Letter from the Chair
4
Acting CEO’s report
6
Operations review
8
Sue-Ann Higgins
Executive Chair
Mick Wilkes
Independent
Non-executive Director
Jean-Dominique Sorel
Non-executive Director
Miguel Galindo
Non-executive Director
COMPANY SECRETARY
Sarah Clarke
Acting CEO,
General Counsel and
Company Secretary
ANDROMEDA METALS LIMITED
ABN: 75 061 503 375
ASX code: ADN
REGISTERED AND PRINCIPAL ADDRESS
9
HPA Project
18
Exploration
21
Great White Deposit
22
Hammerhead Deposit
23
Tiger Deposit
24
Eyre Kaolin Project
25
Mount Hope Kaolin Project
26
Level 10, 431 King William Street
Adelaide, South Australia 5000
Corporate
27
Sustainability
29
CONTACT DETAILS
Resources and reserves
38
Competent person statements
41
Schedule of tenements
42
Telephone: +61 8 7089 9800
ir@andromet.com.au
www.andromet.com.au
SHARE REGISTRY
Directors’ report
43
Computershare Investor Services Pty Ltd
Level 5, 115 Grenfell Street
Adelaide, South Australia 5000
Directors and key management personnel
44
Operating and financial review
49
GPO Box 1903, Adelaide, SA 5001
Remuneration report (audited)
54
Enquiries (within Australia): 1300 556 161
Enquiries (outside Australia): +61 3 9415 4000
Auditor’s independence declaration
76
AUDITORS
Deloitte Touche Tohmatsu
11 Waymouth Street
Adelaide, South Australia 5000
Financial report
77
Notes to the financial statements
82
Directors’ declaration
114
Independent auditor's report
115
SOLICITORS
Shareholder information
120
Minter Ellison Lawyers
25 Grenfell Street
Adelaide, South Australia 5000
Glossary
123
BANKERS
Westpac Banking Corporation
Level 5, 97 King William Street
Adelaide, South Australia 5000
2
The Great White Project
A NDR OMEDA M E TAL S L I MI T E D
Highlights
THE GREAT WHITE PROJECT
High-grade, development-ready project with funding
discussions underway
BUILDING BLOCKS ARE IN PLACE
TO DELIVER THE GWP
9 Long-life, high-quality
resource
9 Strong economics
9 High grade, in demand,
premium products
9 Stage1A+ binding
offtakes finalised
9 Low capex hurdle
9 All approvals in-place to
commence development
9 Low-risk jurisdiction
9 Conventional mining
9 Mining lease
9 Experienced
9 Long-lead
9 Premium products
9 Stage 1A+
9 Logistics pathway
9 Binding offtakes
9 $75 million debt
9 Mining contractors
granted
Environmental plan
(PEPR) approved
validated by
experts and
customers
in place
operation
project team and
development
strategy ready
2024 bankable
feasibility study
finalised
facility with
Merricks Capital
credit approved
equipment
ordered and
under fabrication
selected
shortlisted
9 Clear market and
product upside
9 Shovel-ready, with
project team in place
Funding process underway to secure
balance of equity funding for a final
investment decision
HPA PROJECT
HPA Scoping Study demonstrating market-leading economics of
Andromeda’s innovative process
9 Scoping Study justifies the commercialisation of Andromeda’s HPA production technology using
Great White kaolin feedstock
9 Strong economic potential for Andromeda to become a leading global producer of low-cost,
low-carbon HPA
9 Market-leading economics with low cost of production and capital expenditure
9 HPA processing technology with lower-carbon emissions up to 48% lower than traditional process
Andromeda’s
Great White refined
kaolin product
Proven process
with recovered
hydrochloric acid (HCl)
Andromeda’s
novel process
Calcination
of HPA
Andromeda’s marketleading low-cost, lowcarbon HPA product
A NNUA L R E P O R T 202 5
3
Letter from the Chair
Dear Shareholders,
Welcome to the Annual Report covering the 2025
financial year (FY25) for Andromeda Metals Limited
(Andromeda, the Company).
