Quarterly Activity Report – June 2025
Andromeda Metals Limited (ASX: ADN) (Andromeda, the Company) reports the following activities during
the quarter ended 30 June 2025, demonstrating continued progress in advancing the Great White Project
(GWP, the Project) and the project funding process for the initial Stage 1A+ development.
HIGHLIGHTS
PROJECT
• Merricks Capital confirmed credit approval for a debt facility of A$75 million,
FUNDING
including principal, capitalised interest and fees, cash reserving requirements
and a cost overrun tranche.
• Funding process for the balance of Stage 1A+ project funding progressed, with
select number of capital providers undertaking due diligence.
TECHNICAL
• Successful validation of Great White CRM™ as a high-quality kaolin product for
use in industrial glaze formulations, opening up new sales opportunities to the
ceramic industry.
OPERATIONS
• Stage 1A+ detailed plant design and engineering was advanced.
• Significant operational planning and project readiness activities undertaken to
support efficient delivery of Stage 1A+ of the Project.
EXPLORATION
• Drilling conducted at the Chairlift Deposit, with samples sent for analysis to test
for potential extensions and better define the high brightness, low titanium
portions of the deposit.
HPA PROJECT
• Test work results confirmed high purity alumina (HPA) produced to 99.9985%
purity, validating the Company’s novel flowsheet using high-quality refined
kaolin product from the GWP.
CORPORATE
• Share Placement to institutional and sophisticated investors raising ~$5 million,
before costs.
Sarah Clarke, Andromeda’s Acting Chief Executive Officer said:
“The quarter saw significant milestones achieved, with Merricks Capital confirming credit approval for a
$75 million debt facility and efforts to secure the balance of funding required to support a final investment
decision for Stage 1A+ of the Great White Project being progressed.
“Whilst Andromeda’s primary focus remains the development of the Great White Project, the quarter also
saw breakthrough progress with our HPA Project, with our release of test work results producing HPA at
99.9985% purity.
“This outstanding test work both validates our novel flowsheet for the production of HPA and opens up
exciting potential to expand our product portfolio in the future to include globally competitive HPA
products, with the potential to be both more cost and carbon efficient than other reported processes.”
Discussion
Andromeda reports the following activities, undertaken during the quarter ended 30 June 2025.
Project Funding
During the quarter, the Stage 1A+ project funding process was progressed, with Merricks Capital
confirming credit approval for a $75 million debt facility (Facility) to support the Projects’ development.
Credit approval for the Facility followed a period of extensive due diligence conducted by Merricks
Capital on the technical, financial, legal, market, environment and social aspects of the Project.
Key terms of the Facility include1:
•
Amount of $75 million includes principal, capitalised interest and fees, cash reserving requirements
and a cost overrun tranche.
•
Tenor of 78 months, with scheduled amortisation beginning after a 12-month grace period
following the completion of Project development, and ending at maturity with a 50% bullet
repayment.
•
Security and covenant package customary for a facility of this nature, including the Company
securing the necessary balance of funding to support a final investment decision for the Stage 1A+
development of the Project.
Following credit approval being confirmed, Andromeda and Merricks Capital have worked on finalising
the binding financing documentation for the Facility. These documents are now well progressed, with
finalisation and execution subject to finalisation of the balance of funding. Whilst the formal exclusivity
period expires on 31 July 2025, this does not mean documentation must be executed by this date.
In parallel, the Company also progressed its funding process for the balance of Stage 1A+ project funding
required to support a final investment decision, with a select number of capital financiers undertaking
due diligence. This process includes discussions for investment through cornerstone equity and alternative
funding structures, either at the company or project level.
Technical
During the period, commercial scale pilot plant trials using Great White CRM™ in industrial glaze
formulations at an established ceramic frit and glaze producer in Spain, were successfully completed2.
The findings of the trials successfully validate Great White CRM™ as a high-quality kaolin product for use
in industrial glaze formulations, opening up new sales opportunities for Andromeda’s high-quality kaolin
and enhancing Andromeda Metals’ position as a key supplier to the ceramic industry.
