Quarterly Activity Report – September 2023
Andromeda Metals Limited (ASX: ADN) (Andromeda, the Company) reports the following activities
during the quarter ended 30 September 2023, demonstrating continued progress in advancing The
Great White Project (TGWP or Project).
HIGHLIGHTS
Updated Definitive Feasibility Study (2023 DFS)
• Comprehensive strategy review undertaken, establishing an enhanced product portfolio in
high value markets.
• Significantly improved economics over 2022 DFS:
o
65% increase in net present value (NPV) to $1,010 million over a 28-year life of mine, and
o
59% increase in average earnings before interest tax depreciation and amortisation
(EBITDA) to $130 million per annum.
Commercial
• Update on Offtake and Term Sheet agreements:
o
Letter of Intent received from IberoClays SLU for exclusive distribution of 15,000-20,000
tonnes per annum (tpa), to the Mediterranean region with pre-payments for all quarterly
orders confirmed by 30 September 2025; and
o
Subsequent to the quarter, Binding Offtake Agreement signed for 120,000 tonnes of
kaolin products during first 5 years of production, into the Chinese market.
Technical
• Independent test work and value in use analysis conducted by ITC on Great White CRM™
was progressed, confirming zircon replacement potential.
• End use customer validation test work on Great White HRM™ continued.
Operations
• Procurement of long lead items was progressed, with all long lead items now ‘on order’.
Corporate
• Appointment of Pascal Alexander-Bossy as CFO, commencing 20 November 2023.
• Receipt of a refund of $1.2 million from Australian Taxation Office related to incentives for
research & development activities conducted during the 2022 financial year.
Managing Director and CEO, Bob Katsiouleris, said “Significant progress was achieved during the
quarter, as we build the partnerships necessary for the development of The Great White Project.
“The completion of the 2023 DFS enables our funding strategy to progress for the remaining capital
required, to move towards anticipated construction and into production.”
Discussion
Andromeda reports the following activities, which were undertaken during the quarter ended 30
September 2023.
2023 DFS
During the quarter, the updated Definitive Feasibility Study (2023 DFS) was completed,
demonstrating that the development of TGWP represents a pre-tax net present value (NPV) of
$1,010 million over the 28-year life of mine1. This was a 65% improvement compared to the 2022 DFS.
This followed a comprehensive review of the commercial strategy and the approach to developing
the world-class, high quality Great White Deposit, resulting in an enhanced product portfolio
targeting high value markets.
The commercial strategy review confirmed TGWP’s core product portfolio as Great White CRM™
and Great White KCM™90 and identified a value in use that is above market in established and
growing segments for high quality ceramic tiles and porcelain tableware.
TGWP’s complementary product portfolio was defined as Great White HRM™ and industrial sand
co-products. In addition to the current established use of Great White HRM™ as a rheology
modifier, the global market for low-carbon concrete production was identified as a further
opportunity to be commercialised.
The sale of industrial sand co-products, which were not
commercialised in the 2022 DFS, were included to meet identified regional shortfalls in the
construction and infrastructure markets.
The 2023 DFS identified global kaolin prices were strengthened due to increased geopolitical risk
and global and regional supply shortages, while an updated mine development plan supported
an accelerated sales profile and reduced costs across the life of mine. These led to a 34% increased
on the weighted average product margin improved, to $450/tonne of product, and a 59% increase
in average earnings before interest tax depreciation and amortisation (EBITDA), to $130 million p.a.,
when compared to the 2022 DFS.
Commercial
During the quarter, discussions with a number of parties with the aim of securing offtake agreements
for the planned production from The Project, were progressed.
These discussions were supported by Andromeda’s CEO and Managing Director, Bob Katsiouleris
meeting with key prospective offtake partners in Europe, including in the major ceramics centre of
Castellon, Spain and at the CERSAIE International Exhibition in Bologna, Italy.
Key outcomes achieved from the discussions, include:
• A Letter of Intent (LOI) from IberoClays SLU for exclusive distribution of 15,000-20,000 tonnes
per annum (tpa) to the Mediterranean region during the first 3 years of production, was
received. The LOI included pre-payment terms, payable at the beginning of each quarter
for product to be shipped during that quarter, for confirmed orders placed before 30
September 2025. The LOI also provided that a formal binding agreement will be put in place
1
ADN ASX dated 24 August 2023 titled The 2023 DFS delivers significantly improved economics, following a comprehensive
strategy review establishing an enhanced product portfolio in high value markets.