Future growth opportunities
It is with great optimism and pride that I write this year’s
Chair’s Letter, reflecting on the diligent approach taken
in making strides in advancing the Great White Project
(GWP) towards a final investment decision.
Stage 1A+ is the initial stage of GWP, with other
product and customer growth opportunities being
pursued to support future expansions over GWP’s three
development stages.
Building a strong foundation
One of these opportunities is our High Purity Alumina
(HPA Project), following breakthrough test work results
confirming HPA produced to 99.9985% purity using our
proprietary flowsheet and kaolin from GWP.
GWP continues to be the cornerstone of our strategy
for positioning the Company for long-term success in
the industrial minerals sector.
With four binding offtake agreements now secured,
covering key global markets, we have laid a robust
commercial foundation for Stage 1A+ production.
These agreements validate the high-quality and
premium pricing of our products, reinforce the global
demand for high-quality kaolin, and underpin our
development funding strategy.
Stage 1A+ funding momentum
The Company has continued evaluating potential
funding options to best suit the long-term interests of
the Company and its shareholders.
A major highlight was receiving credit approval
from Merricks Capital for a $75 million debt facility,
a strong vote of confidence in the GWP and our
broader strategy.
We continue to actively engage with equity and
alternative capital providers to secure the remaining
funding required to support a final investment
decision (FID).
4
A NDR OMEDA M E TAL S L I MI T E D
The Company continues to pursue future
growth opportunities.
Following these outstanding results a HPA Scoping
Study was published, which Sarah discusses in her
Acting CEO’s Report.
Disciplined financial and capital management
Andromeda’s strategic focus remains on developing
GWP and our portfolio of kaolin projects. To support the
Company while the development funding process is
underway, a number of initiatives were implemented to
raise capital, reduce costs and divest non-core assets.
During FY25, two capital raisings were undertaken, to
support the Company while the project funding was
progressed. This included:
•
a share placement and pro-rata entitlement
offer in August 2024, which raised $3.82 million
before costs,
•
a share placement in May 2025, which raised
$5 million before costs,
•
with attaching options under these offers which, if
exercised, will provide an additional $11.6 million in
working capital.
Letter from the Chair
Throughout the financial year, the Board also remained
focused on prudently managing costs and conserving
cash. This saw a number of cost saving and cash
conservation measures implemented.
This included voluntary reductions in director fees,
some staff reducing their hours to being part-time,
and the granting of zero exercise price options
(ZEPOs) in lieu of part payment of director fees and
employee salaries.
In total, these measures conserved over $610,000 in
cash payments during the financial year, reflecting our
shared commitment to the Company’s success and our
belief in the value we are creating.
In addition, savings were achieved through salary
savings from non-replacement of personnel, minimising
discretionary expenditure and the divestment of our
non-core copper and gold assets.
Governance and leadership
The Board remains committed to responsible financial
and business practices, and the highest standards
of corporate governance. I invite you to read about
these in the Director’s Report starting on page 43 of
this Report.
This financial year saw a significant amount of Board
and Senior Management renewal, including the
appointments of Jean-Dominique (JD) Sorel and
Miguel Galindo as Non-executive Directors. Their deep
expertise in industrial minerals and global markets
strengthens our governance and broadens our
strategic capabilities.
Following their appointments in January 2025, Austen
Perrin elected to step down from the Board, to ensure
an orderly transition and to keep the size of the Board
appropriate to the size and position of the Company.
I thank Austen for the valuable contribution he has
made since his appointment in June 2022.
The financial year also saw Sarah Clarke step into
the role of Acting CEO, following the resignation of
Luke Anderson who had replaced Bob Katsiouleris as
CEO and Managing Director. The Board thanks Sarah
for her strong leadership in guiding the team in addition
to her existing management duties as General Counsel
and Company Secretary.