The trials assessed the use of Great White CRM™ in two key glaze formulation segments:
•
•
a standard glaze composition to manufacture single-fired wall tiles with a glossy white opaque
finish, with kaolin content of 8.3% by weight; and,
a matt “smaltobbio” glaze composition for the manufacture of porcelain tiles, with a kaolin
content of 22%.
For each glaze formulation, the trials also compared the results to glazes using the industry benchmark
kaolin used by most ceramic glaze companies in Southern Europe.
1
Terms are further outlined in Schedule 1 of ADN ASX dated 4 June 2025 titled Credit Approved A$75 million Debt Facility, and
are subject to confidentiality requirements.
2
Refer ADN ASX date 25 June 2025 titled Successful Commercial Scale Pilot Plant Ceramic Glaze Trials.
Andromeda Metals Limited | 2
Key trial findings, successfully validating Great White CRM™ for use in glaze formulations, were3:
•
•
•
Tests strongly support using Great White CRM™ in the industrial manufacture of ceramic glazes,
providing improvement in key glaze properties, such as adhesion, cohesion, and whiteness;
Enhanced Glaze Properties: The use of Great White CRM™ significantly enhanced the properties
of the glazed tiles. Notably, the adhesion and cohesion of the glaze layer before firing were
improved, ensuring greater stability and reduced risk of defects such as chipping or peeling during
handling; and,
Feasibility for Industrial Scale Production: Great White CRM™ can be successfully used in industrialscale ceramic glaze production, with positive impacts on adhesion, whiteness, and overall tile
performance.
The trials were conducted at an established ceramic frit and glaze producer in Alcora, Spain. Using their
glazing pilot plant, which replicate the industrial equipment and conditions found in typical commercial
tile production facilities, the trials were under the control and monitoring of the Institute of Ceramic
Technology (ITC)4 and overseen by Galesk Consultancy.
During the quarter, the product validation program for the commercialisation of Great White HRM™ was
progressed.
A program of testing samples of Great White HRM™ in overseas markets to assess its suitability across a
range of potential customer applications, was progressed. This includes the following activities during the
quarter:
•
•
•
Japan & Singapore – a testing program across a range of potential customer applications in these
and other Asian markets was progressed, using samples of Great White HRM™ previously sent;
Traxys – following a request by Traxys, a sample was sent to France for assessment in support of
the conditional offtake agreement for Great White HRM™ with Traxys5; and,
IberoClays – a sample was sent to Spain for assessment in support the conditional offtake
agreement for Great White HRM™ with IberoClays6.
Operations
In anticipation of a final investment decision, a significant amount of operational planning and project
readiness activities were carried out during the quarter.
Stage 1A+ detailed plant design and engineering were advanced, and activities supporting procurement
and operational planning were undertaken by the Project team.
As part of project readiness and financing requirements, during the quarter a capital expenditure review
was commenced, in conjunction with refinement of the detailed design and engineering for Stage 1A+,
together with a review of certain operational costs.
In addition, significant engagement activities with financiers, and their advisers, were undertaken in
support of the Stage 1A+ project funding process, as the Company progressed through various funding
due diligence processes.
3
Industrial validation of Andromeda CRM kaolin for ceramic glazes, Galesk Consultancy, May 2025.
Instituto de Tecnología Cerámica (ITC), located at the University Jaime I of Castellón in Spain.
5
Refer ADN ASX dated 17 July 2024 titled Binding Offtake Agreement signed with Traxys.
6
Refer ADN ASX dated 19 January 2024 titled Binding Sales and Distribution Agreement Signed with IberoClays.
4
Andromeda Metals Limited | 3
Figure 1 - Stage 1A+ Detailed Plant Design and Engineering
Figure 2 - Stage 1A+ Detailed Plant Design and Engineering – with mineral refining equipment and hydro-cyclones in foreground.
The procurement of long lead items for Stage 1A was progressed, with current status shown as follows:
•
Fluid bed dryer – factory acceptance testing (FAT) completed, warehoused, ready for shipment;
•
Thickener – FAT completed, warehoused, ready for shipment;
•
Drum washer – FAT completed, warehoused, ready for shipment;
•
Filter Press – FAT process nearing completion, with preparations for storage prior to shipment; and,
•
Filter Cake Feeder – engineering design complete, with fabrication to commence following an
anticipated final investment decision.