Andromeda Metals Limited | 2
before 31 October 2023, and negotiations for this are ongoing. The Company will release an
announcement on ASX as soon as any formal binding agreement is entered into; and
• Subsequent to the quarter, a legally binding offtake agreement for 120,000 tonnes of kaolin
products into the Chinese market during the first 5 years of production was signed, subject to
standard conditions precedent for the benefit of Andromeda. The agreement with Foshan
Gaoming Xing-Yuan Machinery Co. Ltd may require payment obligations to be secured by a
letter of credit and replaces the terms sheet previously entered into by the parties in June
20232.
Technical
During the quarter, the validation program on Great White CRM™ conducted independently by
the Instituto de Tecnología Cerámica (ITC), located at the University of Castellón in Spain, was
progressed.
Interim test results on the suitability of Great White CRM™ for ceramic glazes, confirming zircon
replacement potential and including international benchmarking comparisons, were received3.
The interim results confirmed and validated the testing conducted previously by IberoClays, which
found that Great White CRM™ provides above market value in use to the fast-growing large format
porcelain and ceramic tiles and glaze segments4.
Subsequent to the quarter, the finalised results from the three-stage program, including formulation
for use in a pilot production trial at a frit and glaze producer in Spain, were completed.
End-user technical validation trials for the use of Great White HRM™ as an additive to decarbonise
concrete, with cement suppliers and concrete manufacturers, continued during the quarter.
Operations
During the quarter, the procurement of long lead items progressed, with orders for the Thickener,
Filter Press and Filter Cake Feeder being placed. This resulted in all long lead times being ‘on order’.
The Company progressed procurement of the ‘balance of plant’ capital and infrastructure items,
in line with the aim of targeting the first shipment of product from TGWP early during the fourth
quarter (Q4) of calendar year 2024.
The subdivision of all the required freehold land underpinning TGWP (ML 6532 and MPL 164) was
progressed. Following the completion of the subdivision process, existing property boundaries will
be realigned to allow for the settlement of the Land Purchase Agreements (as previously
announced5) to proceed.
To support an expected increase in requests for samples from the Streaky Bay Pilot Plant (SBPP), a
comprehensive review was undertaken. The focus of the review was to enable a scaling up of
operations to support additional customer testing and further product validation, while ensuring
safe, sustainable operations.
2
ADN ASX dated 7 June 2023 titled Term Sheet signed for significant quantities of kaolin products for Chinese market.
Refer ADN ASX dated 18 July 2023 titled Presentation at Noosa Mining Conference.
4
As determined by testing conducted on Great White CRM™ by IberoClays (May/June 2023).
5
Refer ADN ASX dated 18 August 2022 titled Andromeda progresses Great White Kaolin Project with signing of Land
Acquisition Agreements and lodgement of PEPR.
3
Andromeda Metals Limited | 3
In September, the SBPP was safely and successfully re-commissioned after the upgrade based on
the “5S” continuous improvement methodology.
Following the re-commissioning, the SBPP
produced 144 kg of sample product, which was delivered to prospective customers.
During the quarter there were no safety incidents, no lost time injuries, and no reportable
environmental incidents.
Regional Minerals Exploration
With the Company focused on developing the Great White Deposit, regional exploration has been
minimised, while keeping the tenements in good standing.
TGWP – Regional exploration (Andromeda 100%)
Andromeda continued to explore for kaolin with properties that complement those of the Great
White Deposit.
Eyre Kaolin Project
(Andromeda farming in under Stage 1 to earn a 51% interest by expending $750,000 by November 2024)
Towards the end of the quarter, initial results from follow-up drilling conducted at the Chairlift kaolin
prospect, located on tenement EL 6664, were received. Andromeda will evaluate the potential for
a Mineral Resource Estimate following receipt and validation of the assay results.
Metals Projects
Andromeda’s strategic focus remains on developing our portfolio of halloysite-kaolin projects.
Accordingly, the Company continues to seek opportunities to realise maximum shareholder value
for our gold and copper assets while minimising the cost and management time incurred.
Moonta Copper Gold Project (Andromeda partial farm-out 100%)
Andromeda continued to review the Moonta Copper Gold Project, utilising existing drilling results
to assess the in-situ recovery potential of 100% Andromeda-held copper prospects, in association
with joint venture partner Environmental Metals Recovery Pty Ltd (EMR).
During the quarter discussions were held between Andromeda and EMR to determine the best way
to proceed with the project.
Wudinna Gold Project (Andromeda farm-out 25%)
During the quarter, joint venture partner Cobra Resources plc (Cobra) announced upgrades to the
project’s Gold Mineral Resource estimates6.