I would like to take this opportunity to thank you, our
shareholders, for your continued support, and our
employees for their dedication during the year.
Similarly, our successes could not have been achieved
without the support of our offtake partners, suppliers
and the local Eyre Peninsula community.
Rest assured that the Board and Management remain
committed and focused on maximising shareholder
value through a considered and methodical approach
to securing financing and progressing GWP towards a
final investment decision.
Yours sincerely,
Sue-Ann Higgins
Executive Chair
A NNUA L R E P O R T 202 5
5
Acting CEO's report
“Whilst our primary focus remains the initial
Stage 1A+ development of the GWP, the
exciting breakthrough results of producing
HPA to 99.9985% purity and the strong
outcomes of the HPA Scoping Study, show
great promise for future growth.”
Dear Shareholders,
I am pleased to report that during the 2025 financial
year, a number of significant milestones were
achieved, which sees the Company well positioned as
it seeks to secure development funding to support a
final investment decision for the GWP.
Stage 1A+ development funding process
Great White Project milestones
During FY25, due diligence was undertaken by a
select number of capital providers, covering potential
investments through cornerstone equity, global bond
markets, government funding and other instruments
such as royalties.
In July 2024, a binding offtake agreement with Traxys,
was signed, further validating our high-quality kaolin
products across key segments in global markets.
This sees a total of four (4) binding offtake agreements
underpinning the Stage 1A+ project funding process
and long-term economics of GWP.
Additionally, future expansions are supported by
the agreement with Traxys which includes a binding
commitment to purchase 50% of the available
processing capacity, up to 130,000 wmt p.a.
Operationally, we progressed with a range of project
readiness activities in preparation of an anticipated FID
for Stage 1A+ being made. These included:
•
procurement of the long lead items, with almost
all now fabricated, warehoused and ready for
shipment to the mine site,
•
plant optimisation and advanced detailed plant
design and engineering, and
•
project and resource planning.
These now see us well-positioned to commence
efficient construction and delivery of the Project
following an FID being made.
The financial year saw number of significant milestones
achieved towards securing the funding required to
support a final investment decision for Stage 1A+ of the
Great White Project.
6
A NDR OMEDA M E TAL S L I MI T E D
Following the Traxys agreement being signed, the
Company re-engaged with capital market financiers,
with the aim of securing the required funding to support
an FID for Stage 1A+.
A major milestone was achieved when, in March 2025
the Company entered exclusive negotiations with
Merricks Capital for a $75 million debt facility, for which
credit approval was received in June 2025. This facility
is subject to final documentation and represents a
cornerstone of our funding strategy.
Following this, together with Merricks Capital,
we worked on finalising the binding financing
documentation, which are well progressed. Finalisation
and execution subject to finalisation of the balance of
funding required to support and FID.
In parallel, the Company also progressed its funding
process for the balance of Stage 1A+ project funding,
with a select number of capital financiers undertaking
due diligence. This process remains ongoing
and includes discussions for investment through
cornerstone equity and alternative funding structures,
either at the company or project level.
Acting CEO's report
Project readiness
During FY25, the project team has worked diligently
to progress detailed design and engineering,
procurement and project planning activities for
Stage 1A+, in anticipation of FID being made.
Detailed plant design and engineering works were
progressed, and are at an advanced state, which
supported procurement activities.
Key long lead items have been fabricated, and are
currently being warehoused, ready for shipment to the
mine site following an FID being taken.
Reflecting our commitment to disciplined project
planning and execution, the Company has
methodically prepared itself to be in an advanced
state of operational readiness.
This places the Project in the enviable position of being
construction-ready, with the required approvals in
place to commence construction, and a committed
Project Team poised for delivery.
Innovation and future growth
While our primary focus remains the development
of the GWP, the Company also continues to pursue
potential high value-accretive opportunities.