The warehousing of long lead items continued to be managed to optimise product warranty conditions,
with delivery timeframes aligned with anticipated development schedule.
The Company prepared for the procurement of the ‘balance of plant’ capital and infrastructure items to
support the expanded Stage 1A+ nominal production of 100,000 wet metric tonnes per annum (wmt pa).
Recruitment of a Construction Manager was undertaken, with the appointment of Greg Matthews to the
role following the end of the quarter.
Operations at the Streaky Bay Pilot Plant were minimised to conserve cash, while operating in support of
providing samples and in support of advancing the detailed plant design and engineering for Stage 1A+.
During the quarter there were no lost time injuries, and no reportable environmental incidents.
Andromeda Metals Limited | 4
Figure 3 – Status of preparations ahead of planned construction
Regional Exploration
Eyre Kaolin Project
(Andromeda has earned a 51% interest by expending $750,000 by November 2024)
The Eyre Kaolin Joint Venture (EKJV) comprises four tenements located in close proximity to the GWP,
which include kaolin prospects with complementary properties to those at GWP.
During the quarter, drilling was conducted at the Chairlift Deposit to test for potential extensions and
better define areas of the deposit that best complement Great White kaolin, with high brightness and
low titanium. Samples collected from the drilling campaign have been sent for analysis.
Additionally, Andromeda progressed a program to assess approximately 300 historic drillholes within the
EKJV Project and surrounding area. Most of these holes were previously assayed only for uranium or heavy
mineral sands, are now being reanalysed for a broader spectrum of commodities.
The Company has the right to earn a further 29% interest in the EKJV (for a total of 80%) by expending a
further $2 million on exploration by November 2027.
Figure 4 - Recent drilling conducted at Chairlift Deposit (ground view)
Andromeda Metals Limited | 5
Figure 5 - Recent drilling conducted at Chairlift Deposit (aerial view)
Metals Projects
Andromeda’s strategic focus remains on developing our portfolio of kaolin projects which has resulted in
the Company divesting its gold and copper assets.
During the quarter, the Company continued to progress the tenement transfers related to the previously
completed sales of the Wudinna Gold Project and Moonta Copper Gold Project, via South Australia’s
subdivision process.
HPA Project – Breakthrough Results
During the quarter, test work to optimise the Company’s novel flowsheet for the production of the critical
mineral high purity alumina (HPA), using high-quality refined kaolin product from GWP, produced
breakthrough results7.
Samples of HPA produced from the test work were submitted for independent analysis to EAG Eurofins
USA, a globally recognised leader in materials testing located in the United States of America.
The analysis conducted by EAG Eurofins USA confirmed the HPA sample as 99.9985% pure, which was
independently confirmed by analysis conducted by Australia’s National Science Agency, the
Commonwealth Scientific and Industrial Research Organisation (CSIRO).
Andromeda’s novel flowsheet uses established metallurgical unit operations to refine the aluminium oxide
(Al2O3) from kaolin. The successful trials at lab scale of the flowsheet sets Andromeda apart from other
HPA producers, as the process is more cost and carbon effective than other reported processes.
These outstanding results demonstrate the potential to expand Andromeda’s product portfolio in the
future to include a value-added critical mineral.
7
Refer ADN ASX dated 1 May 2025 titled Andromeda Achieves HPA Breakthrough: Successful Production of 4N HPA & Validation
of Novel Flow Sheet.
Andromeda Metals Limited | 6
Following the positive results from the test work and using funds raised through the Share Placement (refer
to Finance section below), the Company commenced the development of a Scoping Study to assess
the market opportunity of progressing the HPA Project.
In parallel, Andromeda has progressed HPA product development and marketing activities, including
engagement with:
industry participants and market experts to assist in understanding product form, morphology and
•
crystalline structure to suit various applications;
potential investment partners to assist with the development and future funding requirements of
•
the HPA opportunity; and
government and related bodies for potential funding opportunities.
•
Corporate
Finance
Cash and cash equivalents at the end of the quarter were $7,142k, an increase of $2,474k from the
previous quarter's closing balance of $4,668k.
During the quarter, the Company conducted a placement of new fully paid ordinary shares (Share
Placement) raising approximately $5 million before costs, through the issuing of 384.6 million new shares
to institutional and sophisticated investors, at a price of $0.013 per new share.