Drummond Epithermal Gold Project (Andromeda 100%)
The Drummond Epithermal Gold Project (Drummond) continued to be held 100% by Andromeda
during the quarter, pending its sale (via the disposal of subsidiary Adelaide Exploration Pty Ltd) to
Rush Resources Limited (Rush) for approximately $250,000 worth of fully paid ordinary shares in Rush 7.
During the quarter, the Company announced that, as a result of Rush being acquired by ASX-listed
Trigg Minerals Limited (Trigg, ASX: TMG) via a share sale agreement, rather than receiving shares in
Rush as consideration for the sale of Drummond, Andromeda will instead receive shares in Trigg.
6
Refer to Cobra LSE announcement dated 7 September 2023 titled Rare Earth and Gold Resource Upgrades - Unique and
Economically Advantageous Dual Resource Project.
7
Refer ADN ASX dated 31 October 2022 titled Quarterly Activities Report – September 2022.
Andromeda Metals Limited | 4
Completion of both the binding share sale agreement between Rush and Trigg, and of the sale of
Drummond to Rush are expected to occur simultaneously subject to satisfaction of a number of
conditions precedent by 6 November 2023.
Following completion of the sale of Drummond, Andromeda will receive Trigg shares to the value
of the following amounts:
•
$250,000 as consideration for the sale of Drummond to Rush, and
•
Reimbursement of all expenditure incurred by Andromeda in respect of the Drummond
tenements from 1 August 2022 until 30 June 2023, up to an amount of $45,000 (excluding GST).
Shares in Trigg will be issued at the price equal to the 5-day volume-weighted average price
(VWAP) of Trigg shares for the five trading days up to completion of the sale.
Corporate
Capital Structure
No shares were issued during the quarter.
On 28 July 2023, 30,629 Performance Rights lapsed due to the conditions no longer being able to
be satisfied.
Finance
The Company continued to prudently manage costs during the period. Cash and cash equivalents
at the end of the quarter were $13,091k, a decrease of $2,210k from the previous quarter's closing
balance of $15,301k. This included payments of $438k related to long lead and other capital items,
and receipt of a refund of $1.2 million from the Australian Tax Office for the FY22 Income Tax Return
related to research & development incentives.
During the quarter, net funds used in operating activities were $1,328k. Net funds used in investing
activities were $827k. Net funds used in financing activities were $55k.
Exploration and Evaluation Expenditure during the quarter was $1,080k. Full details of exploration
and evaluation activity during the Quarter are set out in this report, including activities for the
progression of the TGWP set out above.
There were no substantive mining production and development activities during the quarter.
Payments to related parties of the Company and their associates during the quarter were $249k,
consisting of executive director salaries and non-executive director fees.
Funding
During the quarter, the Company continued moving towards making a final investment decision
while evaluating funding arrangements that best suit the long-term interests of the Company and
its shareholders. The financing arrangements considered include a range of debt and equity mix
options.
Discussions with potential debt financiers continued, while completion of the 2023 DFS supported
discussions with potential equity financiers.
Executive and Board changes
Subsequent to the quarter, the Company announced the appointment of Pascal Alexander-Bossy
as Chief Financial Officer, commencing 20 November 2023.
Andromeda Metals Limited | 5
In addition, James Marsh resigned as a Director of the Company on 10 October, while continuing
in his executive sales and marketing role.
This announcement has been approved for release by the Board of Directors of Andromeda Metals
Limited.