During FY25, we achieved a breakthrough in our High
Purity Alumina (HPA) project, with test work confirming
HPA produced to 99.9985% purity using our proprietary
flowsheet and kaolin from GWP.
This innovation positions Andromeda to enter the highvalue HPA market with a process that is both cost and
carbon efficient.
Following this success, the results of an HPA Scoping
Study were released1, demonstrating market-leading
economics using the Compay's innovative technology.
We look forward to progressing this exciting
opportunity to diversify our product portfolio into a
higher-value product which is on Australia’s Critical
Minerals list.
The HPA Scoping Study supports the commercialisation
of Andromeda’s HPA technology, with the following
key findings:
•
Potential Net Present Value2 of ~$1,010 million and
post-tax internal rate of return (IRR) of 69%
•
Capital expenditure of $155 million giving marketleading capital intensity of $15,459 per tonne of
HPA (US$9,894/t)
1
Refer to ADN ASX dated 18 September 2025 titled HPA Scoping
Study demonstrates market-leading economics of Andromeda’s
innovative technology; all material assumptions and technical
parameters underpinning the estimates and forecast financial
information continue to apply and have not materially changed.
NPV10 using a discount rate of 10%.
2
•
Low-carbon HPA processing technology – with
modelled carbon emissions up to 48% lower than
traditional aluminium alkoxide process
•
Andromeda’s technology has the potential to
disrupt the existing market by producing HPA
sourced from kaolin.
We also advanced exploration at the Eyre Kaolin
Project, earning a 51% interest and initiating further
drilling and analysis during the financial year.
Exploration at the Eyre Kaolin Project progressed, with
drilling at the Chairlift Deposit and reanalysis of historic
drillholes. These activities support our strategy to
expand our kaolin resource base and enhance future
production potential.
Looking ahead
As we move towards a final investment decision, our
focus remains on securing funding and preparing for
construction for the GWP, as well as unlocking further
value by progressing the HPA Project.
Progressing GWP continues to represent the
best opportunity to maximise long-term value for
Andromeda and its shareholders.
We are confident in the Project’s fundamentals and are
excited about the opportunities ahead.
In closing, I would like to thank our team,
Board, shareholders, and partners for their
unwavering support.
Together, we are looking to build a resilient, innovative,
and future-focused industrial minerals company, to
deliver long-term value for you, our shareholders, the
local Eyre Peninsula community and South Australia.
Yours sincerely,
Sarah Clarke
Acting CEO, General Counsel
and Company Secretary
A NNUA L R E P O R T 202 5
7
Operations review
Andromeda is an Australian company with a vision of becoming
“The Great White Mineral Company” and leading the world in the
sustainable supply of superior quality industrial minerals.
Andromeda’s aim is to develop its globally significant,
high-quality kaolin resources into world-class mining
operations that produce superior quality halloysitekaolin to supply global markets.
Andromeda's resources contain a
unique blend of bright kaolinite and
halloysite clays, that can produce a
refined product with a high average
alumina content of greater than
36% and low levels of impurities.
Through developing the Great
White Project, Andromeda
is focused on leveraging the
potential of this unique, worldclass resource for the long-term
benefit of our shareholders, the
local Eyre Peninsula and Traditional
Owner communities and the South
Australian economy.
Kaolin
GREAT WHITE
Kaolin
EYRE KAOLIN
Kaolin
MOUNT HOPE
OVERVIEW OF ANDROMEDA’S CURRENT
KAOLIN PROJECTS AND RESOURCES
GREAT WHITE
PROJECT (GWP)
EYRE KAOLIN
PROJECT
MOUNT HOPE KAOLIN
PROJECT
Flagship project with
15.1 Mt Ore Reserve1
51% interest of Eyre Kaolin
Joint Venture, with four
exploration licences
covering 2,799 km2.
100% interest in tenements,
over which significant areas
of ultra-high bright white
kaolin, with exceptionally low
iron contaminant levels, have
been defined.
