Second Quarter Activities Report
Released
Released
Announcement PDF
Adelaide Resources Limited
ABN: 75 061 503 375
Quarterly Report
Period ending 31 December 2015
Corporate Details
Overview
ASX Code: ADN (ordinary shares)
ADNO (listed options)
Drummond epithermal gold (100% interest)
Cash at 31 December 2015:
$0.885 million.
Issued Capital at 31 December
2015:
357,922,352 ordinary shares
• 25 hole (1,855 metre) diamond drill programme completed at South
West Limey Dam. Broad intervals of gold and silver mineralisation in
holes testing large surface pathfinder metal anomaly.
• Surface rock chips at Bunyip record results to a maximum of
19.65g/t gold. The strike length of outcropping epithermal veins
at Bunyip is approximately 2,000 metres.
37,222,104 listed options
1,125,000 performance rights
Directors:
Colin G Jackson
Non-executive Chairman
Eyre Peninsula gold (100% interest)
• New Exploration Target estimated for the Barns, White Tank
and Baggy Green gold prospects.
• First pass economic modelling of Barns commenced.
Corporate
Chris Drown
Managing Director
Nick Harding
Executive Director and
Company Secretary
Jonathan Buckley
Non-executive Director
Contact Details
69 King William Road,
Unley, South Australia 5061
PO Box 1210
Unley BC SA 5061
Tel: +61 8 8271 0600
Fax: +61 8 8271 0033
adres@adelaideresources.com.au
www.adelaideresources.com.au
ROVER
Gold/Copper
• Confidentiality agreements executed with third parties reviewing
the Company’s copper projects.
• Mergers and acquisitions review commenced.
Finance
• Underwritten Shareholder Share Purchase Plan and top-up placement
completed.
• Queensland Government Collaborative Drilling Initiative grant of
$100,000 received.
• South Australian PACE programme and Federal Government Research
and Development claim submissions lodged.
• The Company’s cash position stood at $0.885 million at period end.
• Executive director and senior staff salaries significantly reduced.
• Non-core tenements relinquished and office lease renegotiated to
reduce costs.
• Federal Government Exploration Development Tax Incentive scheme
claim submitted.
DRUMMOND
Gold
Northern
Territory
EYRE PENINSULA
Gold
Queensland
South
Australia
MOONTA
Copper
Chris Drown
Managing Director
4 January 2016
Direct enquiries to:
(08) 8271 0600 or
0427 770 653
Managing Director’s review
Exploration programmes in 2015 comprised two
copper-focused drilling programmes at Moonta,
and gold-focused drilling programmes at each
of Eyre Peninsula and Drummond. This quarter
we report on the final results from the maiden
Drummond drilling programme and on advances
made on the Eyre Peninsula.
Epithermal gold deposits, which form our target
at Drummond, can be exceptional prizes in terms
of their size and grade. Drilling at South West
Limey Dam delivered gold intersections that are
encouraging but not spectacular. However, the
drill holes delivered sub-surface information that
confirms the systems are of the right style, and
the geological model employed to be robust.
The quality of the Company’s exploration assets
have not changed, however market conditions
for the resources sector remain challenging.
Accordingly the Board has implemented a range
of measures to conserve cash. Salaries
of executive directors and staff have been
significantly cut, non-core tenements relinquished,
and occupancy and administrative costs reduced.
Preliminary planning of next year’s exploration
programme has commenced, and I join fellow
shareholders in the hope that better market
conditions will prevail in 2016.
Drummond epithermal gold
South West Limey Dam drill programme
completed
We believe that the Drummond tenements
capture a camp of epithermal mineral systems.
In this and the preceding quarter low-cost surface
exploration delineated the sizable Bunyip target,
and we are confident that similar additional work
will deliver further opportunities.
During the quarter the Company completed a
25 hole (1,855 metre) diamond drilling programme
at the South West Limey Dam prospect, with the
programme partly funded through a $100,000
grant from the Queensland Government, payment
of which has now been received.
Good drill results reported in the previous quarter
from the Barns and Baggy Green gold prospects
has led to mineralisation modelling and estimation
of a new Exploration Target that we are confident
can be achieved. A high level scoping study
is underway to establish development potential
of the Barns prospect and to identify various
parameters where additional work can improve
the economic outcome.
