4) Excludes potential sales of silicate by-products. (5) Includes ~30% contingency, excludes additional costs for PFS,
marketing and other studies including ongoing test work, currently estimated to take approximately 2 years (subject to available funding) and cost approximately $4 million. (6) Nominal Project Life of 24-years modelled, including approximately 2 years
of design and construction for a HPA Production Facility with a 22-year production life. (7) High Purity Alumina Special Report 2023, CRU (8) High Purity Alumina Market Assessment, FutureBridge (commissioned by Andromeda), August 2025 (9) Pre-
production capital cost per tonne of annual production capacity
Market-Leading Economics
$9,968
$16,060 $17,000
$20,200 $22,600
$33,875
$37,104
$66,133
$0
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
$70,000
Andromeda Impact
Minerals
King River
Resources
Cadoux (FYI
Resources)
Corella Pure Alumina Alpha HPA Altech
Chemicals
Capital Intensity (USD/t)
$3,020
$6,998
$15,251
$15,994 $16,052
$18,623
$-
$2,500
$5,000
$7,500
$10,000
$12,500
$15,000
$17,500
$20,000
Andromeda
HPA
Andromeda
Peers
China USA Japan Europe
HPA Costs of Production (USD/t)
Scoping Study demonstrates market-leading economics
Innovative Technology
17
• Novel flowsheet (lab-scale) produced 4N+ HPA using high-quality refined kaolin from the Great White Project (GWP)1.
• The Scoping Study justifies the flowsheet commercialisation2, with costs forecast to be significantly less than global peers, with a lower
carbon footprint. These results are driven by:
The use of established and proven commercial metallurgical units Lowers scale-up risk
Using GWP high purity kaolin as a feedstock with low impurity levels Reduces process complexity and cost
No use of acid at high temperatures and high pressures Unsafe and costly
High calcination temperature not required to remove chlorides Lower energy costs and increased product flexibility
Andromeda’s
Great White
refined kaolin
product
Proven process
with recovered
hydrochloric acid
(HCl)
Andromeda’s
novel process
Calcination
of HPA
South Australia’s
low-carbon HPA
opportunity
Note (1) Refer ADN ASX announcement dated1 May 2025 titled Andromeda Achieves HPA Breakthrough: Successful Production of 4N HPA & Validation of Novel Flow Sheet . (2) Refer to ADN ASX dated 18 September 2025
titled Results of HPA Scoping Study; all material assumptions and technical parameters underpinning the estimates and forecast financial information continue to apply and have not materially changed.
HPA Project – Next Steps
19
Notes (1) Refer to ADN ASX dated 7 October 2025 titled HPA Project – Next phase of commercialisation underway.
Continuous
pilot scale
testwork
Engagement
with potential
customers
Define target
markets and
products
Pre-Feasibility
Study
Development
Pathway &
Funding
The outcomes of the Scoping Study warrant progressing the HPA Project to the next phase of the workplan.
Next steps, subject to funding and approvals:
1 2 3 4 5
(In Progress)1
Focused on securing
balance of funding to
support an FID.
Finalise A$75 million debt
facility with Merricks Capital.
Progress discussions with
cornerstone investor.
In process of paying
environmental bonds.
Early works to commence
following payment of bonds.
GWP Stage 1A+
Binding offtake for 50% of
future expansion capacity
with Traxys.1
Identifying product and
market opportunities in
high-value segments.
GWP Future Expansion
17
Priorities Going Forward
Pilot scale testwork
underway2, to:
Optimise flowsheet for
continuous production
Produce commercial
HPA samples
Engaging potential
customers
Engaging potential funding
partners, including
Government
HPA Project
Note (1) Up to 130,000 tonnes per annum; refer to ADN ASX dated 17 July 2024 titled Binding Offtake Agreement signed with Traxys. (2) Refer to ADN ASX dated 7 October 2025 titled HPA Project – Next phase of
commercialisation underway.
Andromeda
Annual General Meeting
20 November 2025
ASX:ADN