The 2023 DFS shows strong
economics through a 3 staged
development over a 28-year
life-of-mine.2
8
Exploration being undertaken
for kaolin with properties
complementary to those of the
Great White Deposit.
1
Refer to Table of Reserves – Great White Deposit on page 40.
The 15.1 Mt Ore Reserves includes 5.1 Mt classed as Proven and 10.0 Mt as Probable.
2
Refer to ADN ASX dated 24 August 2023 titled 2023 Definitive Feasibility Study Results; Andromeda confirms that it is not aware
of any new information or data that materially affects the information included in these market announcements (unless otherwise
stated) and that all material assumptions and technical parameters underpinning the estimates and forecast financial information
continue to apply and have not materially changed.
A NDR OMEDA M E TAL S L I MI T E D
Operations review
The Great White Project
SOUTH AUSTRALIA
100% Andromeda
GWP is a development-ready project with all key
approvals for commencement of construction, with
feasibility studies completed, and binding offtakes
finalised for the first Stage 1A+ phase of production of
100,000 wmt pa.
Andromeda has continued to progress and de-risk the
Project’s development.
GWP is wholly owned by Andromeda and includes
several high-quality deposits of kaolin, containing
naturally occurring kaolinite plates and halloysite tubes.
Through making an anticipated final investment
decision for GWP, Andromeda seeks to become a
globally significant supplier of high-quality kaolin
products to international markets.
Following the signing of a binding offtake agreement
with Traxys, the Company re-engaged with capital
market financiers, with the aim of securing the required
funding to support a final investment decision for
Stage 1A+.
Poochera is located on the Eyre Highway about
635 km northwest by road from Adelaide and
65 km east of Streaky Bay, on the Eyre Peninsula in
South Australia (Figure 1).
On 4 June 2025, Merricks Captial confirmed credit
approval for a A$75 million debt facility to support
the GWP's development, with the Company actively
seeking the balance of funding required to support a
final investment decision.
The Project has highly valued kaolinite and halloysite
mineral deposits with a world-class iron to alumina
ratio, outstanding mechanical strength, exceptional
fired brightness, and distinctive rheological properties.
136°
This led to the signing of a binding offtake agreement
with Traxys1, bringing to four the number of binding
offtakes supporting initial development of the Project.
To support these offtake agreements, the decision was
taken to bring forward Stage 1A+ expansion, for total
initial production to 1000,000 tpa2.
GWP comprises three mining tenements and three
exploration tenements approximately 635 km west by
road from Adelaide. The Project is located within the
District Council of Streaky Bay, approximately 15 km
southwest of the township of Poochera.
134°
During FY25, the Company progressed implementation
of the revised commercial strategy of targeting
high value markets, including high-quality ceramic
tiles, ceramic porcelain tableware and low-carbon
concrete production.
138°
Roxby Downs
Tarcoola
Woomera
S OUTH
AUSTRALIA
Ceduna
32°
ML 6532 – Great White Deposit
Streaky Bay
Great White
Project
Port Augusta
Poochera
Whyalla
Kimba
Lucky Bay
34°
Port Pirie
Kadina
GREAT AUSTRALIAN BIGHT
1
Port Lincoln
Adelaide
36°
Main road
Railway
Town
Lake
Exploration Licence
0
100
200
Kilometres
AND SA11
2
Refer to ADN ASX dated 17 July 2024 titled Binding
Offtake Agreement signed with Traxys.
Refer to ADN ASX dated 6 May 2024 titled
Andromeda expansion plans for The Great White
Project. Andromeda is not aware of any new
information or data that materially affects the
information included in this market announcement
and that all material assumptions and technical
parameters underpinning the estimates continue
to apply and have not materially changed.
Figure 1 The Great White Project regional location map.
A NNUA L R E P O R T 202 5
9
The Great White Project
COMMERCIAL STRATEGY
MARKET TO MINE
Andromeda’s commercial strategy has identified
a product portfolio of high-quality kaolin products
able to command premium pricing, in growing
established markets.