Results previously announced contain broad
intervals of gold and silver mineralisation in holes
testing a large surface arsenic anomaly in the
south of the prospect.
An R&D programme of biogeochemical sampling
has been completed at the Empire (100% interest)
copper-nickel-zinc prospect, which is 8km east
of Baggy Green. Assaying of the samples is
underway with results anticipated early in 2016.
We continue to pursue a strategy of seeking
third party involvement in the copper-focused
Moonta and Rover tenements, with several
groups currently reviewing the project data.
At the same time the Company has commenced
reviews of similar businesses to review the many
opportunities that currently present.
Shareholders supported the Company through
their participation in a Share Purchase Plan in
October, and further funds from state government
exploration drilling incentive programmes have
been received or claims formally lodged.
page 2
Gold results of note include 16.8 metres at 0.18g/t,
17.7 metres at 0.17g/t, 19.0 metres at 0.19g/t Au,
and 5.2 metres at 0.34g/t gold. Silver results
include 96.5 metres at 1.01g/t, and 36.2 metres
at 0.91g/t.
A field review completed by consultant Dr Gregg
Morrison, an epithermal specialist, interprets the
South West Limey Dam prospect to be a classic
hotspring geothermal-epithermal system.
Dr Morrison interprets the long intervals of
low grade gold and silver in the latest holes as
good indicators of the system being active and
mineralised, but from the upper part of the system
above the target high grade gold feeder vein zone.
The Morrison review finds there are good
analogues for the South West Limey Dam system
with significant deposits both in the region and
internationally that encourage persistence.
The future exploration challenge at South
West Limey Dam remains the identification of
quartz veins that have better lateral and vertical
Quarterly Report for the period ending 31 December 2015
continuity than those tested to date, and to target
these veins at the depth where high to bonanza
grades of gold are anticipated to occur.
Bunyip target improves with new results
Last quarter the Company announced that
surface exploration had delineated a new
prospect named Bunyip on EPM 25660, leading
to a second programme of rock chip sampling
and mapping in the quarter under review.
One recently assayed rock chip sample recorded
19.65g/t gold and 9.1g/t silver, a high grade
result which confirms that the Bunyip system has
potential to deliver a high grade gold discovery.
Other new rock chip gold results of note include
samples which assayed 0.66g/t, 0.59g/t, 0.41g/t
and 0.41g/t gold.
The combined strike length of outcropping
quartz veins is approximately 2,000 metres.
The main north trending veins are intersected
by a northwest trending vein, with veins in both
orientations mineralised.
Mapping in the vicinity of the Bunyip veins had
discovered occurrences of sinter beds, geyserite
(silica formed around the mouth of hot springs
and geysers) and zones of clay-jarosite-gypsum
alteration. The textures observed in the Bunyip
veins exposed at the current land surface are also
consistent with them being from the upper levels
of an epithermal system.
The observations at Bunyip strongly support the
interpretation that if present, the gold bearing
level of the system remains preserved at depth.
The presence of anomalous gold and of rare high
grade samples such as the recent 19.65g/t gold
sample, are likewise seen as encouraging signs
that drilling to test deeper levels of this system
could prove fruitful.
An aboriginal heritage survey has been
completed over the Bunyip target and did not find
any sites where future exploration activities are
restricted, clearing the way for future drill testing.
Eyre Peninsula gold
Adelaide Resources holds eight Exploration
Licences on the Eyre Peninsula which secure a
total area of 3,123 square kilometres. The Barns,
White Tank and Baggy Green gold prospects are
Quarterly Report for the period ending 31 December 2015
located within 5km of each other and fall on two
wholly owned adjoining tenements.
A diamond drilling programme completed at Barns
and Baggy Green in mid-2015 recorded a number
of significant intersections.
At Barns results included 16.1 metres at 3.06g/t
gold, and 15 metres at 1.25g/t gold. Intersections
recorded at Baggy Green included 11 metres
at 1.87g/t gold contained within a broader zone
assaying 30 metres at 0.86g/t gold, and 8 metres
at 1.22g/t gold.
The 2015 diamond holes add to an extensive
database of historical aircore, reverse circulation
and diamond drilling completed during the
discovery and early delineation stages of the
prospects over a decade ago.
Primary gold mineralisation at each of Barns,
White Tank and Baggy Green is hosted in
multiple stacked moderately west dipping lodes.