Funds raised under the Share Placement are to be used:
•
to progress the Great White Project, including early works, advanced plant design and
engineering, and technical, financial and legal activities to support the funding process for
project development;
•
to progress the Company’s HPA project, including the Scoping Study and product and market
development activities; and
•
for general working capital and the costs of the Placement.
Under the terms of the Share Placement, participants also received 3 free attaching options for every 4
new shares allocated, exercisable at $0.0195 for a fully paid ordinary share and expiring 2 July 2027.
Following approval by shareholders at a General Meeting, 293.5 million new options were issued, inclusive
of 5 million which were issued to the Joint Lead Managers as part of their fees. If exercised, these new
options will provide an additional $5.6 million in working capital for the Company.
The Company continued minimising expenditure to support it in conserving cash. Such measures include:
•
•
•
•
•
8
Mick Wilkes electing not to receive any director fees until the Project is fully financed;
Sue-Ann Higgins accepting reduced fees than what she would ordinarily have received as an
Executive Chair
No salary increases being awarded, and no short-term incentives (STIs) being paid, following the
annual remuneration review for the 2024 financial year;
Reducing some staff to a temporary part-time commitment to save salary costs (noting that it is
crucial we retain them for the funding due diligence process and to demonstrate we can deliver
the Project); and,
Implementation of a strategy to allow directors and employees to have some of their
remuneration or fees satisfied by the issue of zero exercise price options (ZEPOs), whilst
development funding is being pursued until 30 June 2025.8 This includes:
- Sue-Ann Higgins accepting $44,000 of her Director fees being satisfied as ZEPOS;
Approved by shareholders at the 2024 Annual General Meeting.
Andromeda Metals Limited | 7
-
both Jean-Dominique (JD) Sorel and Miguel Galindo accepting the issue of ZEPOs in
Andromeda for 100% of their director fees until of 30 June 2025.
Both Mr Sorel and Mr Galindo agreeing to extend this arrangement and accept ZEPOS in
Andromeda for 100% of their director fees until the earlier of FID and 31 December 2025 (based
on the 10 day VWAP of Andromeda shares up to and including 30 June 2025, being $0.01252),
subject to shareholder approval (with those fees to be paid in cash if shareholder approval is
not obtained).
During the quarter, net funds used in operating activities were $1,458k and net funds used in investing
activities were $672k. Net funds from financing activities were $4,604k.
Exploration and Evaluation Expenditure during the quarter was $650k. Full details of exploration and
evaluation activity during the Quarter are set out in this report.
There were no substantive mining production and development activities during the quarter.
Payments to related parties of the Company and their associates during the quarter were $79k, consisting
of executive director salaries and payments to Galesk Consultancy.
General Meeting
During the period, a General Meeting of the Company was held at which all 5 resolutions were carried,
in line with the Board’s recommendations, as follows:
•
Resolution 1 – Ratification of Issue of Placement Shares, was carried;
•
Resolution 2 – Approval of Issue of the Placement Options, was carried;
•
Resolution 3 – Approval of Issue of Broker Options as part of fees for Joint Lead Managers, was
carried;
•
Resolution 4 – Approval to Issue Securities to Mr Jean-Dominique Sorel in lieu of remuneration, was
carried; and,
•
Resolution 5 – Approval to Issue Securities to Mr Miguel Galindo in lieu of remuneration, was
carried.
Capital Structure
During the period, the following changes in securities in the Company occurred:
•
384,615,385 Ordinary shares were issued under a Share Placement, in addition to 293,461,554
Listed options (exercisable at $0.0195 and expiring on 2 July 2027) following approval by
shareholders;
•
1,972,789 Ordinary shares were released from voluntary escrow on Monday 30 June 2025; and,
•
15,527,758 Unlisted zero priced options (ZEPOs) issued in lieu of director fees for the period from
appointment to 30 June 2025, following approval by shareholders at a General Meeting held on
30 June 2025.
•
This announcement has been approved for release by the Board of Directors of Andromeda Metals Limited.