Andromeda’s commercial strategy has identified a high
value-in-use (VIU) for the Great White Project’s core
kaolin product portfolio.
Through Andromeda’s market to mine approach,
white mineral options are proposed for those
strategic market opportunities with the greatest
economic potential.
Andromeda’s commercial strategy uses both top
down, market to mine, and bottom up, mine to market,
approaches to carefully determine the most suitable
markets to engage and strategically supply. The
marketing and sales strategy is essential to ensure the
success of the product in the market.
The commercial strategy methodology assists in
providing direction towards the markets which
are best suited for GWP products, the underlying
drivers for why they are the best suited, and the key
customers, stakeholders, partners and competitors
anticipated response.
Great White CRM™ and Great White KCM™90 were
found to be high value products in the established
and growing markets for high quality ceramic tiles and
ceramic porcelain tableware.
Great White HRM™ is identified as a complementary
product, which requires further customer product
validation which is being undertaken. The identified
uses of Great White HRM™ are as a rheology modifier
and as an additive in the global market for low-carbon
concrete production.
There is also the opportunity to further beneficiate the
Company's kaolin products to produce high-purity
alumina (HPA) which is a high value accretive product.
Branding and market positioning
Andromeda’s core products are ideally suited for, and
targeted at, the high-quality ceramic tiles and slabs,
and porcelain tableware market segments. These
market segments are large and established, where
customers require consistent quality in kaolin products
to be maintained over time.
Table 1 Andromeda’s core and complementary product portfolio.
DESCRIPTION
END-USE
Great White CRMTMP
Fully refined ultra-fine dried kaolin
product with high brightness.
Optimised for use in high-quality
porcelain tableware.
Great White CRMTMT
Fully refined ultra-fine dried kaolin
product with high brightness and
high alumina content.
Optimised for use in high-quality ceramic tiles
and slabs.
Great White KCMTM90
Refined, bright white
kaolin product.
For use in ceramics and can also be used to
improve lower grade resources to increase the
total value of the resultant combined product,
for use in other industry applications.
Great White HRMTM
Concrete additive to
reduce carbon
Optimised for use as a cement additive in the
production of low-carbon concrete.
Highly reactive halloysite-kaolin
rheology modifier
High solids slurries including concrete and a
large range of associated applications where
its suspension properties are very effective.
Befeficiation of GWP kaolin
products into the critical
mineral HPA
Light-emitting diode lighting (LEDs), Lithiumion batteries semi-conductors, and other
high-performance technologies.
COMPLEMENTARY
CORE
PRODUCT
10
High-Purity Alumina
(HPA)
A NDR OMEDA M E TAL S L I MI T E D
The Great White Project
Figure 2 Images show (from left) raw kaolin clay from Andromeda’s GWP, which is then refined and processed, before being
graded and packaged into various products that meet our clients’ exacting specifications.
Target markets
Europe
Key markets –
Spain & Italy
Asia Pacific
Key markets –
India & Japan
Target segments
High-end
ceramics: tiles
and countertops
High-end
ceramics – tiles,
tableware and
countertops
Spain
Countertops⁴
Italy
Stage 1A+ path to market
India
Countertops⁴
#1 importer of kaolin¹
#5 ceramic tile producer²
#2 exporter of ceramic tiles³
#4 importer of kaolin¹
#7 ceramic tile producer²
#4 exporter ceramics tiles³
China
1.
2.
3.
4.
5.
6.
Binding offtakes with
IberoClays, Traxys
#9 importer of kaolin¹
#2 ceramic tile producer (14% CAGR)²
#3 exporter of ceramic tiles³
Japan
#3 importer of kaolin¹
Leading high-end porcelain tableware
producer⁶
Largest market
A broad range of
high-end
applications via
distribution
US$160 billion global market
opening to porcelain slabs
due to silicosis risk
#1 consumer of kaolin
#2 importer of kaolin¹
#1 exporter ceramic tiles²
As above – US$160 billion
global market opening to
porcelain slabs due to
silicosis risks
Stage 1A+ path to market
Binding offtakes with Plantan
Yamada, Traxys
Deep high end-market
Multiple applications
High long-term growth⁵
Kaolin demand to grow by CAGR of
4.6% to 2025; imports CAGR of 6.6%
Stage 1A+ path to market
Binding offtake with Foshan Gaoming
Based on World Bank data.