Flat lying zones of secondary supergene gold
are developed in weathered rock above the
dipping primary gold lodes, while clay-rich zones
exhibiting total geochemical depletion lie above
the supergene gold horizons.
New Exploration Target
All exploration drill data, incorporating both the
2015 drill programme results and historical drilling
information, was used to produce a new model
of the multiple discrete primary and supergene
zones which host gold mineralisation at each of
Barns, Baggy Green and White Tank.
To a depth of 200 metres below surface the
new Exploration Target is estimated to contain
between 2.5 and 3.5 million tonnes at a grade
ranging between 1.3g/t gold and 2.0g/t gold.
The potential tonnage and grade of the new
Exploration Target is conceptual in nature as
there has been insufficient exploration to estimate
a Mineral Resource, and it remains uncertain if
further exploration will result in the estimation of a
Mineral Resource.
Potential exists to extend the dimensions of
mineralisation at each of the three prospects,
while historical drilling has also identified other
targets in the immediate vicinity which may
contribute additional resources. For example past
page 3
drilling has recorded gold intersections at Barns
West (7 metres at 2.23g/t gold), Barns South
(8 metres at 1.81g/t gold), and Baggy Green North
(10 metres at 2.56g/t gold).
High level scoping study underway
As the Exploration Target detailed above is based
on the modelling of real drill data, the Company
believes it represents a realistic indication of the
approximate size and grade of a resource that
could be estimated with more detailed work.
In terms of contained gold ounces, the magnitude
of the possible resource at Barns, Baggy Green
and White Tank would appear to be comparable
to other South Australian deposits either currently
under development (Havilah Resources Limited
- Portia Gold Mine) or proposed for development
(WPG Resources – Tarcoola Gold deposit).
Many variables which impact economics,
including degree of conversion of Exploration
Target to Resources and then conversion of
Resources to Reserves, mining and metallurgical
parameters, optimal process flow sheet design
and such, remain to be established.
The Company has commenced a high level
scoping study to iteratively investigate these
parameters. The study is expected to define areas
where further exploration drilling has a good
chance of discovering additional mineralisation,
highlight project sensitivities, and clarify where
additional investigations will be required to enable
confident assumptions to be made for inclusion
in more detailed economic modelling.
Empire R&D biogeochemical sampling
An R&D programme of biogeochemical sampling
has been completed at the Empire (100% interest)
copper-nickel-zinc prospect, which is 8km east
of Baggy Green. Assaying of the samples is
underway with results anticipated early in 2016.
Moonta copper and Rover coppergold
The Company is exploring potential opportunities
to co-fund future exploration activities at Moonta
and Rover with the view to both de-risking
the projects financially and accelerating their
development progress. Third parties are currently
reviewing project data from these projects under
confidentiality agreement.
Finance
The Company had $0.885 million in cash and
term deposits at 31 December 2015.
An underwritten Shareholder Share Purchase
Plan offer and top-up placement raised a total of
$922,000 before costs, with a total of 46,376,667
new shares issued to subscribers. A Collaborative
Drilling Initiative grant of $100,000 was received
from the Queensland Government during the
quarter, and R&D and South Australian PACE
submissions lodged which should see additional
cash receipts for the Company.
A number of measures have been implemented
by the Company to conserve cash. Executive
director and staff salaries have been significantly
cut, further non-core tenements relinquished,
and occupancy and other administrative costs
reduced.
The Company continues to await advice on the
Federal Government’s Exploration Development
Tax Incentive (EDI) scheme submission, which if
successful, would deliver an as yet unquantified
tax credit to Australian shareholders. The cost
to the Company of distributing any benefit is
unknown.
Competent Person Statement and 2012 JORC Compliance Notes
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information
compiled by Chris Drown, a Competent Person, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Drown is employed
by Drown Geological Services Pty Ltd and consults to the Company on a full time basis. Mr Drown has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Drown consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
The information contained in the report relating to exploration completed prior to 1 Dec 2013 by the Company and other explorers was prepared and
first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has
not materially changed since it was last reported. The information contained in the report relating to exploration completed since 1 Dec 2013 has
previously been reported in accordance with the JORC Code 2012, see ADN’s ASX releases dated 13 October 2015, 16 October 2015, 23 October