For more information about the Company and its projects, please visit our website, or contact:
Manager, Investor Relations & Corporate Affairs
Patrick Sinclair
T: 08 7089 9819
M: 0403 708 431
E: Patrick.Sinclair@andromet.com.au
Andromeda Metals Limited | 8
FORWARD-LOOKING STATEMENTS
This document contains or may contain certain forward-looking statements and comments about future events, that
are based on Andromeda's beliefs, assumptions and expectations and on information currently available to
management as at the date of this document. Often, but not always, forward-looking statements can generally be
identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate",
"outlook", and "guidance", or similar expressions. Such statements are only expectations or beliefs and are subject to
inherent risks and uncertainties which could cause actual values, results or performance achievements to differ
materially from those expressed or implied in this presentation. Where Andromeda expresses or implies an
expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a
reasonable basis. No representation or warranty, express or implied, is made by Andromeda that the matters stated
in this presentation will in fact be achieved or prove to be correct. Except as required by law, Andromeda undertakes
no obligation to provide any additional or updated information or update any forward-looking statements, whether
on a result of new information, future events, results or otherwise. Readers are cautioned against placing undue
reliance on forward-looking statements. These forward-looking statements are not guarantees of future performance
and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of Andromeda, the directors, and management of Andromeda.
Andromeda Metals Limited | 9
SUMMARY SCHEDULE OF TENEMENTS AS AT 30 JUNE 2025
Project
Tenement
Tenement Name
Area
km2
Registered Holder or Applicant
Nature of
Company's
Interest %
ML 6532
Great White
319 ha
Andromeda Industrial Minerals Pty Ltd1
AIM 100%
MPL 163
Water Pipeline MPL
78 ha
Andromeda Industrial Minerals Pty Ltd
AIM 100%
MPL 164
Access Road MPL
13 ha
Andromeda Industrial Minerals Pty Ltd
EL 6588
Tootla
372
Andromeda Industrial Minerals Pty Ltd2
AIM 100%
AIM 100%
EL 6202
Mt Hall
147
Andromeda Industrial Minerals Pty Ltd
EL 6426
Mt Cooper
648
Andromeda Industrial Minerals Pty Ltd
EL 6663
Aspen
976
Peninsula Exploration Pty Ltd
EL 6664
Whistler
452
Peninsula Exploration Pty Ltd
EL 6665
Hotham
875
Peninsula Exploration Pty Ltd
EL 6666
Thredbo
496
Peninsula Exploration Pty Ltd
EL 6286
Mt Hope
227
Andromeda Industrial Minerals NZ Pty Ltd 4
100%
EL 6317
Pinkawillinie
156
Peninsula Resources Pty Ltd5
EL 6131
Corrobinnie
1,303
Peninsula Resources Pty Ltd
EL 6489
Wudinna Hill
42
Peninsula Resources Pty Ltd
EL 5953
Minnipa
184
Peninsula Resources Pty Ltd
EL 6001
Waddikee Rocks
147
Peninsula Resources Pty Ltd
EL 5984
Moonta-Wallaroo
713
Peninsula Resources Pty Ltd
PRL 0%
LAM 100%
PRL 0%
LAM 100%
PRL 0%
LAM 100%
PRL 0%
LAM 100%
PRL 0%
LAM 100%
100% ECR7
EL 5984
Moonta-Porphyry JV
106
Peninsula Resources Pty Ltd
South Australia
The Great White
Project
Eyre Kaolin
Project3
Mt Hope Kaolin
Project
Wudinna Gold
Joint Venture6
Moonta Copper
Gold Project
1
2
3
4
5
6
7
AIM 100%
AIM 100%
AIM 51%
Peninsula 49%
AIM 51%
Peninsula 49%
AIM 51%
Peninsula 49%
AIM 51%
Peninsula 49%
90% ECR
10% AIC Mines Ltd
Andromeda Industrial Minerals Pty Ltd (AIM), (incorporated 9 August 2018) is a wholly owned subsidiary of Andromeda Metals Ltd.
On 26 July 2024, the 25% share held by GSK (Great Southern Kaolin Pty Ltd (GSK) is a wholly owned subsidiary of Andromeda Metals Ltd.) was transferred to
AIM, resulting in AIM’s interest increasing to 100%.