For more information about the Company and its projects, please visit our website,
www.andromet.com.au or contact:
Manager, Investor Relations & Corporate Affairs
Patrick Sinclair
T: 08 7089 9819
M: 0403 708 431
E: Patrick.Sinclair@andromet.com.au
Andromeda Metals Limited | 6
SUMMARY SCHEDULE OF TENEMENTS AS AT 30 SEPTEMBER 2023
Project
Nature of Company's
Tenement
Tenement Name
Area km2
Registered Holder or Applicant
ML 65323
Great White
319 ha
Andromeda Industrial Minerals Pty Ltd1
and Great Southern Kaolin Pty Ltd2
AIM 75%
GSK 25%
MPL 1633
Water Pipeline MPL
78 ha
Andromeda Industrial Minerals Pty Ltd
and Great Southern Kaolin Pty Ltd
AIM 75%
GSK 25%
MPL 1643
Access Road MPL
13 ha
Andromeda Industrial Minerals Pty Ltd
and Great Southern Kaolin Pty Ltd
AIM 75%
GSK 25%
EL 6588
Tootla
372
Andromeda Industrial Minerals Pty Ltd
and Great Southern Kaolin Pty Ltd
AIM 75%
GSK 25%
EL 6202
Mt Hall
147
Andromeda Industrial Minerals Pty Ltd
and Great Southern Kaolin Pty Ltd
AIM 75%
GSK 25%
EL 6426
Mt Cooper
648
Andromeda Industrial Minerals Pty Ltd
and Great Southern Kaolin Pty Ltd
AIM 75%
GSK 25%
EL 6317
Pinkawillinie
156
Peninsula Resources Ltd4
EL 6131
Corrobinnie
1,303
Peninsula Resources Ltd
EL 6489
Wudinna Hill
42
Peninsula Resources Ltd
EL 5953
Minnipa
184
Peninsula Resources Ltd
EL 6001
Waddikee Rocks
147
Peninsula Resources Ltd
EL 5984
Moonta-Wallaroo
713
Peninsula Resources Ltd
PRL 25%
LAM 75%
PRL 25%
LAM 75%
PRL 25%
LAM 75%
PRL 25%
LAM 75%
PRL 25%
LAM 75%
100%
EL 5984
Moonta Porphyry JV
106
Peninsula Resources Ltd
90% - option to acquire
100% from AIC Mines Ltd
EL 6128
Camel Lake
455
Andromeda Industrial Minerals Pty Ltd
and Great Southern Kaolin Pty Ltd
AIM 75%
GSK 25%
ELA 2019/73
Dromedary
481
Demetallica Operations Pty Ltd 6
EL 6663
Aspen
976
Peninsula Exploration Pty Ltd7
AIM 75%
GSK 25%
Peninsula 100%
EL 6664
Whistler
452
Peninsula Exploration Pty Ltd
Peninsula 100%
EL 6665
Hotham
875
Peninsula Exploration Pty Ltd
Peninsula 100%
EL 6666
Thredbo
496
Peninsula Exploration Pty Ltd
Peninsula 100%
EL 6286
Mt Hope
227
Andromeda Industrial Minerals NZ Pty
Ltd 8
100%
EPM 18090
Glenroy
196
Adelaide Exploration Pty Ltd9
100%
EPM 25660
Gunthorpe
74
Adelaide Exploration Pty Ltd
100%
EPM 26154
Sandalwood Creek
109
Adelaide Exploration Pty Ltd
100%
EPM 26155
Mount Wyatt
144
Adelaide Exploration Pty Ltd
100%
EPM 27501
Packhorse Creek
16
Adelaide Exploration Pty Ltd
100%
E 63/2089
Circle Valley
29
Mylo Gold Pty Ltd10
100%
Interest %
South Australia
The Great White
Project
Wudinna Gold Joint
Venture
Moonta Copper Gold
Project5
Camel Lake
Halloysite Project
Eyre Kaolin Project
Mt Hope Kaolin
Project
Queensland
Drummond Gold
Project
Western Australia
Dundas Project
1
2
3
4
Andromeda Industrial Minerals Pty Ltd (AIM) (incorporated 9 August 2018) is a wholly owned subsidiary of Andromeda Metals Ltd.
Great Southern Kaolin Pty Ltd (GSK) is a wholly owned subsidiary of Andromeda Metals Ltd.
On 17 October 2023, the 25% interest held in The Great White Project by GSK was transferred to AIM, resulting in AIM’s interest increasing to 100% of The Project.
Peninsula Resources Ltd (PRL), (incorporated 18 May 2007) is a wholly owned subsidiary of Andromeda Metals Ltd. PRL has a farm-out agreement with Lady
Alice Mines Pty Ltd (LAM), a wholly owned subsidiary of Cobra Resources PLC.
5 Andromeda Metals Ltd has partnered with Environmental Metals Recovery Pty Ltd (EMR) to form the Moonta ISR Joint Venture.
6 Demetallica Operations Pty Ltd, which is a wholly owned subsidiary of AIC Mines Ltd. Registered interest is to be transferred to AIM (75%) and GSK (25%)
upon grant.
7 Andromeda Industrial Minerals Pty Ltd has a farm in agreement with Peninsula Exploration Pty Ltd (Peninsula) over the Eyre Kaolin Project.
8 In July 2023 this tenement was transferred to Andromeda Industrial Minerals NZ Pty Ltd, which is a wholly owned subsidiary of Andromeda Metals Ltd.