World production and consumption of ceramic tiles 2022, Manufacturing Economics Studies (MECS), October 2023.
Top 10 countries for ceramic tile exports in 2018-2022 in million square metres, and Compound Annual Growth Rate (CAGR) 2018-22, Baraldi, 2023.
Global Countertop Industry Report, Freedonia Group, March 2023.
HQ Kaolin Market Study, TZMI, 2023.
Kaolin consumption by leading tableware manufacturers in Asia (excluding China), Hart, 2021.
A NNUA L R E P O R T 202 5
11
The Great White Project
To support premium pricing of kaolin products
from GWP into these segments, an extensive
series of product validation work and trials have
been conducted.
Successful product validation programs require
credible independent institutions and/or potential
offtake partners with the requisite industry expertise,
capability, with the requisite equipment to test
and validate the high-quality and value in use of
Andromeda’s products.
For Great White CRMTM and Great White KCMTM90,
this has included:
•
Independent test work, international
benchmarking and value in use analysis,
conducted by Spain’s Institute of Technical
Ceramics (ITC);
•
Product characterisation and international
benchmarking conducted by IberoClays; and,
•
Succesful commercial scale pilot plant ceramic
glaze trials.
The product validation program for these products
determined they:
Binding offtake agreements
The successful results from the product validation trials
supported products marketing efforts, which ultimately
led to the signing of four binding offtake agreements
across global markets, with:
•
Yamada Plantan, a high-quality ceramics and
porcelain tableware manufacturer, for Great White
KCMTM90 into the Japanese market6;
•
Foshan Gaoming for the purchase of Great White
CRMTM and Great White KCMTM90 over 5 years, for
sales into the Chinese market7;
•
IberoClays, the leading formulator of ceramic
tile minerals into Europe, for Great White CRMTM
and Great White HRMTM for sales over an initial
period of 5 years into various markets across the
Mediterranean8; and,
•
Traxys, a leading global industrial minerals trader for
Great White CRMTM and Great White HRMTM for sales
over an initial period of 5 years into various markets
across the Mediterranean9.
Together these four binding offtake agreements underpin
production under Stage 1A+ and support funding
discussions to support a final investment decision
being made.
•
exhibited world class levels of brightness,
aluminium-to-iron ratios and mechanical strength
when fired;
In FY25, further product validation trials were conducted
to extend the use of Great White CRMTM into ceramic
and porcelain glaze formulations10.
•
represented above-market value in use in the
fast- growing large format porcelain and ceramic
tile and glaze segments3,4; and,
The trials assessed the use of Great White CRMTM in two
key glaze formulation segments:
•
supported up to a 20% zircon-displacement
potential in the ultra-white and super-white
ceramic slab segments5.
•
a standard glaze composition to manufacture singlefired wall tiles with a glossy white opaque finish, with
kaolin content of 8.3% by weight; and,
•
a matt “smaltobbio” glaze composition for the
manufacture of porcelain tiles, with a kaolin content
of 22%.
The findings of the trials successfully validated Great
White CRMTM as a high-quality kaolin product for use
in industrial glaze formulations, enhancing Andromeda
Metals’ position as a key supplier to the ceramic industry.
6
3
4
5
12
Refer ADN ASX dated 8 June 2023 titled Investor
Presentation.
Refer ADN ASX dated 19 January 2024 titled Binding Sales
and Distribution Agreement with IberoClays SLU.
Refer ADN ASX dated 18 June 20
Share your feedback
Discover