On 15 July 2024, Andromeda Industrial Minerals Pty Ltd earned the right to claim a 51% interest in the Eyre Kaolin Project under a farm in agreement with
Peninsula Exploration Pty Ltd (Peninsula). Under the agreement Andromeda can earn a further 29% (for a total of 80%).
Andromeda Industrial Minerals NZ Pty Ltd is a wholly owned subsidiary of Andromeda Industrial Minerals Pty Ltd.
Peninsula Resources Pty Ltd (PRL), (incorporated 18 May 2007) is a wholly owned subsidiary of Andromeda Metals Ltd.
PRL remains the registered holder of these tenements whilst a subdivision or transfer is being effected – if subdivided PRL will retain some of the area of these
tenements, refer to ADN ASX announcement dated 23 April 2024 title Completion of Sale of Interest in Wudinna Gold Project.
PRL remains the registered holder of EL 5984 whilst the subdivision or transfer of this tenement is being effected – if subdivided PRL will retain some of the area
of this tenement – refer to ADN ASX announcement dated 24 January 2024 titled Completion of Sale of Moonta Copper Gold Project.
Andromeda Metals Limited | 10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ANDROMEDA METALS LIMITED
ABN
Quarter ended (“current quarter”)
75 061 503 375
Consolidated statement of cash flows
1
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 June 2025
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(442)
(1,589)
(1,053)
(3,763)
-
-
(e) administration, corporate, marketing and R&D costs
1.3
Dividends received (see note 3)
1.4
Interest received
40
142
1.5
Interest and other costs of finance paid
(3)
(16)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
0
582
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
(1,458)
(4,644)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2
2.1
Current quarter
$A’000
Year to date
(12 months)
$A’000
Cash flows from investing activities
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(22)
(1,476)
(d) exploration & evaluation (capitalised)
(650)
(2,802)
(e) investments
-
-
(f) other non-current assets
-
-
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
950
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other
-
1,790
(672)
(1,538)
5,000
8,821
2.2
Proceeds from the disposal of:
- Government grants, subsidies and tax incentives
2.6
3
Net cash from / (used in) investing activities
Cash flows from financing activities
3.1
Proceeds from issues of equity securities (excluding
convertible debt securities)
3.2
Proceeds from issue of convertible debt securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity securities or
convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and borrowings
(339)
(651)
3.8
Dividends paid
-
-
3.9
Other (Lease repayments)
(57)
(282)
3.10
Net cash from / (used in) financing activities
4,604
7,888
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4
Net increase / (decrease) in cash and cash
4.1
Cash and cash equivalents at beginning of period
4,668
5,436
4.2
Net cash from / (used in) operating activities (item 1.9 above)
(1,458)
(4,644)
4.3
Net cash from / (used in) investing activities (item 2.6 above)
(672)
(1,538)
4.4
Net cash from / (used in) financing activities (item 3.10 above)
4,604
7,888
4.5
Effect of movement in exchange rates on cash held
4.6
Cash and cash equivalents at end of period
5
Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the consolidated
statement of cash flows) to the related items in the accounts
5.1
Bank balances
5.2
7,142
Current quarter
$A’000
7,142
Previous quarter
$A’000
7,142
4,668
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter (should
equal item 4.6 above)
7,142
4,668
6
Payments to related parties of the entity and their associates
6.1
6.2
Current quarter
$A'000
Aggregate amount of payments to related parties and their associates included in item 1
(79)
Aggregate amount of payments to related parties and their associates included in item 2
0
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments.
The amount at items 6.1 and 6.2 comprises executive director salaries, bonuses & termination payments, non-executive director fees and consulting fees
paid to directors or related corporations of directors of the Company during the quarter.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7
Financing facilities
Note: the term “facility’ includes all forms of financing arrangements available
to the entity.
Add notes as necessary for an understanding of the sources of finance
available to the entity.
Total facility
amount at quarter end
Amount drawn at
quarter end
$A’000
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (credit card facility)
90
14
7.4
Total financing facilities
90
14
7.5
7.6
Unused financing facilities available at quarter end
-
-
76
Include in the box below a description of each facility above, including the lender, interest rate, maturity date and
whether it is secured or unsecured. If any additional financing facilities have
Share your feedback
Discover