9 Adelaide Exploration Pty Ltd (incorporated 13 July 2001) is a wholly owned subsidiary of Andromeda Metals Ltd, but is the subject of a sale agreement – refer
ADN ASX announcement dated 15 September titled Update on Sale of Drummond Epithermal Gold Project.
10 Mylo Gold Pty Ltd (acquired 21 December 2017) is a wholly owned subsidiary of Andromeda Metals Ltd.
Andromeda Metals Limited | 7
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ANDROMEDA METALS LIMITED
ABN
Quarter ended (“current quarter”)
75 061 503 375
Consolidated statement of cash flows
1
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 September 2023
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(361)
(361)
(1,637)
(1,637)
-
-
(e) administration, corporate, marketing and R&D costs
1.3
Dividends received (see note 3)
1.4
Interest received
160
160
1.5
Interest and other costs of finance paid
(6)
(6)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
516
516
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
(1,328)
(1,328)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2
2.1
Current quarter
$A’000
Year to date
(3 months)
$A’000
Cash flows from investing activities
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(438)
(438)
(1,080)
(1,080)
(e) investments
-
-
(f) other non-current assets
-
-
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other
- Government grants, subsidies and tax incentives
691
691
Net cash from / (used in) investing activities
(827)
(827)
(c) property, plant and equipment
(d) exploration & evaluation (capitalised)
2.2
2.6
3
Proceeds from the disposal of:
Cash flows from financing activities
3.1
Proceeds from issues of equity securities (excluding
convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity securities or
convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Lease repayments)
(55)
(55)
3.10
Net cash from / (used in) financing activities
(55)
(55)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4
Net increase / (decrease) in cash and cash
4.1
Cash and cash equivalents at beginning of period
15,301
15,301
4.2
Net cash from / (used in) operating activities (item 1.9 above)
(1,328)
(1,328)
4.3
Net cash from / (used in) investing activities (item 2.6 above)
(827)
(827)
4.4
Net cash from / (used in) financing activities (item 3.10 above)
(55)
(55)
4.5
Effect of movement in exchange rates on cash held
4.6
Cash and cash equivalents at end of period
5
Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the consolidated
statement of cash flows) to the related items in the accounts
5.1
Bank balances
5.2
-
-
13,091
Current quarter
$A’000
13,091
Previous quarter
$A’000
13,091
5,301
Call deposits
-
10,000
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter (should
equal item 4.6 above)
13,091
15,301
6
Payments to related parties of the entity and their associates
6.1
6.2
Current quarter
$A'000
Aggregate amount of payments to related parties and their associates included in item 1
(233)
Aggregate amount of payments to related parties and their associates included in item 2
(16)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments.
The amount at items 6.1 and 6.2 comprises executive director salaries, non-executive director fees and consulting fees paid to directors or related
corporations of directors of the Company during the quarter.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7
Financing facilities
Note: the term “facility’ includes all forms of financing arrangements available
to the entity.
Add notes as necessary for an understanding of the sources of finance
available to the entity.
Total facility
amount at quarter end
Amount drawn at
quarter end
$A’000
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (credit card facility)
90
10
7.4
Total financing facilities
90
10
7.5
7.6
Unused financing facilities available at quarter end
80
Include in the box below a description of each facility above, including the lender, interest rate, maturity date and
whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be
entered into after quarter end, include a note providing details of those facilities as well.
The Company has a credit card facility financed through Westpac with a limit of $90,000. This facility is denominated in
Australian dollars and is secured against cash deposits of the same amount shown as restricted cash in Item 5.4 of this report.
An annual fee is charged for this facility at market rates. There are no set amounts are payable under this facility, other than
the annual fee, unless the consolidated entity does not adhere to the terms of the agreements.
8
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing activities) (item 2.1(d))
(1,080)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(2,408)
8.4
Cash and cash equivalents at quarter end (item 4.6)
13,091
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by item 8.3)
(1,328)
80
13,171
5.47
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a figure for the
estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating cash
Type text here
flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
2
This statement has been prepared in accordance with accounting standards and policies which comply with Listing
This statement gives a true and fair view of the matters disclosed.
31 October 2023
Date:
.................................................................................
By the Board
Authorised by: .................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the
past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information
over and above the minimum required under the Listing Rules is encouraged to do so.
2
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of,
AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash
flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding
equivalent standards apply to this report.
3
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the
accounting policy of the entity.
4
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised
for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee – eg Audit and Risk
Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.
5
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with
recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should
have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that
this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion
has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover